Presentation to GDPCR Cost Workshop Alex Wiseman Regulation Director 19 th April 2007.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Regulation of network services Recent experience in the Australian National Electricity Market FSR Executive Seminar - 11 June Florence David Swift Executive.
TNSP Outputs for Use in Economic Benchmarking AER Economic Benchmarking Workshop #2 14 March 2013 Denis Lawrence and John Kain.
GDPCR Costs Workshop WWU’s View on Operating Costs Bob Westlake 19 th April 2007.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
Shaping the Future of Water Services
PROJECT FINANCE INITIATIVE and PUBLIC PRIVATE PARTNERSHIPS Simon Par Keeling, Société Générale Paris.
Secure your future today Save early and prepare for the retirement lifestyle you want.
Industrials Sector Jason Kraynak and Wade Guzdanski.
Cost Management. learning objectives cost/volume/profit (CVP) relationships and break-even analysis break-even chart – low fixed costs, high variable.
The Australian Energy Regulator SA Electricity distribution determination 2015–2020 Consumer/stakeholder forum 3 September 2014.
1 | Energy Efficiency and Renewable Energyeere.energy.gov Kathleen Hogan Deputy Assistant Secretary for EE Office of Energy Efficiency and Renewable Energy.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
An Overview of Our Regulatory Proposal
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Gas Distribution Price Control Review Ofgem Costs Workshop 19 April 2007.
The Australian Energy Regulator Expenditure Forecast Assessment Guideline Category analysis Connections and Customer Driven Works.
Confidential The Budget Presentation to the JCC By Eddie Teare MHK, Treasury Minister 18 February 2015.
Australian Water Summit Sydney March 2006 Is privatisation of water infrastructure and services the answer? Phillip Mills Director of Water Services, Water.
Can Ireland Secure its Competitive Edge? Don Thornhill, Chair National Competitiveness Council ISME Conference 19 th - October 2007.
Wilderness Rim Association Water Rate and Reserve Study Board Meeting April 23, 2014 Presented By: Chris Gonzalez, Project Manager.
Think Efficiency: The Next Phase (2010/11) Programme Summary for Budget Scrutiny 3 rd March 2010.
An Introduction to Public Private Partnerships: Why Government needs to work with the private sector Vilnius 22 nd November 2006 Stephen Harris - Head,
Investment in Gas Infrastructure A regulator´s view Nina GRALL Seminar on Gas Industry Restructuring in SEE 4/5th October 2005, Belgrade.
1 The role of Government in fostering competitiveness and growth Ken Warwick Deputy Chief Economic Adviser UK Department of Trade and Industry.
IMO BUSINESS PLAN Financial Overview September 30, 2003 Regulatory Affairs Standing Committee.
1 Water Services Training Group 19 th Annual Conference Optimising Services Delivery in the Water Industry Radisson Blu Hotel, Sligo, 3 rd. September 2015.
The Australian Energy Regulator Public Forum NSW electricity distribution & transmission revenue proposals July 2014.
National Grid Gas Cost Forecasts to 2013 GDPCR Industry Cost Workshop 19 April 2007.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Tackling the public sector savings challenge Simon Wilson The Crown Commercial Service Conference on University Purchasing (COUP) September 10 th, 2015.
Technical Advisory Group Tuesday 6 October 2009 Tony Pearson Network Planning Manager.
Date Create your footer by changing copy in the Header and Footer section1 Network Rail’s Strategic Agenda Calvin Lloyd.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
The Australian Energy Regulator Expenditure Forecast Assessment Guideline Category analysis Connections and Customer Driven Works.
Unavoidable Impacts of Streetworks Legislation Jon Butterworth MBE Director, National Operations.
Total xoserve income £(a)m (ASA services – includes element for transporter funded changet) Transporter funded change budget built into service charge.
1 Belarus CEM Discussions Energy Sector Stable sector structure and governance over the past decade together with recent macro economic performance of.
A Framework for Organizing Current and Future Electric Utility Regulatory and Business Models Andrew Satchwell and Peter Cappers Lawrence Berkeley National.
Customer Charge On behalf of all DNs 25 October 2010.
NHS Education & Training Operating Model from April 2013 Liberating the NHS: Developing the Healthcare Workforce From Design to Delivery.
An Overview of the Smart Metering Programme in GB.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
S. GRENARD/ D. MELOVIC/ G. STRBAC UK Alpha 5 – Block 2.1 Barcelona May Effect of losses on design and regulation of distribution networks.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
SGN’s July 09 Mod 186 Report DCMF Meeting – July 27 th 2009.
1 ACCC Workshop on the DRP Incentive Mechanisms and Benchmarking.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Economic Benchmarking vs Financial Incentives – an alternative to incentivising performance in the gas industry? Ashley Muldrew, Gas Speak 2015.
Senior Management Team Away Day Session 1: HMS Business Update Presentation by Paul Worthington Managing Director Friday 19th and Saturday 20th October.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Top-down models of operating and capital expenditure.
Minor projects proposed approach.  Purpose of the session is to provide an overview of the proposed process for the review of Transpower’s minor projects.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Presentation at REEEP Regulatory Forum, 28 September 2004
Proposed capital expenditure Categories
Health Education England
Transmission Workstream 4th July 2007
Cired Alpha Session 6 Special Report Question 3
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
2005 MTBPS 25 October 2005 Introduction Macroeconomic overview
The Role of Private Sector in Capital Budgeting
Presentation transcript:

