1 NASA CUSTOMER NUMBER: 104-07-01-2 PROJECT TASK: 1021972.24.4 QUARTERLY TECHNICAL PROGRESS REVIEW TASK TITLE:Embedded Passives Characterization QUARTER:2.

Slides:



Advertisements
Similar presentations
Study Committee Representatives Annual Report December, 2012
Advertisements

Lab 09: Performance Test 1 Advanced Energy Vehicle.
Chase Banna Nathan Corwin Robert Scanlon. Problem  Learning to play the guitar can be a very time consuming and frustrating experience.  Without hands-on.
NAVAL REACTORS PROGRAM TMDE Status
ECE 2799 Term D2014 Electrical and Computer Engineering Design Prof. Michalson Prof. Bitar.
PC Board Manufacturing Kate McDonnell & Cherelle Bishop CSU GK-12 Summer Planning 2011.
Molly, Gwyn, Sam, and Eric.  Fixed temperature sensor circuit- it works!  Successfully soldered a surface mount current sensor and tested it on a breadboard.
Printed Circuit Board Design
P08009 Audible Memo Board Phase II Monday, October 22, 2007 P08009: Audible Memo Board Phase II Sponsor: Tala Hopkins Jon GosligaAudio Output Lead Loic.
P14311: PCB Isolation Routing System Problem Definition Review.
CUBESAT SPACECRAFT ELECTRICAL POWER SYSTEM. Team Members Project Members Aleck Wright – Input Power Regulation Matt Churchman – Output Power Regulation.
PRACTICAL ELECTRONICS MASTERCLASS (Mr Bell) (COMPUTERS REQUIRED FOR 1 ST PERIOD) 1.
Chapter 17 Acquiring and Implementing Accounting Information Systems
Electrical Engineering Capstone Courses EE-4BI6 Electrical and Biomedical Engineering  Dr. Hubert deBruin EE-4OI6 Electrical and Computer Engineering.
Project Lifecycle Section 6 - Closeout. Project Manager’s Role During Project Close-Out  Ensure that all project deliverables have been completed and.
PIC Evaluation/ Development Board Dec02-12 December 10, 2002 Client: ECpE Department Faculty Advisors: Dr. Rover, Dr. Weber Chad Berg, Luke Bishop, Tyson.
Applied Technology High School ATE 1012 Grade 10 Eng. Rose Hasan.
1 QUARTERLY TECHNICAL PROGRESS REVIEW TASK TITLE:Reliability of Pb-free solder alloy study SUBTITLE:Hand soldering process of Sn/Ag alloy QUARTER:4 FY02.
Continuing Embry- Riddle’s CubeSat Satellite Development Program Presented by Clayton G. Jacobs Embry-Riddle Aeronautical University, Prescott EagleSat.
From Research Prototype to Production
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
1/17 PASSIVE ELECTRONIC COMPONENTS AND CIRCUITS Lecture 1 Introduction.
Water Supply Planning Initiative State Water Commission November 22, 2004.
ASPERA-3 July 31, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_31/ Page 1 Monthly Status Report Report due 7/25/01 Schedule statused.
NASA UPN JPL Project #: NEPP QUARTERLY PROGRESS REVIEW TASK TITLE: Tantalum Polymer Capacitors YEAR: 2 nd Qtr FY05 COORDINATING.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
Printed Circuit Board (PCB) manufacture Learning outcomes: To work effectively, independently and in small groups. To understand the importance of personal.
ASCEND as a step towards a CubeSat. ASCEND program previously Oversized for their task No well defined goal Primitive electronics.
Making a PCB Report and ppt – presentation 1.)Structure 1.1)Making the PCB 1.2)Assembling a circuit )The components I choose )They functions.
Operational Research (O.R.) case studies. What’s the problem?
WP1Transnational project and financial management Establishment-Operation of the Project Management and Implementation Instruments Region of Peloponnese.
1 Engineering Design - A general approach. 2 Outline Form a group Proposal (Presentation and 1 st Mandatory Meeting) Milestone A (Demo A and 2 nd Mandatory.
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
ASPERA-3 May 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 5_25/ Page 1 Monthly Status Report Report due 5/25/01 Schedule statused as.
06-032b Optoelectronics for Space Environments Cost There are no procurements to impact Schedule There are no major schedule dependencies Technical Only.
Sacramento Area Council of Governments ITS Partnership Meeting February 2, 2005.
1 NASA WBS TASK #: QUARTERLY TECHNICAL PROGRESS REVIEW TASK # & TITLE:06-0xxxx Assessment of Electronic Widgets - Radiation QUARTER:XQ FY06.
NASA TECHNICAL STANDARDS 8/01: Partial initial drafts on Wind and Lightning received. 10/01: Initial draft on Radiation received. 5/01: Three HB sections.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Plasma Sense Amplifier
How to make a PCB.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Sponsored By: Freescale Sponsor: Kevin Kemp Faculty Advisor: William Stapleton Project # 1.3.
GEOSS Common Infrastructure Initial Operating Capability Directions and Discussion Presented to GEO ADC Geneva May
Introduction to Codes, Standards, and Regulations Chattanooga State CC.
Improved Surge Step Stress Testing of Tantalum Capacitors 1. For Ta capacitor manufacturer: Selection of tantalum capacitors with different types and constructions.
#WEEK 3: RELIABILITY-TEST DOCUMENTATION AND OTHER ITEMS NEEDED FOR RELIABILITY TESTING 2 August 2006.
Overview of the Final Report and Findings from the Review of Sampling Methods in Extrapolated New Base-Year Generation Studies May 11-12, 2004.
John Deere Team Weekly Status Report Week 3 Josh Ebeling Jamari Haynes James June Mike Reno Ben Spivey Gary Twedt.
NASA UPN: JPL Project: JPL Task # QUARTERLY TECHNICAL PROGRESS REVIEW TASK TITLE:Sensor Technology QUARTER:2 FY05 COORDINATING.
SPP FIELDS DFB Quarterly November 21, 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board (DFB) 1.
1 Passive Components TWG Report NEMI Meeting March 25 TWG Chairman Needed Joe Dougherty - Penn State, Co-Chair Dennis Fritz - MacDermid, reporting.
Nevada Department of Education Office of Educational Opportunity Nevada Comprehensive Curriculum Audit Tool for Schools NCCAT-S August
ECE 2799 Term D2016 Electrical and Computer Engineering Design Prof. Bitar and Prof. Mazumder.
PCB Assembly. INTRODUCTION  PCB abbreviation is a printed circuit board,also known as a printed wiring board.  For electronics PCB is used to build.
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
Group N3: Digital Control Mary Nsunwara Reshun Gethers Wayne Blake.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 6 Bryan Justice March 10, 2005.
 Conventional Methods  Analytical X-ray (XRD)  Integrated X-ray Testing Systems  2D Micro and Nanofocus X-ray.
 Conventional Methods  Analytical X-ray (XRD)  Integrated X-ray Testing Systems  2D Micro and Nanofocus X-ray.
ECE 2799 Term B2016 Electrical and Computer Engineering Design
Starter Look at the images below. What do you see? Write your answers on your mini white board.
ECE 2799 Term B2017 Electrical and Computer Engineering Design
Electronic Assembly Quality and Standards
Changed wiring of the 555 timer
BIS 320 NERD Perfect Education/ bis320nerd.com.
BRIAN KLATT MISSION ASSURANCE MANAGER
Project Overview.
Periodic Accounting Review Periodic Revenue Reconciliation
Presentation transcript:

1 NASA CUSTOMER NUMBER: PROJECT TASK: QUARTERLY TECHNICAL PROGRESS REVIEW TASK TITLE:Embedded Passives Characterization QUARTER:2 FY05 LEAD CENTER:JPL PROGRAM AREA:Tactical TASK MANAGER:David Gerke CONTRIBUTORS: FY05 FUNDING:$185k CUSTOMER:OSMA (formally Code Q)

2 TASK DESCRIPTION Embedded Passives Characterization  This Task will utilizing “flight-like” boards assembled with PWB embedded passives (i.e. resistors and capacitors) and compared to equivalent PWB circuit boards assembled with discrete passive components. The comparison will include electrical performance and environmental testing representative of typical space conditions.

3 GOALS/OBJECTIVES Embedded Passives Characterization To build/assemble “flight-like” PCBs with embedded passive components and conventional surface mount soldered components. Stress test the PCBs to simulate space usage conditions. Compare electrical performance. Compare reliability.

4 Deliverables Embedded Passives Characterization  Quarterly Review Reports  Summary report containing significance of circuit chosen as well as significant lessons learned regarding the conversion over to embedded passives.  Year end report  Final Report documenting data collected from PWB Test Circuits as well as recommendations for implementation into Flight Projects.

5 SCHEDULE Embedded Passives Characterization

6 BUDGET/WORKFORCE Embedded Passives Characterization To be in system by End of April

7 Accomplishments Q2 Completed FY’04 BOK and submitted to Mike Sampson. –Mike suggested some changes –Changes are being incorporated. Conducted discussions with Compunetics (PCB) manufacturer and materials suppliers. –Test vehicle design is nearly complete.

8 PROBLEMS AND CONCERNS Embedded Passives Characterization Complete BOK and submit to website. Finalize FY’05 TV Place order for TV Receive TV Begin summary report regarding test vehicle. PLANS FOR NEXT QUARTER Embedded Passives Characterization none