ISUAL Test Verification Matrix H. Heetderks. TRR December, 20002NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Verification Matrix -- Imager Related.

Slides:



Advertisements
Similar presentations
000509EISPDR_SciInvGIs.1 EIS Performance and Operations Louise Harra Mullard Space Science Laboratory University College London.
Advertisements

FloormapVS2i.
Programmable Interval Timer
This lesson covers the following outcomes Unit 54 P1, P7, P8 Unit 6 P10, P11.
Data Acquisition Concepts Data Translation, Inc. Basics of Data Acquisition.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
Digital Voice Communication Link EE 413 – TEAM 2 April 21 st, 2005.
GLAST June 8, 2000, P. Roger Williamson, BFP - 1 Balloon Flight Planning Roger Williamson June 8, 2000.
STARLight PDR 3 Oct ‘01C.1 Hansen STARLight Peter Hansen PROJECT OVERVIEW.
Page 1 GLAST LAT ProjectAugust 30, 2004 GLAST Large Area Telescope: LAT Accelerometer and Thermal Instrumentation Review Presented by Leonard Lee John.
ROCSAT-2 Topic: Thermal Analysis Results - ISUAL Scientific Payload (with STR and IRU) Jeng-Der Huang ( 黃正德 )
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
ISUAL Long Functional Test H. Heetderks. TRR December, 20012NCKU UCB Tohoku ISUAL Long Functional Test Heetderks Basic DPU Function Verify Power on Reset.
ISUAL Sprite Imager Electronic Design Stewart Harris.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
ISUAL Spectrophotometer Electronics C. Ingraham. 2NCKU UCB Tohoku CDR 9 July, 2001 Spectrophotometer Electronics C. Ingraham SP Electronics Functions.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
ISUAL Instrument Software S. Geller. CDR July, 2001NCKU UCB Tohoku ISUAL Instrument Software S. Geller 2 Topics Presented Software Functions SOH Telemetry.
Verification by test and quality assurance
STATUS REPORT OF FPC SPICA Task Force Meeting March 29, 2010 MATSUMOTO, Toshio (SNU)
20a - 1 NASA’s Goddard Space Flight Center Attitude Control System (ACS) Eric Holmes, Code 591 Joe Garrick, Code 595 Jim Simpson, Code 596 NASA/GSFC August.
MG 1/10/01 1 PCS SMOV-3B Review Objectives Overview Activity Descriptions Requirements.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
Array Photometer Circuit Design and Interface Tohoku University CDR Meeting, July 2001.
1 An Observatory for Ocean, Climate and Environment SAC-D/Aquarius HSC - Radiometric Calibration H Raimondo M Marenchino 7th SAC-D Aquarius Science Meeting.
CDE CDR, September 14, 2004 Your Position, Your Name 1 GATS AIM Science Team Meeting January 23-24, 2007 CIPS Calibration Review, Aimee Merkel, Bill McClintock.
NCKU UCB Tohoku ISUAL / ROCSAT-2 August 2001 Sprites observation by ISUAL on the ROCSAT-2 satellite J. L. Chern, R. R. Hsu, H. T. Su, A. B. Chen, and L.
Henry Heetderks Space Sciences Laboratory, UCB
C. Ingraham5-7 March 2001Data Processing Unit IFR1NCKU UCB Tohoku ISUAL Data Processing Unit (DPU) C. Ingraham.
