1 / 13 05/2002 Electrical/Component Testing. 2 / 13 V + – H Menus (wiggle test) Connector check Harness (visual) Harness check (supplies and ground) Component.

Slides:



Advertisements
Similar presentations
Sensor Scientific, inc.. Sensor Scientific, Inc. Temperature Sensing Solutions Sensor Scientific, inc.
Advertisements

Club Car IQ Technical Information
Motorcycle product sheets
Detaching the Loader from the Tractor 1). Place Bucket Leading edge on the ground and position point ‘A’ 20cm to 30cm from the ground. 2). Lower and adjust.
Enhanced Easy-Stop TM Trailer ABS Sales. Enhanced Easy-Stop Trailer ABS System configurations to meet any air-braked trailer application 2S / 1M, 2S /
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
Building a Pressure/Temperature Weather Station (Sensor Pack) AEM 1905, Fall 2008.
Motorcycle antitheft systems Spyball 6500 platform Benefits 6500 Description: compact motorcycle antitheft alarm and engine immobiliser. Arming/disarming.
PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board1 D. Kampf KAYSER-THREDE.
Molly, Gwyn, Sam, and Eric.  Do we need mounting holes for the main PCB? How many?  What are our options for heat sinking converters? Should we use.
Lesson 4: Breathing Monitors. Breathing Monitors In the past 3 classes, we’ve learned – How to write to a digital pin – How to read the value of a digital.
60 Hz Variations in Pins Plugged probe into temperature controller output pins: pins 1, 2, 3, 4 all show 1V p-p variations Plugged probe into pins at other.
Reservoir LVAD PVS / Booster Physiological Simulator Valve Automated Resistance Valve Three Loops Blood Extraction Standard Pressure Sensor Temperature.
© 2012 Rinnai America Corporation Rinnai Circ-Logic (RCL)
PCB Layout Design. PCB Layout Special Layout Considerations 4 in.
Electrical Electricity Fuses Relays Solenoids Electrical Testing
P-REV Initial PCB Michael Connaboy Stephen Schiffli Ram Hudiara Win Than Aung.
Interface Connections
Golf Course Irrigation
GNMSGNMS Jason Rice Eric Ellett Larry Price Daniel Grum.
Questions about the PBL 1.What questions should we ask? 2.What are focus characteristics? 3.How would you try to answer these questions in observations?
Multiplexer Troubleshooting February Instrument recognition problems Air/water pressure related problems Compatibility problems Dripping instruments.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco PublicNew CCNA Jianxin Tang IT 1 V4.0 Ch3. Computer Assembly—Step by Step.
Start Dreamweaver program From file menu click new Blank page appears.
1 Exercise 7 The Power Supply. 2 The Power Supply.
Work Breakdown Schedule. Components Research and find all components  Pressure Sensor  Micro controller  LED Display  Operational Amplifier Order.
1. Gear housing 2. Engine dataplate 3. Air intake 4. Fuel pump 5. Fuel filter 6. Starter 7. Lube oil pan 8. Lube oil drain 9. Crankshaft timing pin port.
OUT OF GAME TESTING INFORMATION WHATS NEEDED INSTRUCTIONS EXAMPLES 750/850 THERMAL TICKET PRINTERS.
Group Five MSP430 Project Katy Charlton Jeremy McNutt Ben Ealey Aaron Vallance April 14, 2007.
K. I. S. S. e t i t e m u p p d l e e n t Start with a visual Inspection of the system or systems effected.
CS130 Visual Basic Project 4 Lecture Fall New topics in project 4 Database, file (table), records, fields. Application that contains menus, submenus,
Pressure drops over cooling pipes Richard French, Richard Bates, Alex Bitadze.
System Level Block Diagram P16318 Lianna Dicke. P16318: Gaseous Mass Flow Rate Controller Level 1 Functional Block Diagram 1.0 System Processing 2.0 Mechanical.
Team 8 Recon Robot Abhinav Valluru Vinit Bhamburdekar Arjun Bajaj Aabhas Sharma.
Report on dummy detector Equipped with Heater & sensors NA62 GigaTracker Working Group Meeting May 24 th 2011.
How to make a Line Follow program Using EV3 software and an NXT light sensor.
After Sales Service Training Series TM O5/ Click on an icon to go to the subject BrakesHydraulics PTO Rear Axle Engine Introduction Transmission.
ECE445: Senior Design Spring 2015 Team 17: Weather Jukebox Sang Yun Bang, Thomas Fedrigon, Shanda Lu.
What is the difference between Annual and Five- year sprinkler test.
How to Planning a Trip Via Road from Brisbane to Cairns
XBIS 219 Week 4 Checkpoint Picture The Supply Chain Choose one of these components and make a recommendation for an improvement to that area of the supply.
BIS 219 Week 3 DQ 1 Identify the components of a supply chain. What is the function of supply chain management (SCM)? When problems arise along the supply.
Piero Belforte, HDT 1998: Advanced Simulation and Modeling for Electronic System Hardware Design Part3
Growing Visual Quadratic Patterns
음향 시스템 사양서 POWER SUPLY WITH 3.5 PHOENIX CONNECTOR AMX: PSN6.5
Wiring For MAF Conversion on Mitsubishi 3000 GT ‘91-’93 Non OBDII
Calibration of ML Oxipres
The Relay based Multiplexer
Visual Instructions.
स्वयचलित आकाशकदिल बनवणे
הוראת מיומנויות של עבודה בקבוצה מחקר פעולה
Failure types, Codes, Clearing codes
Autonomous Rescue Vehicle (Team 10)
Design Considerations
Module 1 – Power Supply AMC APS-PBC-60
FEE Electronics progress
Group 10 – Extensible Digital Logic Educational Tool
Figure 12.2 The signal voltage from a throttle position increases as the throttle is opened because the wiper arm is closer to the 5-volt reference.
What are Computers? E Use this tutorial alongside the numbers coded in your workbook and answer the related questions in each section.
Sensors and actuators Sensors Resistive sensors
How To Can You Get Unemployed Loans With Bad Credit Score? You can get unemployed loan without any credit check. You just click on to
CLICK TO START.
CLICK TO START.
After service guide for changing PCB
Event, March 19-24th 2013 Pressure.
Group 9 Andrew White Ryan Hamdorff Jimmy Psihogios
How To Choose The Right Custom Connectors
Call Now : Click : -
Call Now : Click : -
Call Now : Click : -
Presentation transcript:

1 / 13 05/2002 Electrical/Component Testing

2 / 13 V + – H Menus (wiggle test) Connector check Harness (visual) Harness check (supplies and ground) Component test

3 / Harness Component

4 / Ω + – Ω + – H9 Ω 10% 90%70%75% 14% 1K 4K2.6K2.9K 50K

5 / 13 Ω Temperature Ω Pressure

6 / a Ω + – Ω + – Audible Click

7 / Ω + –

8 / 13

9 / 13 Ω + – pin sensor Ω + – pin sensor 1 2 Hz + –

10 / 13 V + –

11 / 13 M + – Ω + – M + – Ω + – M + – Ω + –

12 / 13

13 / 13 Workbook Testing