Presentation to GDPCR Cost Workshop Alex Wiseman Regulation Director 19 th April 2007

Agenda Introduction to NGN Environment for the 5 Year Reset Opex Forecasts Comparative Efficiency Summary

Introduction to NGN

Innovative Business Model NGN has implemented a unique business model based on the principles of Strategic Asset Management, under which the roles of asset ownership/asset management and asset services are unbundled NGN remains accountable for all asset management including licence and safety case obligations Competitive procurement process used to select service provider. United Utilities selected on basis of market experience and success in similar utility contracts UUOL is a special purpose vehicle working exclusively for NGN. Neither CKI nor NGN has any interests in UUOL or its parent On 1 June 2005, NGN entered into an Asset Services Agreement (ASA) with UUOL to contract out the provision of a wide range of services including Operation and maintenance of the DN Delivery of Capex and Repex programmes

NGN Business vision To be benchmarked by Ofgem and HSE in the top two comparable utilities in: Customer service Efficiency Health and Safety NGN supports the benchmark approach

Business environment for 5 Year Reset

Legislative changes – such as waste, environment (including landfill tax), pensions, noise at work regulations and working at height regulations Regulatory Changes – notably offtake and interruption reforms - although decision now made, still uncertainty on incentive mechanism and precise implementation mechanism Real increases in EPC costs – EPC rates forecast to increase by RPI+4% pa driven by predicted shortages of engineers and manpower as a result of large UK infrastructure programmes Real increases in salary costs – Direct labour costs forecast to increase at RPI +2% pa. Shortages of experienced gas personnel due to an aging workforce resulting in investment in apprentice schemes. Also increase in staff levels and training (eg. 2 years training for network control and 3 years for safety) Business Environment – leading to cost pressures

Real increases in Material costs – General increase in material costs of RPI+2% pa from rising commodity prices in particular oil and oil based goods Real increase in Energy Costs – Energy costs doubled during 2005/06. Forward curves continue to show significant volatility in market prices Security - An increasing focus on security of assets due to potential terrorist threats on gas networks Service improvements – Improvements that NGN is planning to make in its quality of service and safety to achieve the frontier. Cost Pressures

Changing Nature of RPI Annual price changes in the goods and service sectors, 1993 to 2005 Supermarkets and suppliers of goods produced overseas are seeing inflation below RPI Service sector firms employing a UK based workforce are seeing inflation above RPI

Opex Forecasts

NGN Performance in Current Review Period Despite upward cost pressures NGN has delivered significant efficiencies in the current review period

Source Data: 2004/5 Ofgem Second Consultation Document 2005/6 & 2006/7 Ofgem Third Consultation Document NGN Performance in Current Review Period NGN NGN has reduced costs since sale There is reduced scope for future efficiency savings

