Approaches to Historic Bridge Rehabilitation Case Study #4

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Seminar Concrete Decks
Advertisements

Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
Actions and Retrofit of Post Earthquake-Damaged Bridges
Drystone Retaining Walls Presentation to Bridge Owners Forum at Kings College, Cambridge 13 May 2008.
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
SPEED and STRENGTH SPEED and STRENGTH  When speed of construction and strength of slab are your concerns, the KWIK SLAB system is your fast and strong.
Neptune Research Inc. Introduction For more than 25 years, Neptune Research Inc. has focused its strategic research initiatives on the development, manufacturing.
Update - Subcommittee on Bridges and Structures Kelley Rehm, PE July 2011.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Baudette, Minnesota/Rainy River, Ontario International Bridge
ENG-1010 Lecture 16 Bridge Design.
1 South Slough Bridge # APWA National Project of the Year Transportation Category, Projects Less Than $2 million.
Carrollton Bridge Jonathon L. Sera, P.E. Approaches to Historic Bridge Rehabilitation Case Study #3 1.
Chapter 34 Bridge Construction.
Bridge Engineering: Lessons from Rome to Tacoma
Reconstruction of the Eads Bridge Highway Deck
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
 Project Delivery  Design Considerations  Lessons Learned.
Trestle Rebuilds The Continuing Quest to Fill the Gap
STAINLESS STEEL AS REINFORCEMENT BY- Bhrugesh Patel SD-1210 STRUCTURAL DEPARTMENT CEPT UNIVERSITY.
Arch 04 UNIVERSITY OF MINHO 0 Daniel Oliveira & Paulo Lourenço U N I V E R S I T Y O F M I N H O Barcelona, November REPAIR OF STONE MASONRY.
Bridge Maintenance and Repair.
FRP Reinforcement of Concrete
ODOT Policy for Deck/Slab Closure Pours Sean Meddles, P.E. Assistant Administrator ODOT Office of Structural Engineering.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
Fiber-Reinforced Polymer (FRP)
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Superstructure Replacement Substructure Repair Rehabilitation of I-95 Bridges 11 Bridges Along I-95 Corridor
Hays Street Bridge Rehabilitation Patrick Sparks, P.E. Approaches to Historic Bridge Rehabilitation Case Study #1 1.
The ground must push up as hard as the building pushes down
Lake Park North Lion Bridge Rehabilitation Milwaukee, Wisconsin Darrell Berry, PE, SE Approaches to Historic Bridge Rehabilitation Case Study #2 1.
Villanova University Dept. of Civil & Environmental Engineering CEE 8414 – Structural Dynamics Northridge Earthquake 1 Northridge Earthquake - Concrete.
Leadership Summit Cheiko High, Deputy Commissioner, CDOT.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Other Construction Projects
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
State Road 5 over Eel River Bridge Rehabilitation DES# South Whitley Community Public Library Thursday, February 5, :30 p.m. Please silence.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.
Our Trail Journey So Far and The Adventure Ahead.
1905 NW Thurman St Bridge. Project Location Thurman St Bridge.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
Repair and Strengthening of Concrete Bridges and other Structures
Stenton Avenue Masonry Arch Rehabilitation Approaches to Historic Bridge Rehabilitation Case Study #1 Michael J. Cuddy, P.E. Principal Kara Russell Cultural.
Construction of the Route 460 Connector Phase 1 Breaks, Virginia Timothy Barry, PE Robert Bennett, EI June 10-13, 2012 Pittsburgh, PA.
Approaches to Historic Bridge Rehabilitation Case Study #2
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
The Wexford Bridge. Group 17 Vincent Carey Amy Fitzpatrick Patrick Gibbs Micheal McCarthey.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Bridges and Loads Modified by Matthew Silbernagel.
Concrete Repair.
Investigation of the Effects of End Region Deterioration in Precast, Prestressed Concrete Bridge Girders Royce Floyd, Cameron Murray, Darion Mayhorn DONALD.
Posting Bridges for Specialized Single-Unit Trucks
High Bridge Re-Deck Project
Approaches to Historic Bridge Rehabilitation Case Study #3
Project Purpose and Objective
Blatnik Bridge Management Study
College II Tank Interior Recoating Award of Construction Contracts
FRP Wraps for Next Generation Sustainable and
A New Precast, Pre-stressed Bridge Deck System
ALDOT Pavement Preservation Policy
Bridge Engineering: Lessons from Rome to Tacoma
Board of Commissioners Meeting
Are We Abandoning Bridges with Remaining Life?
Structural Stability and Strength
National Organization of Minority Engineers Leadership Summit
Ron Hancock, PE NCDOT State Construction Engineer
Presentation transcript:

Approaches to Historic Bridge Rehabilitation Case Study #4 Robert A. Booth (Winchester) Bridge Benjamin Tang, P.E. Bridge Preservation Manager 1

Robert A. Booth (Winchester) Bridge Case Study #4 One of several reinforced concrete ribbed deck arches designed by Conde McCullough and built in 1924. Architecture features include Roman & Gothic details, series of arches, cantilevered balconies and lancet-arched balustrade railings. Length: 1 @ 62’ + 7 @ 112’ + 1 @ 41’-8” = 887’- 8” Span Type: 7 delicate arched spans, open spandrel columns, lancet-arched spandrel walls supporting the deck & roadway 2

Winchester Bridge / North Umpqua R. Case Study #4 Date of Rehab: 2007 Cost of Rehab Project: $9.93 M low bid Designed by Conde McCullough, 1922; Rehab. By Mats Halvardson, 2007 Client/Owner: Oregon Department of Transportation Contractor: Hamilton Construction Co., Springfield, OR Amacher Park OR-CA RR I-5 Steel Bridge Kolhagen House Winchester Bridge Parking Fish Ladder Winchester Dam 3

Significant Issues Associated With Project Case Study #4 Historic Bridge Preservation Cultural Resources Tourism Safety Corrosion & Deterioration Capacity & Load Rating 4

Historic Bridge Preservation Case Study #4 Dedicated multi-disciplinary team (structural, mechanical, corrosion, and electrical engineers) Identify, assess and prioritize needed bridge work Methods: pressure grouting or pumped concrete repairs, FRP composites strengthening, precasting of replacement elements, cathodic protection, recoating, microsilica deck overlay… 5

Cultural Resource & Tourism Case Study #4 National Register Listed Winchester Dam (ca. 1880) Amacher Park Oregon & California Railroad Corridor (ca.1870’s) 1904 Kolhagen Ranch House Boat ramps and sport fishing along the river Historic steel bridge (Interstate 5) upstream. Access Parking Pedestrian & Bikers Fish ladder viewing area 6

Safety 19’-4” Narrow Roadway Width No Curb/Shoulders Sight Distance Case Study #4 19’-4” Narrow Roadway Width No Curb/Shoulders Sight Distance Straightening a curve on the North end 7

Comparison of original deck and new deck Case Study #4 Comparison of original deck and new deck 8

Case Study #4 36-inch rail 42-inch rail Stealth Rail – Precast in 3 staged fabrication 9

Corrosion and Deterioration Case Study #4 Beams – worst at joints Steel rebar with section loss Cracks and spalls Drainage 10

How Significant Issues Were Resolved Case Study #4 New widened deck, sidewalk, stealth rails New deck joints (asphalt plug joints) New brackets and wider overhangs Existing - Removed to sound concrete Pressured grout or Pumped concrete into formed repairs CFRP strengthening/structural capacity (H-15 to HS20) Added drainage for run-off in new deck 11

Lessons Learned/Conclusions Case Study #4 Bridge Preservation Program and Policy in General Long-term objectives with funding support Sustainable program strategies Extending service life of historic structure Implement “just in time” preservation strategies Corrosion protection systems Corrosion resistance and high performance materials (FRP, SS…) Trained staffs Developed multi-disciplinary engineers in bridge preservation NACE, SSPC, NHI, training/certification 12

Lesson Learned/Conclusions Case Study #4 Early coordination with all stakeholders and regulators Contractor’s experience and prequalification Public support to allow closing the bridge Continuous construction support 13