1 CHARLEY CREEK ALLUVIAL REE PROJECT TMS2013 Scoping Study Presentation Developing one of the world’s largest, lowest capital cost, rare earths projects.

Slides:



Advertisements
Similar presentations
1 ASX Listing Rule Amendments – Reporting Requirements for Mining Companies and the JORC Code 2012 ASX Presentation 2013.
Advertisements

Adapting to a Changing Energy Environment Russ Girling, President and CEO, TransCanada Corporation May 15, 2012 STRIKING A BALANCE IN THE MIDST OF CHANGE.
2008 Second Quarter Results TSX: LUN NYSE: LMC OMX: LUMI.
1st Quarter 2012 Results May 10, 2012 Tom Mair President and CEO.
Queensland Industrial
April 2015 Charts of Interest. 2 Soaring Valuations, Stalling Momentum? Since its post-financial crisis nadir in March 2009, the S&P 500 Index has soared,
The Business Plan.
Bokan Dotson Ridge Heavy Rare Earths. This presentation may contain forward-looking statements including, but not limited to, comments regarding the timing.
A Growth Company Producing Rare Precious Metals Palladium & Platinum June 7, 2000.
1 NYSE MKT: REE & TSX: RES Bear Lodge Critical Rare Earth Project Technology Metals Summit – March 2013 A Year of Dramatic Change.
Moving into iron ore, targeting Africa Africa Iron Ore Conference Presentation by Ernst Venter Executive General Manager, Business Growth Exxaro Resources.
Emerging Markets Dividends An Enduring Theme September 2012.
1. Investor Presentation April Disclaimer DISCLAIMER: This presentation contains forward-looking statements including but not limited to comments.
Understanding and Valuating Exploration Companies 24 May 2007 Shane Hunter.
Arafura Resources Limited (ASX: ARU) Arafura Resources Limited 2 nd Annual Technology Metals Summit April 2013, Toronto.
Kentor Gold March 2012 Investor Presentation. Focus 2 1.Andash Gold Copper Project – Kyrgyzstan 2.Jervois Copper Gold Project – Australia 3.Murchison.
CAUTION CONCERNING FORWARD-LOOKING STATEMENTS This presentation contains “forward-looking information” within the meaning of Canadian Securities legislation.
4/16/2017 SHERRITT INTERNATIONAL Ambatovy Nickel Project: A Progress Report March 2008.
Red Rock Energy Inc. (TSX-V: RRK) May 9, This presentation may contain forward-looking information including expectations of future production,
Rare Earths Power Breakfast March 7, 2011 Don Bubar, President & CEO.
The implications of the new JORC Code (2012) with regard to disclosure
Agnico-Eagle Mines Limited1. 2 Growth Strategy Building Value Through Production and Reserve Growth Produce more gold targeting over 1.2 million ounces.
SMH Capital Houston, TX February 25, Forward Looking Statement The statements made by representatives of Natural Resource Partners L.P. (“NRP”)
Coal Exploration Projects Queensland Exploration Council Investor Forum - March 2014.
RESOURCES AND RESERVES JANUARY Investor Presentation | April 2013 | 2 A.1RESOURCE ESTIMATES Resources are inclusive of reserves. All resources and.
Important Information NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, DIRECTLY OR INDIRECTLY, IN WHOLE OR IN PART, INTO OR WITHIN THE UNITED STATES OR TO.
Investor Presentation | April 2013 | 1 BATHURST RESOURCES ASX SPOTLIGHT CONFERENCE May 2014.
KALGOORLIE CCI 24 OCTOBER 2013 John Baines TORO ENERGY LIMITED “What’s Down the Track?”
The Importance of Feasibility Studies for Project Financing FINEX 2012.
TSX-V: OCO Frankfurt: OR6