ROCSAT-2 Current Status of ISUAL Project Yeou-Shin Chang of NSPO Jyh-Long Chern of NCKU Henry Heetderks of UCB October 3, 2001.
START NICMOS COOLING SYSTEM ACTIVITY SUMMARY. 1/25/01Ken Pulkkinen2 START NCS ACTIVITY Applicable SMOV Requirements: J NICMOS Cooling System.
ISUAL Sprite Imager Interface and Status Review Stewart Harris.
THEMIS/GBO 1 Banff, March 29, 2006 Agenda – GBO Review.
ISUAL Data Formats & Science Data Processing S. Geller.
SDR 7 Jun Associated Electronics Package (AEP) Curtis Ingraham.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
IntroductiontMyn1 Introduction MPEG, Moving Picture Experts Group was started in 1988 as a working group within ISO/IEC with the aim of defining standards.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
ROCSAT-2 Current Status of ISUAL Project Jyh-Long Chern of NCKU Yukihiro Takahashi of Tohoku University Henry Heetderks of UCB February 28, 2002.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
ROCSAT-2 Critical Design Review ISUAL Thermal Interface Design / Analysis Report Jeng-Der (J.D.) Huang ( 黃正德 ) Tsung-Yao (Andy) Chen ( 陳宗耀 ) Jih-Run (J.R.)
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB Flight Software Design Peter Harvey University of California 1.
4/27/ T7C - DCM Software Interface ISUAL DPU-to-DCM Interface and Protocol 8644-T7C Rev Description Date A Initial release 20-Feb-2001 SG B MMCB.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
ISUAL Design Concept S. Mende. SDR 7 Jun NCKU UCB Tohoku ISUAL Design Concept S. Mende Sprite Example Sprite Image obtained by Berkeley/NCKU 1999.
ISUAL Imager of Sprites and Upper Atmospheric Lightning (ISUAL). S. B. Mende UC Berkeley.
ISUAL Spectrophotometer H. Heetderks. SDR 7 Jun 20002NCKU UCB Tohoku Spectrophotometer H. Heetderks Spectrophotometer Description Six Channels Identical.
ISUAL System Design H. Heetderks. PDR 31 August 2000NCKU UCB Tohoku ISUAL System Design H. Heetderks 2 ISUAL Operations Overview.
# x pixels Geometry # Detector elements Detector Element Sizes Array Size Detector Element Sizes # Detector elements Pictorial diagram showing detector.
NCKU_UCB_TohokuISUAL-IFR : DCM (version 2.0) July 9, 2001Tong-Long Fu 1 Data Compression Module ( DCM ) Tong-Long Fu Laboratory of RF-MW Photonics, Department.
OPTICAL SENSORS DESIGNED IN FRAME OF THE AEROFAST PROJECT IN SPACE RESEARCH CENTRE PAS On board instrumentation Pyroelectric sensor Imaging Multispectral.
ISUAL System Design Summary H. Heetderks / S. Harris.
Power Philip Luers NASA/GSFC Code 561 August 16-17, 2005.
Solar Probe Plus – FIELDS Main Electronics Package
Gayle K. Martin November 14, 2016
TEMPO Instrument Update
INSTRUMENT DATA PROCESSING UNIT (IDPU) REQUIREMENTS
ISUAL Imager Stewart Harris.
ISUAL Product Assurance
ISUAL Associated Electronics Package
TEMPO Instrument Update
Image Stabilization System (ISS)
Henry Heetderks Space Sciences Laboratory, UCB
Launch and On-orbit Checkout
MDP / DHU - DR Usage vs downlinks -
Presentation transcript:

