1 Electricity Baselines for Grid- Connected Renewables: ACM 0002 Issues and Options Michael Lazarus, SEI Workshop on CDM Methodologies and Technical Issues.

Slides:



Advertisements
Similar presentations
BASELINE STANDARD UNFCCC secretariat workshop
Advertisements

UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
Fundamentals of PDD Analysis Recap of Theory and presentation of an illustrative PDD by Steve Thorne Maputo second SSA regional workshop 17 August 2004.
Better Regulation workshop on Rate of Return Guidelines
Bob McConnell, EPA Region 1
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
1 John J. Conti Acting Director Office of Integrated Analysis and Forecasting Prepared for the Energy Technology System Analysis Program (ETSAP) Florence,
Energy and the Pakistani Economy: An Expletory Analysis to 2035 Dr. Robert Looney Professor, Naval Postgraduate School Woodrow Wilson International Center.
Task Force on National Greenhouse Gas Inventories Tier 3 Approaches, Complex Models or Direct Measurements, in Greenhouse Gas Inventories Report of the.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
World Bank Workshop on CDM Methodologies and Technical Issues Associated with Power Generation and Power Saving Project Activities December 3, 2005 Montreal.
Baseline Methodologies for Industrial End-Use Efficiency World Bank Workshop (Montreal, 3 December 2005) “CDM Methodologies & Technical Issues Associated.
Eng Rafik G. M. of Economic and Environment Studies NREA Baseline For Japanese Wind Power Plant Project in Zafarana (Arab Republic of Egypt)
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
UNEP rise centre - Demark Fourth regional workshop and training on “Capacity development for the clean development mechanism” 4-6 April - AIT Thailand.
Baseline methodologies for grid- connected electricity – Context and Introduction to the Combined Margin Baseline Calculation Martina Bosi, World Bank.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
Methodological Issues Arising Across Different Types of Energy Efficiency Projects QualityTonnes Kevin James Montreal December 3, 2005.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
T HE W ORLD B ANK C ARBON F INANCE U NIT Extension of simplified modalities for demonstration of additionality to EE and RE projects.
Standardized approaches in CDM methodologies Daniel Perczyk 7th Joint Workshop 13/03/2011.
Technical aspects of NAMAs: Options and methodologies for developing baselines for different categories of NAMAs* Neha Pahuja Associate.
The Australian Energy Regulator Expenditure Forecast Assessment Guideline Category analysis Connections and Customer Driven Works.
1 Ex Ante Review of the SBD Program Energy Division Staff and Contractors Energy Efficiency Industrial/Agricultural Programs and Portfolio Forecasting.
Beyond offsetting: Ambitious SBL as a national contribution to combat climate change Malin Ahlberg „Designated Focal Point/Designated National Authority“
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Challenges for district heating methodologies Worldbank Workshop on CDM Methodologies 5 December 2005 Lambert Schneider.
Carboncredits.nl Baseline Methodologies Dispatch Analysis Gerhard Mulder Project Officer.
UNFCCC Workshop March Assessment of Additionality  New Guidelines  Lessons learned  Future challenges By Luis de la Torre.
Opting for “Long Term Operations” Technical, economic and regulatory considerations MARC Conference June 8, 2010 Sean Bushart, EPRI Sr. Program Manager.
Determining Priorities for Publicly Funded VET: The Industries’ Shares Model Presentation to the VET Research and Planning Network Forum – 22 April 2005.
Workshop on CDM Methodologies and Technical Issues Associated with Power Generation and Power Saving Project Activities Review of approved and proposed.
Financing climate-friendly projects in the Balkan region DAC PROJECT CAPACITY BUILDING IN BALKAN COUNTRIES IN ORDER TO DEAL WITH CLIMATE CHANGE Prepared.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Practical Experience with Small-scale Projects: Issues and Suggestions Johannes Heister, Lasse Ringius Carbon Finance Unit, World Bank Bonn, 9-10 March.
Strategic Planning for DSM in a Community-owned Utility Presented by Shu-Sun Kwan & Ed Arguello Colorado Springs Utilities 2005 APPA Engineering & Operations.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
1 The Combined Margin Approach: Issues and Options Michael Lazarus, SEI/Tellus World Bank Power Sector Workshop Caesar Park Hotel, Buenos Aires December.
Validation of Scenario Analysis and Control Group Baselines World Bank/PCF Workshop Delhi, Oct. 22, 2002 Trygve Roed-Larsen Det Norske Veritas (DNV)
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Review of CDM methodology development process Annual Meeting of the Host Country Committee on Carbon Finance Washington DC, 15 February 2005 Lasse Ringius.
1 ACT 61 INCREASED INVESTMENT AND SAVINGS SCENARIOS Summary Of Methods Used To Develop Inputs For Analysis of Cost-Effectiveness and Rate Impact John Plunkett.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Evaluation of Wood Smoke Quantification and Attribution RTF PAC October 17, 2014.
Update on methodological work within UNFCCC and future outlook Workshop on CDM Methodologies and Technical Issues 3 rd December, 2005 Montreal, Canada.
Does project reduce, prevent or mitigate the release of 1 or more of the Kyoto gases [See appendix 3]? Does the project remove CO2 or other GHGs from the.
Case Study 1: Comments on Transparency and Conservativeness Alan Silayan klima-Climate Change Center.
El Gallo Hydroelectricity Project PDD Analysis
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003.
E:\The Carbon Market and Small Producers.ppt The Carbon Market and Small Producers 18 July, 2007 STRICTLY PRIVATE & CONFIDENTIAL.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
Some open questions in power sector methodology Sandra Greiner Carbon Finance Unit The World Bank World Bank methodology event Dehli,
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
Draft Seventh Power Plan Meets RTF. Key Finding: Least Cost Resource Strategies Rely on Conservation and Demand Response to Meet Nearly All Forecast Growth.
Case study 1 Review comments on Baseline Methodology Waste heat use project Prepared by Nguyen Van Hanh Vietnam.
Better regulation in the Commission Jonathon Stoodley Head of Unit C.1 Evaluation, Regulatory Fitness and Performance Secretariat General of the European.
© OECD/IEA Do we have the technology to secure energy supply and CO 2 neutrality? Insights from Energy Technology Perspectives 2010 Copenhagen,
Update on Methodological Issues Annual Meeting of the Host Country Committee Köln, May 2006.
New Customer Contributions for the Water Sector: Workshop 4 August 2004.
Kenya’s INDC: Actions in the Energy Sector
Presentation title Methodological tool and data for the development of a SB for the emission factor of an electricity system CDM Standardized Baselines:
LDZ System Charges – Structure Methodology 26 July 2010
EM&V Planning and EM&V Issues
Presentation transcript:

1 Electricity Baselines for Grid- Connected Renewables: ACM 0002 Issues and Options Michael Lazarus, SEI Workshop on CDM Methodologies and Technical Issues Associated with Power Generation and Power Saving Project Activities Montreal, December 3, 2005

2 Overview of Presentation  Fundamentals of the combined margin concept  Key issues and recent developments in ACM0002 –Guidance on OM/BM weights –Defining grid boundaries (imports and exports) –Overcoming data constraints –Factoring in other CDM projects –Retrofits –Improving build margin methods  Moving forward –New issues, methods, processes… mechanisms?

3 Context : The Current CDM Pipeline Source: Jane Ellis, Ellina Levina, The Developing CDM Market, OECD/IEA Information Paper (Dec 2005) Over 28 MtCO2e of the 140 MtCO2e/yr ( ) pipeline are renewable electricity projects 15 MtCO2e are in other categories related to avoided grid electricity (EE and gas) Electricity baseline methodologies have a major impact on CER markets

4 The challenge of getting it “right”  Power sector projects and CERs depend upon an unknowable counterfactual baseline: there is no “right answer”  CERs = MWh project x (EF y,baseline – EF y, project ) [tCO2e/MWh]  Baseline methodologies must consider –Accuracy/credibility –Feasibility (cost, data availability) –Transparency –Consistency (projects, contexts) ACM0002 reflects a balancing of objectives

5 A CDM electricity project can affect:  The choice and/or timing of new power plants (or life extension of existing ones), i.e. the build margin (BM), and/or  The operation of existing power plants, i.e. the operating margin (OM)  Under ACM0002, the baseline emission factor, EF y (tCO2e/MWh) = w OM *EF OMy + w BM *EF BMy  Weights w OM and w BM, are 50% by default. –“Alternative weights can be used as long as…appropriate evidence justifying the alternative weights is presented. These justifying elements are to be assessed by the Executive Board.” Weights matter: OM and BM can differ by 2x or more; Ambiguity is problematic

6 How to determine appropriate weights?  MP commissioned a paper (Synapse) and reviewed various methodology submissions, and found that: –50/50 reasonable for the first crediting period. OM impacts dominate until capacity additions can be deferred/modified, then BM dominates. 50/50 OM/BM weighting corresponds to shift midway during 1st crediting period. –Rationale implies 100% BM weighting for 2nd and 3rd CPs [not adopted at EB22] –Increased weight and potential limitations of existing BM methodology (data availability, sample size, volatility, and the possible reliance on unrepresentative historical experience) suggests review of potential improvements.