Apollo Minerals Limited Iron ore and base metals in Australia and Africa Apollo Minerals (ASX: AON) is a minerals exploration company focused on identification,
Commodity Hedging Overview May 10, 2012 The following information is current as of May 10, Memorial Production Partners LP (MEMP) intends to provide.
Grattan Institute / MEI Energy Futures Event Dr Fiona Wild Vice President, Environment and Climate Change 5 March 2015 Newman, Iron Ore.
Heritage Gold NZ Limited Presentation AGM 23 September 2010 …..unlocking value.
Investor Presentation. 2 Cautionary Statement This presentation contains “forward-looking information” which may include, but is not limited to, statements.
1 Presented By: Neil McMillan President & CEO Q1 Financials May 14, 2012.
A Joint Venture The right people The right projects.
NIUMINCO GROUP LIMITED. Important Information This presentation is not a prospectus nor an offer of securities for subscription or sale in any jurisdiction.
Ramping-up to Full Capacity Investor Presentation February 2009.
BROKER PRESENTATION December Disclaimer & Confidentiality Notice  The information contained in this Presentation or subsequently provided to the.
Little Bow ASP Project Update September, 2013.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
April, Investor presentation.
Natural Resource Partners L.P. 17 th Annual Wachovia Equity Conference Nantucket June 26, 2007.
Economic & Market Recap May Equity and Fixed Income Markets.
March Slide 1 Opportunities Exist The Region Is Vast, Under Explored And Undeveloped –Remote –Historical Lack Of Funds For Exploration Exploration.
Wachovia Capital Markets Seventh Annual Pipeline and MLP Conference New York, NY December 9, 2008.
11 ASX: RXL Successful Base Metals Exploration Diggers & Dealers Presentation 5 August 2015.
2009 Coal Seam Gas Safety Forum Paul Zealand, Executive General Manager Upstream Oil & Gas Friday 14 August 2009.
Presentation Disclaimer Forward Looking Statements  This presentation may contain certain forward looking statements and projections regarding:  estimated,
FOURTH QUARTER AND YEAR END 2012 RESULTS. The following is a Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995: This press.
Max Maczurad September 2011 Level 3 Hyatt Centre 123 Adelaide Terrace East Perth WA 6004 Tel: WINGELLINA NICKEL AND COBALT.
Dundas Magnetite Project Jan 2011 Presented: Paul Poli, Executive Chairman Author: Dave Fielding.
Fourth Quarter / Full Year Earnings 2008 Kimberly Ross Chief Financial Officer March 2, 2009.
JUMBUCK May 2016 GOLD PROJECT Gawler Craton - South Australia.
1 The Power of Dividend Growth DISCLOSURE This information has been provided by RBC Global Asset Management Inc. (RBC GAM) and is for informational.
NT LITHIUM ASX code: CXO PROJECTS. | LITHIUM potential | July 2016 | Core Exploration Ltd 2 DISCLAIMER.
Construction underway with strong local support at the Salamanca mine in Western Spain April 2017.
Developing a Canadian Gold Deposit
ASX Spotlight Investor Conference 30 May 2017 in Singapore
An overview of the CRIRSCO International Reporting Template
Corporations: Additional Topics and IFRS
Investor Presentation
Kuannersuit (Kvanefjeld) Project
Asteroid Mining 27 October 2017.
AGM Presentation November 2018
……. Date. Disclaimer… Randgold reports its mineral resources and mineral reserves in accordance with the JORC 2012 code. As such numbers.
Jervois Mining and M2 Cobalt Corp to Merge January 2019
PicIORUL ZIMBRULUI & MAGURA NEGRA
Manaila Polymetallic Mine
Presentation transcript:

1 CHARLEY CREEK ALLUVIAL REE PROJECT TMS2013 Scoping Study Presentation Developing one of the world’s largest, lowest capital cost, rare earths projects

TMS2013 Presentation, Scoping Study April This presentation should not be considered as investment advice. Any party to whom this information is made available must make their own investment decisions. Any forward-looking statements included in this document involve subjective judgment, and are subject to uncertainties, risks and contingencies, which may be beyond the control or knowledge of Crossland. Future events may vary materially from the forward-looking statements and the assumptions on which the forward-looking statements are based. Attendees at this presentation are cautioned not to place undue reliance on such forward-looking statements. Crossland makes no representation or warranty as to the accuracy, reliability or completeness of information in this document and does not take responsibility for updating any information or correcting any error or omission which may become apparent after this document has been issued. JORC StatementThe information in this presentation that relates to Exploration Targets, Exploration Results, or Mineral Resources is based on information compiled by Geoffrey S Eupene FAusIMM CP, a Competent Person who is a Fellow of the Australasian Institute of Mining and Metallurgy. He is a director of the Company and a full time employee of Eupene Exploration Enterprises Pty Ltd, which is engaged by the Company. He has sufficient experience which is relevant to the styles of mineralisation and types of deposits under consideration, and to the activity which is being undertaken to qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (the JORC Code). Geoffrey S Eupene has consented to the inclusion in the report of the matters based on his information in the form and context in which it appears. ASX Listing Rules Statement re Production Targets. This presentation is based upon a production target and forecast financial information derived therefrom that was initially reported in CUX ASX Release of 15 th April 2013: “Charley Creek Rare Earth Project Scoping Study Results”. The assumptions underpinning the production targets therein continue to apply and have not materially changed. Some of the production target is based upon an exploration target. The potential quantity and grade of a exploration target is conceptual in nature, there has been insufficient exploration to determine a mineral resource and there is no certainty that further exploration work will result in the determination of mineral resources or that the production target itself will be realised.

3 TMS2013 Presentation, Scoping Study 2013 “Mine Building Bastards” “Tattoo Removal”?? Technical Risk Financial Risk REO’s are the best solution Security of Supply Resource >?>?>?>Finished Product Mineralogy is Key Who has separation technology? Capex “We don’t know what we don’t know” Risk CREO>HREO>TREO Investor Strike Challenging Scalable

4  Joint Venture between Crossland Uranium and Pancontinental Uranium  Alluvial REE Project situated in NT, Australia  High proportion of Heavy and Critical Rare Earths  Scoping study has confirmed project development potential  Low Capex - Lower risk  Drilling has tested 1% of exploration potential  Favourable regulatory regime TMS2013 Presentation, Scoping Study 2013

5 Charley Creek Joint Venture

6 Investor Presentation, Scoping Study 2013

7  Charley Creek alluvial plains with a rough outline of the area of interest  The REE minerals are separate mineral grains monazite & xenotime from surface.  Alluvium is readily mined and upgraded using conventional mineral sands technology  Average thickness of resource is 15m, commencing from surface (no overburden) and up to 80m thick in places  Vast alluvial flats are cheap & easy to rehabilitate Investor Presentation, Scoping Study 2013

8 Decades of REO production RESOURCEMass (Mt) Weighted Average TREO (ppm) Contained TREO (t) Contained Xenotime (t) Contained Monazite (t) Contained Zircon (t) Cattle Creek Indicated Resource ,90017,60097,200124,650 Western Dam Indicated Resource ,1509,67563,70070,930 TOTAL INDICATED RESOURCES ,05027,275160,900195,580 Cattle Creek Inferred Resource ,75026,450141,075183,750 Western Dam Inferred Resource ,3504,24026,16036,230 TOTAL INFERRED RESOURCE ,10030,690167,235219,980 Investor Presentation, Scoping Study 2013 * The resource estimate is not independent and therefore is non-compliant with NI and we caution that it should not be relied upon.”