ISUAL Test Verification Matrix H. Heetderks

TRR December, 20002NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Verification Matrix -- Imager Related System Specification Section Level of Test NumberVerification Requirement Assembly Proc Measure wavelength response of Imager with each filter Imager A Measure worst case transfer time for filter mechanism Imager / AEP A.LF Measure Imager FOV Imager A Measure Imager Pixel Size Imager A Measure Exposure Time Range in Imager Imager A Measure CCD Read out Time Imager / AEP LF Measure Imager Modulation Transfer Function Imager A Measure Imager Signal to Noise Ratio Imager A Measure Imager Frame Rate in Sprite Continuous Mode Imager / AEP LF Measure Imager Frame Rate in Sprite Burst Mode Imager / AEP LF Measure Imager Exposure Time in Aurora/Airglow Mode Imager / AEP LF

TRR December, 20003NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Verification Matrix -- SP Related System Specification Section Level of Test NumberVerification Requirement Assembly Proc Measure wavelength response of each SP Module SP B Measure Spectrophotometer FOV SP B Verify co-linearity of Spectrophotometer Boresites SP B Measure Sampling Rate of Spectrophotometer SP / AEP LF Measure Spectrophotometer Signal to Noise Ratio SP B2

TRR December, 20004NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Verification Matrix -- AP Related System Specification Section Level of Test NumberVerification Requirement Assembly Proc Measure Array Photometer Wavelength Response AP C Measure Array Photometer FOV AP C Measure Alignment of Array Photometer Boresite AP C Measure of Array Photometer Exposure Time AP / AEP LF Measure of Array Photometer Signal to Noise Ratio AP C2

TRR December, 20005NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Verification Matrix -- AEP and System System Specification Section Level of Test NumberVerification Requirement Assembly Proc 3.2.1Verify Operation and Effectiveness of Data Compression Full System LF on Sample Images 3.2.2Verify that new Software revs can be uplinked to the Instrument AEP LF 3.2.3Verify Operation of Full Memory AEP LF 3.2.4Verify that Science Data Interface Operates per Requirements of the ISUAL-S/C ICD AEP LF 3.2.5Verify Commands and SOH Operate per Requirements of the ISUAL-S/C ICD AEP LF 3.2.6Measure Power Consumption in all Operating Modes Full System A. LF 3.2.7Verify that ISUAL Instrument correctly processes the PPS Signal from the Spacecraft AEP LF 3.2.8Verify that Ancillary Data from the S/C are properly put into SOH Telemetry AEP LF 3.3.1Verify Size and Weight of each of the four Components Full System One Time Test

TRR December, 20006NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Verification Matrix -- AEP and System System Specification Section Level of Test NumberVerification Requirement Assembly Proc 3.3.2Verify Mounting Surface Flatness of each ComponentFull System One Time Test 3.4.1Verify First Modal Frequencies of Each Component ETU System ETU Vib Test 3.4.2Verify that Design will survive Mechanical ETU System ETU Environmental Requirements Vib Test 3.4.3Thermal Environmental Requirements Verification Full System T/V Test 3.4.4Show that Instrument will survive depressurization rate Analysis 3.4.5Verify Instrument will meet EMC Requirements Full System EMC Test 3.5 Verify presence of name plates Full System Inspection 3.6 Measure alignment of Boresite with respect to the Full System A1, B1, C1 Instrument Alignment Cubes

TRR December, 20007NCKU UCB Tohoku ISUAL Verification Matrix Heetderks ISUAL System Specification The following slides show the requirements on the ISUAL system as taken from UCB drawing number 8821-W7 Revision A ISUAL System Specification

TRR December, 20008NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Selected Bands The Sprite Imager shall be programmed to capture a series of images through one of the selected spectral filters specified in the following table. Band NumberB1B2B3B4B5B6 Center Wavelength (nm)690 ± ± ± 3630 ± ± 3625 ± 25 50% Bandwidth, 125 ± 157 ± 26 ± 27 ± 26 ± 2450 ± 40 or FWHM (nm)

TRR December, 20009NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Band Selection Time The Imager filter mechanism will change between any two filters in a time equal to or less than one minute.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Field Of View The Sprite Imager shall have a field of view (FOV) equal to 20  x 5 .

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Instantaneous Field Of View The imager’s instantaneous field of (IFOV) for each CCD pixel shall be no larger than 0.04  x 0.04 .