7 Project- and context-specific guidance FactorImpact on OM/BM Weights Project size (absolute or relative) No change in weight on basis of absolute or relative size alone (see Biewald paper) Timing of project outputCan increase OM weight for highly off-peak projects (e.g. PV in evening peak regions); increase BM for highly on-peak projects (e.g. AC efficiency). Predictability of project output Can increase OM for intermittent resources in some project/grid contexts. Estimate capacity value. Suppressed demandCan increase BM weight for the 1 st crediting period where conditions likely to persist. System management, other factors No systematic guidance is available at present. PPs propose quantification methods consistent with guidance; no weight exceeds 75% during first crediting period (suggested)

8 Grid Boundaries – the Problem  Boundaries matter: they determine which power plants are included in emission factor calculations –Different choices of boundary lead to more/fewer CERs  Clear grid definitions can be difficult –ACM0002 defines the project electricity system as “the spatial extent of the power plants that can be dispatched without significant transmission constraints”. But what is significant?  Different PPs have used, and DOEs accepted, different grid boundaries in the same country/region Ambiguity is problematic

9 Grid Boundaries – the Solution (for now)  Where grid boundaries are unclear, given country- specific variations in grid management policies: –(a) Use the delineation of grid boundaries as provided by the DNA of the host country, if available; or –(b) In large countries with layered dispatch systems (e.g. state/provincial/regional/national) the regional grid definition should be used. In other countries, the national (or other largest) grid definition should be used by default.

10 Other CDM projects in the Baseline  NM0076-rev is only methodology that accounts for other CDM projects –First come, first served principle (preserves first mover incentives, in principle…)  On a theoretical basis, CDM projects should not be included in baseline (OM or BM calculations). Or should they?  If and when CDM projects become a major contribution to new electricity supply, new approaches may be needed –the “without CDM” baseline may become very hard to detect and measure A problem we should wish for

11 Retrofits (to renewable power plants)  ACM0002 modified to consider (hydro) upgrade projects that increase electricity production –Baseline assumes existing facility would have continued to provide electricity at historical levels (3-5 year average) until the “time at which the generation facility would likely be replaced or retrofitted in the absence of the CDM project activity.”  The date of baseline retrofit/replacement should account for typical equipment lifetime and common practice (in company/sector/country context) Small but important niche market

12 OM and BM methods in ACM0002 ACM0002 currently contains:  4 operating margin options: –Simple OM: Excludes low-operating cost and must-run power plants –Simple Adjusted OM: Includes some must-run/low-cost resources (e.g. hydro) where they dominate a grid –Average OM –Dispatch data analysis OM: Uses top 10% of dispatch  1 build margin option: –the average emission factor of recently built plants (5 most recent or most recent 20% of generation, whichever is greater in MWh);  PP can choose either ex ante or ex post analysis Are they sufficient? Are they clear?

13 Fitting the data to the methodology  Defining the build margin cohort  Estimating plant-specific fuel consumption rates  Filling data gaps (e.g. missing plant data) Is ambiguity problematic here?

14 The Build Margin challenge  How to reduce dependence on lumpy, historical data, where –One or two large plants can have disproportionate influence in calculation –BM emission factor can vary considerably year-to-year –BM cohort may be out-dated (particularly if done ex ante) ….while maintaining transparency and feasibility, and limiting bias?  What role for plans, projections, and models?

15 ACM0002: strengths and weaknesses?  Strengths –Relative simplicity and feasibility: low-cost, manageable data and skill requirements –Incorporation of both OM and BM effects –Relatively consistent and comparable across regions and projects –Relatively transparent and credible: data verifiable  Weaknesses/challenges –Dependence on lumpy, historical data for build margin –Applicability to larger investments, lower-emission (e.g. natural gas) projects –Implementing project-specific and context-specific OM/BM weights –Remaining ambiguities and data constraints –Reflection of local market and operational conditions

16 Moving forward ….in what direction(s)?  Enhancing ACM0002 –Specific algorithms or unambiguous criteria for alternative OM/BM weights? Additional guidance for other conditions? –Standardized methods to fill “data gaps”? –More forward-looking, less volatile build margin methods? –Other issues, e.g. CDM projects in baseline, grid boundaries, etc?  Thinking beyond ACM0002 –Alternatives to ACM0002, simpler or more complex? –Develop new processes for resolving methodology issues? What might they look like? –Complementary approaches and mechanisms to support low-GHG power sector investments and strategies?