9 Investor Presentation, Scoping Study 2013

10 Experienced Independent Advisor Team Investor Presentation, Scoping Study 2013  Physical separation processes experts  Specialized in testwork and flowsheet design for mineral sands project  Resource development consultants  Expertise in scoping and feasibility studies through to basic and detailed design, construction and commissioning  GHD is one of the world’s leading engineering, architecture and environmental consulting companies  6500 people across five continents

11 PROJECT FINANCIALS Net Present Value (NPV 10 )A$302M Internal Rate of Return39.4% CAPITAL EXPENDITURE Total Capex (including contingency)A$156M Payback period2.5 years REVENUE Annual revenue (75% off-take terms)A$154M pa “Basket Price” of REO productUS$57.38/kg OPERATING EXPENDITURE Total operating costs (including G & A’s)A$85.4M pa Operating unit cash cost$7.12/t ROM Investor Presentation, Scoping Study 2013

12 MINING Annual ROM Throughput 12M tpa Strip Ratio0.01 Mining Costs$2.64/t ROM CONCENTRATOR Concentrate annual production (40% REO)10kt/yr Wet & Dry plant opex$1.81/t ROM REO REFINERY REO Production (as mixed carbonate)3,645t/yr Opex (including delivery FOB Darwin)$6.54/kg REO Overall metallurgical recovery60.8% INFRASTRUCTURE Power (BOO Arrangement)12MW/hr Water4.3GL/yr Sulphuric Acid (Imported)10kt/yr Investor Presentation, Scoping Study 2013

13 Investor Presentation, Scoping Study 2013  Capex mln or US$43/kg REO pa  Lowest capital cost in sector  Includes all infrastructure CUX

14 Investor Presentation, Scoping Study 2013  Charley Creek is a high tonnage ‘mineral sands’ style operation.  Total cash costs including overheads is $7.12/t ROM or $23.45/kg REO production.  Several areas to reduce costs have been identified: High grade starter pit areas to be drilled in next phase Location of REO Refinery – potential saving of $2.00/kg REO in reagents transport Number of process improvements identified to increase overall metallurgical recovery

15 Investor Presentation, Scoping Study 2013  Current China FOB (March 2013) spot price has been assumed for Scoping Study  Charley Creek basket price is US$57.38/kg REO.  TREO composition contains 18% HREEs.  US Department of Energy has assessed Nd, Eu, Tb, Dy & Y to be in critical shortage.  These five elements are commonly referred to as Critical Rare Earth Elements (CREE).  Charley Creek contains 30% CREEs by weight and they represent approximately 80% of basket price. Source: Metal Pages, CUX

16 Investor Presentation, Scoping Study 2013  Highly unique deposit having a broad spectrum of heavy and critical rare earths  Charley Creek has one of the highest HREE &CREE distributions  Not dependent on LREE metal prices CUX Source: TMR, Metal Pages

17 Investor Presentation, Scoping Study 2013 Corporate  Initiate discussions with off takers and strategics’  Secure funding for DFS Technical  Drill high grade zones  Continue optimisation test work  Tailings disposal & management  EIS Baseline survey  Value engineering to reduce capital and operating costs

18 Investor Presentation, Scoping Study 2013 Project Highlights Resource size >230k t of contained TREO (still open) Mineralogy Preferred monazite and xenotime HREE & CREE Composition 18% HREE and 30% CREE by weight 80% of $57/kg basket price is CREE Low capital cost $156 M to produce 3,600tpa high purity REO Carbonate Low cost mining and processing Proven low risk heavy mineral sand process technology Scalable Base case on 50% of current resource Location Northern Territory, Australia Infrastructure Road, Rail, Power and People Regulatory regime 60 history of mining radioactive materials Early start-up Pilot plant 2013/14 and full scale production 2016

19 Investor Presentation, Scoping Study 2013 CUX DIRECTORS NamePosition Bob RichardsonExecutive Chairman Geoff EupeneExecutive Director Peter WalkerNon-Executive Director Malcolm SmarttFinance Director PUC DIRECTORS NamePosition Don WhalenChairman Rick MarkPresident & CEO Dave MosherDirector Mark McMurdieDirector David PetroffDirector CORPORATE SUMMARY ASX code:CUX Shares on issue:~167 million Options on issue:~42 million Total Shares (fully diluted):~209 million Market Capitalization$6.5 million CORPORATE SUMMARY TSXV code:PUC Shares on issue:~82.5 million Options on issue:~4.0 million Total Shares (fully diluted):~95.9 million Market Capitalization~$5.0 million