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Exposure Time The imager exposure time shall be programmable and shall at least cover the range from 1 msec. to 0.5sec.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks CCD Readout Time CCD readout time shall be 12 milli-seconds or less for the complete 512 x 128 image.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Modulation Transfer Function With 1 msec frame time, the square wave Modulation Transfer Function (MTF) at the Nyquist frequency shall be no less than 0.20.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Signal To Noise Ratio The signal to noise ratio (SNR) for each spectral band is specified in the following table. Frame Time = 1.00msFrame Time = 30.00ms Radiance (MR) Electrons SNR Note that: The data shown in the above table shall be finalized in the CDR.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Imaging Modes Three separate modes are provided for the operation of the Sprite Imager. In all of the modes any of the six Imager filters may be selected by ground command and that filter will remain in operation until it is changed by further commands from the ground.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Sprite Continuous Mode In the Sprite Continuous Mode, the ISUAL will wait for pre-cursor lightning to trigger the instrument and will then collect images at a rapid framing rate. Any one of the six Spectrophotometer channels may be selected by ground command as the trigger. Following a trigger, images will be collected at a fixed frame rate of 100 +/- 20 frames per second, where a frame is defined as 512 x 128 pixels. In the presence of a continuing source of trigger events, the CCD read out rate is sufficiently fast to support this rate with out any interruption or significant dead time.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Sprite Burst Mode In the Sprite Burst Mode, the ISUAL will again wait for pre-cursor lightning to trigger the instrument and will then collect images at a rapid framing rate. Any one of the six Spectrophotometer channels may be selected by ground command as the trigger. Following a trigger, a block of up to 8 images will be collected at a rate of up to at least 575 frames per second. Since images are being continuously taken and overwritten while the system is waiting for a trigger, the camera can capture the images of an event up to 5 milli-seconds prior to the trigger. In this mode the CCD read out rate is too high to maintain a continuous read out in the presence of a high rate of back-to-back trigger events. Following each trigger event, a minimum time of not more than 100 milli-seconds is required to flush out the CCD camera before it is ready to respond to the next trigger.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Aurora / Airglow Mode In the Aurora/Airglow Mode, one of the airglow lines on the filter wheel will be selected and images will be taken a continuous rate of one per second. The length of the exposure time is programmable and can be up to 1 second. When the Sprite Imager is used to image the aurora, filters B2, B4, and B5 will typically be used and the exposure time will be programmed to be between 0.1 sec and 0.5 sec. When it is used to image airglow, filters B3 and B6 will typically be used with the same range of exposure time.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Selected Bands The Spectrophotometer shall include six photometers to detect the photonic signals from lightning associated events in the spectral bands specified in the following table. Band Number B7 B8 B9 B10 B11 B12 Center Wavelength 210 ± ± ± ± ± ± 3 ( nm ) 50% Bandwidth, 125 ± ± 20 6 ± 2 6 ± ± 157 ± 2 or FWHM ( nm )

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Field of View Each photometer shall have its field of view (FOV) the same to within 20% as that of the Sprite Imager.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Boresight Each photometer shall be boresighted according to the Sprite Imager within ± 0.5 .

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Sampling Time The sampling time of each photometer is fixed at a rate of 10 K samples per second..

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Signal to Noise Ratio The signal to noise ratio (SNR) for each band is specified in the following table. Frame Time = 0.10msFrame Time = ms Radiance (MR) electrons 2.67E E E E E E+07 SNR 5.16E E E E E E+03 Note that: The data shown in the above table shall be finalized in the CDR.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Selected Bands The Array Photometerer shall include two channels to detect the photonic signals from lightning associated events in the spectral bands specified in the following table. Band Number B13 B14 Center Wavelength ( nm ) 350 ± ± 10 50% Bandwidth, or FWHM ( nm ) 100 ± ± 10

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Field of View Each channel shall have an array of 16 pixels each with a field of view (FOV) of 20°x 0.2°. The combined FOV for a channel shall be equal to 20  x 3.2°.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Boresight The Array Photometer shall be boresighted such that the center of the FOV of the AP is aligned with the center of the FOV of the Sprite Imager.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Exposure Time The Array Photometer has at least two sample rates selectable by ground command, one at 20 kHz and one at 2khz. Additional sample rates may be provided.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Signal to Noise Ratio The signal to noise ratio (SNR) for each photodetector is specified in the following table. Frame Time = 0.05msFrame Time = 5.00ms Radiance (MR) electrons 8.33E E E E E E+05 SNR 9.13E E E E E E+02 Note that: The data shown in the above table shall be finalized in CDR.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks 3.2.1Data Compression Capability In order to optimize scientific data usage, the electronics subsystem shall be capable of compressing data by a combination of the removal of undesirable data, such as dark signals and other background signals and/or standard lossless data compression techniques. A total compression of at least a factor of 3 shall be achieved.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Software On-Orbit Modification A complete set of the software which controls the operation of the instrument is stored in ROM in the DPU. This software will automatically execute when the instrument is first powered. Once the instrument is turned on, control can be transferred to any of three other versions of the code which are stored in EEPROM and which can be modified by ground command. This allows modification of the operating software following launch of the instrument.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Data Storage Memory A memory of 256 megabytes capacity is included in the instrument to store science data between the time it is collected and the time it can be compressed and transferred to the spacecraft.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Science Data Interface The interface between the AEP and the spacecraft for the transmission of science data shall be as defined in section , ISUAL Scientific Data Link, of Astrium document RS2SC-CDRL-029b, ISUAL – Spacecraft Interface Control Document.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Command and SOH Interface The interface between the AEP and the spacecraft for the transmission of commands and Status of Health (SOH) information shall be as defined in section 4.6 Command and Data Handling Interfaces of Astrium document RS2SC-CDRL-029b, ISUAL – Spacecraft Interface Control Document.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks 3.2.6Power Requirements The ISUAL instrument shall be powered by either of two redundant 28 volt services provided by the spacecraft. Power drawn by the ISUAL shall be equal to or less than the following: Average power: 40 W (per orbit) Peak Power: 100 W (with Duty Cycle < 10%) Standby/House Keeping: 5 W

