Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.

Slides:



Advertisements
Similar presentations
1 Project Nexus Analysis of impacts and next steps Cesar Coelho Ofgem Project Nexus UNC Workgroup 03 April 2012.
Advertisements

12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
© 2007 E.ON Nexus AQ Requirements To support the current business processes We need to maintain performance and enable market operation as is using current.
PN UNC Workgroup (AQ topic) Meeting 3, 18 th July 2011.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
AQ Appeals and the BTU form Chris Warner. 2 AQ Appeals and the BTU form  Presentation reflects NGD’s view of UNC regime as drafted and is intended to.
SPA Enquiry Process - Additional Requirements for AMR sites ICoSS Presentation.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Long Term Entry Capacity & User Commitment Review Group th September 2008.
Draft Review Proposal 175 Encouraging Participation in the elective DM Regime Phil Broom 25 October 2007.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Joel Martin 23 rd November 2010 MOD 329 – UNC Rules on setting SHQs / SOQs & the Network Referral Process.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
Distribution Network Interruption - Initialisation 28 September 2010.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Customer Charge On behalf of all DNs 25 October 2010.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
PN UNC Workgroup Read Validation 4 th October 2011.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
Impacts of Mod 244 Steve Nunnington xoserve. Background  96.5% of transportation charges based on capacity.  These are dependent on historical throughput.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
Transitional Exit Capacity Proposals -Update Offtake Agreement Workstream, 30 Nov 05 Dave Adlam.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Connected System Exit Points Options for strategic regime change Chris Warner.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
IGT and Shipper Workgroup meeting 28 th February 2011.
Customer Charge On behalf of all DNs 19 November 2010.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
UNC Modification Proposal 0202 National Grid Distribution
Consideration of issues raised by UNC Modification Proposal 0244
Modification Proposal 0283 Update
Chris Warner Network Code Manager
Consideration of issues raised by UNC Modification Proposal 0244
Potential Alternative Proposal – Interaction with Electricity Capacity Market 23 January 2018.
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Proposed Transitional Gas Exit Arrangements
Consideration of issues raised by UNC Modification Proposal 0244
GT Response to Action AMR014 Project Nexus AMR Workgroup 20th July | Energy Networks Association.
DN Interruption Phase II
UNC Modification 0634 (Urgent) – Post Implementation Assessment
PN UNC Workgroup (AQ topic)
Transmission Workstream 05 November 2009
Enabling Large Scale Utilisation of Class 3
Presentation transcript:

Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution – 12 th December 2014

2 Contents  Ofgem Concerns  Overview of Modification Proposal 0244  Specific Points Raised in the Rejection of Mod 0244  FMR should clearly explain how the situation has materially changed from the original proposal (0224)  Are arrangements sufficiently robust to avoid potential gaming?  In light of UNC objectives, are current capacity commitments placed on users adequate?  Are there benefits to aligning the reservation of network capacity by customers with GDN’s reservation of network capacity on the NTS?  Industry Requirements  Next Steps

3 Ofgem Concerns  Insufficient analysis and evidence to support proposal  Analysis  Evidence  How will affected customers be impacted?  As there are no minimum AQ based limitations on eligibility for Class 2 DM Supply Points, we anticipate significant uptake of Users electing into this category. Through increased choice and flexibility, the end user should benefit.  What is the likely impact upon customer charges?  Generally speaking, when forecast income is not fully recovered in the time period specified, subsequent charges would be increased to compensate  The degree to whether and if/how much charges may change will ultimately be determined by the ‘take up’ (utilisation) of the facility by Shippers

4 Overview of Mod 0244  Allows Shippers to amend DM AQs, SOQs and/or BSSOQs  Shipper must change Supply Meter Point (SMP) AQ to >= 73,201kWh  SOQ must be decreased by more than 20%  The SOQ and BSSOQ must be > 1/365 of the AQ AND SOQ must be >= BSSOQ  Site must remain DM for at least 12 months & be liable to applicable DM charges  Existing Ratchet regime continues to apply  Reapplication may be made by sites using the process that fall below mandatory DM threshold, provided they are within same 12 month period referred to above  Where process has been used at least twice at a SMP within 12 months, then Gas Transporter to ensure that subsequent increase to AQ, SOQ and/or BSSOQ be charged retrospectively for capacity charge element avoided in original reduction  Exclude NeXa or ARCA sites

5 Mod 0445 FMR should clearly explain how the situation has materially changed from the original proposal (0244)  Consumer Demand  3 ‘transitional’ Mods (0275, 0405 and 0478) addressed limitations and adverse effects of exit capacity arrangements  Raised to meet requests from Shippers on behalf of their customers that are unfairly constrained from reducing capacity sufficiently in line with actual consumer demand  Initial driver was downturn in economy, but climate has been sustained with little prospect of changing  Sterilisation of Capacity  Current ‘bottom stop’ mechanism has effect of sterilising capacity which could otherwise be released to other Users/Consumers  Enduring solution sought providing flexibility for consumers, while safeguarding Shipper community financially against inappropriate behaviours, such as within year profiling  Project Nexus  Introduction of ‘Class 2’ DM Supply Points, along with advent of AMR and SMART, may see significant numbers of Supply Points elected into this category by Users (increased freedom of consumer choice)  Nexus principles include the desire to maximize read availability and granularity of data, thus leading to more accurate gas allocation and reconciliation  Varied consumer types – need flexibility for a larger range of consumer  Mod 0445 requirements are included within the Nexus requirements. If Mod 0445 is not implemented, this will lead to a change to design. Xoserve may not be able accommodate this change in time for Project Nexus implementation

6 Specific Points Raised in the Rejection of Mod 0244  Are arrangements sufficiently robust to avoid potential gaming?  Previous Mods, in particular 0244B, lacked safeguards against inappropriate behaviour by Users in terms of ‘within year’ profiling of capacity. Measures include protecting the Shipper Community against adverse financial impacts by incorporating a mechanism which has the effect of returning costs of inappropriate profiling of capacity to the Shipper community  In light of UNC objectives, are current capacity commitments placed on users adequate?  Significant risk that if existing capacity arrangements prevail post Nexus implementation, then they may act as a disincentive for Users to freely enter into daily settlement agreements  Are there benefits to aligning the reservation of network capacity by customers with GDN’s reservation of network capacity on the NTS?  GDNs reserve capacity in line with the latest 1-in-20 Demand Forecast, which can go up or down. A mixture of Annual and Daily products can be secured to meet the system requirement. The Exit regime does allow for flexibility as it provides greater choice

7 Shipper Requirements (Evidence)  Data on how many Daily Metered customers may take up the offer of more flexible arrangements?  Can provide data confidentially if desired  Does availability of choice through Project Nexus Class 2 sites increase likelihood of increased use of flexible capacity product?  How many consumers might rely on these arrangements as an alternative to vacating their sites altogether?

8 Next Steps  Need Shipper responses by end January 2015  GDNs to conduct relevant analysis  Submit findings – February 2015?  Resubmit FMR – February 2015?