Contractor costs increase by RPI + 2% against a forecast of RPI + 4% Direct Labour costs increase by RPI + 2% Material Costs increase by RPI + 2% All xoserve costs treated as opex in BPQ consistent with current treatment Shrinkage gas costs based on forward prices in September 06, modest demand increases and a reduction in the shrinkage factor in line with leakage reduction Pension costs based on latest actuarial valuation Major Forecast Assumptions - Opex

98.5% of controlled escapes will be attended within 2 hours on a 24/7 basis across the entire NGN area External escapes anticipated to reduce by 2% year on year throughout the period but partly offset by increase in internal escapes Continuation of TMS and UMS metering contracts which act as “fill in” work for emergency workforce (This is now looking very doubtful) NGN exits SOMSA NSA in 2009 Major Forecast Assumptions - Opex

Since Purchase £1.9m spent on rationalisation and reducing workforce Business model has substantially reduced central overheads Initiatives on decommissioning expensive vehicles, procurement, recycling Partnership approach to contractors Planned Initiatives New IR framework Changing working practices Vehicle efficiency initiatives Improved back office processes Efficiency Initiatives

Opex Forecast Despite significant upward pressure on input costs NGN is forecasting to deliver efficiencies to hold costs stable in real terms over the plan period.

Capex Forecast

Major Forecast Assumptions - Capex Contractor, direct labour and material cost increases as per opex Investment based on existing legislation, policy and procedures NTS storage available to NGN at zero cost throughout plan period Network storage deficit position throughout plan period Capacity designed to meet 1:20 demand criteria in line with 2006 LTDS Existing numbers of network sensitive loads (ie no programme to actively reinforce the network to remove such loads) Connections and diversion workload consistent with historic levels – no significant changes to connections market PAS 55 principles applied

Capex Forecast Two major LTS projects required in 2011/12 and 2012/13 IT investment required in early years to replace GTMS and to refresh IS systems

Repex Forecast

Major Forecast Assumptions - Repex Labour, material and contractor cost increases in line with opex Iron mains replacement workload based on existing agreement with HSE – 528km per annum abandoned Selection of pipes for replacement driven by existing HSE risk model Service volumes based on historic patterns TMA costs excluded

Repex - Forecast Major project in 2009 /10 to replace the Catton to Weatherall LTS pipeline due to its deteriorating condition

Comparative Analysis

Results of Ofgem Consultants’ bottom up Analysis PB Power – Direct Opex: NGN at the efficiency frontier for 4 out of 5 cost categories LECG – Support Services Opex: NGN not identified as being at the frontier in Support Services, but NGN ahead of the median Allocation issues between support services and direct costs suggests that the benchmarking may not be consistent eg SGN most efficient for support service and least efficient for direct costs Hence top down benchmarking may be appropriate PB Power report on Capex and Repex: NGN at the efficiency frontier for total net repex Capex projects less suitable to comparative analysis but proposed reduction in forecasts lower than for other IDNs

EE Relative efficiency Models should pass ‘real world’ test. For example, not clear that % non- domestic customers is a direct cost driver and it is ‘explained’ by customer numbers and volume Objectively, main cost driver is network length (eg driving repairs and maintenance, emergency costs) Substantive correlation between network length, customer numbers and volume Different networks will favour different drivers but given small number of data points, a composite variable seems appropriate One solution would be network length, customer numbers and volume in ratio 50:25:25 in line with DNO review

Summary

NGN has a clear focus on efficiency and continuous improvement led by its corporate vision and implemented via its business model. Resulted in ongoing improvements in efficiency since purchase in June 2005 in an environment of increasing cost pressures. NGN business plan continuing to contain costs despite exposure to significant above inflation increases NGN incurred the lowest capital expenditure overspend in period and is the only GDN to forecast 2006/7 costs below 2004/5 costs. This achievement reflected in Ofgem Consultants’ analysis that places NGN at or close to the efficiency frontier. Top down benchmarking using a composite variable the most appropriate approach to set regulatory allowances to maintain the strength of incentives for efficiency and hence lead to customer benefits.