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Instrument Timing –The ISUAL instrument shall accept and process a sync pulse signal of 1 Hz from the spacecraft. This will be used with a suitable periodic command from the spacecraft to maintain an image of the spacecraft clock in the ISUAL.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks 3.2.8Ancillary Data The ISUAL shall receive and process ancillary data from Spacecraft as follows. Requirement On Board Accuracy Absolute Time UTC (msec) 1 [TBR] Spacecraft Position [TBD] Spacecraft Velocity (m/s) 5 Spacecraft Attitude (degrees) [TBD]

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Size and Weight Total weight of the ISUAL shall be no more than 35 kg. This weight shall include all growth contingency, intra-instrument harnessing and attachment hardware to the ROCSAT-2 Spacecraft. The size of each component of the ISUAL shall be within the maximum dimensions given on the following mechanical ICD drawings: Dwg. No.RevDescription 8452-A4IImager Mechanical ICD 8453-A4FSpectrophotometer Mechanical ICD 8454-A4CArray Photometer Mechanical ICD 8455-A4EAssociated Electronics Package Mechanical ICD

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Mounting The ISUAL mounting surface flatness shall be cm/cm.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Minimum Natural Frequencies ISUAL components (black boxes) shall be designed such that the minimum natural frequency is greater than 100 Hz in any direction. This will be verified by doing a modal sweep during the component qualification vibration test.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks 3.4.2Mechanical Environmental Requirements The ISUAL shall be designed to survive the vibration and shock environment defined in section Mechanical environment of Astrium document RS2SC-CDRL-029b, ISUAL – Spacecraft Interface Control Document.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Thermal Environmental Requirements The ISUAL components shall be designed to survive operation in vacuum over the temperature ranges specified below: Item Operating Temperatures Non-operating Temperatures 1. Sprite Imager -20  C. to +30  C. -35  C. to +50  C. 2. Spectrophotometer -20  C. to +30  C. -35  C. to +50  C. 3. Array Photometer -20  C. to +30  C. -35  C. to +50  C. 4. AEP -40  C. to +50  C. -55  C. to +55  C. 5. CCD Heat Sink +30  C. max. with 5 Watts power input -35  C. to +50  C.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks 3.4.4External Pressure Extremes All ISUAL components shall be designed to meet their performance requirements after exposure to air transport and launch vehicle boost, ascent pressure environments. Consideration shall be given to provide adequate venting of each structural component, in order to prevent significant loadings due to the ambient pressure differentials encountered during flight.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Electromagnetic Compatibility Requirements The ISUAL shall conform to the ECM requirements defined in section EMC Requirements of Astrium document RS2SC-CDRL- 029b, ISUAL – Spacecraft Interface Control Document.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks 3.5Nameplates and Product Markings All ISUAL components shall be permanently and legibly identified in accordance with the Product Assurance Program Plan in the PAR Document.

TRR December, NCKU UCB Tohoku ISUAL Verification Matrix Heetderks 3.6Alignment Requirements The optical axis of each ISUAL sensors will be internally aligned with its own alignment reference cube and the residual angle measured to an accuracy of 0.1 degrees or better.