C-band Accelerator system for XFEL / SPring-8 C. Kondo, T. Inagaki, T. Shintake for XFEL project in SPring-8 6/Oct/2008 Seminar at SLAC

Slides:



Advertisements
Similar presentations
TS01 Klystron Modulator Minh Nguyen May 20, 2014 Beam Voltage Stability Improvements.
Advertisements

Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
SLAC Klystron Lectures Lecture #12 June 2, 2004 Klystron Power Supplies, Modulators and Testing Saul Gold Stanford Linear Accelerator Center
Progress of the sub-harmonic bunching system (i.e. upgrading progress of BEPCII present bunching system) Pei Shilun for the SHBS team Accelerator center,
KAGEYAMA, T. Open Meeting for Proto-Collaboration March 19, 2008.
9/29/2004EE 42 fall 2004 lecture 131 Lecture #13 Power supplies, dependent sources, summary of ideal components Reading: Malvino chapter 3, Next:
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
RF Synchronisation Issues
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Electronic Circuits POWER SUPPLIES.
POWER SUPPILES LECTURE 20.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Development of Solid State Long Pulse Klystron Modulators
Linac 6575 Modulator PFN Charging Power Supply Upgrade Minh Nguyen December 5, 2012.
CERN 29 Jan 2008 Power Converters for Linac 4 - Carlos A. Martins1 Power Converters for Linac 4 2 Hz) Carlos A. MARTINS Accelerators and Beams (AB)
Digital measurement system for the LHC klystron high voltage modulator D. Valuch, A. Mikkelsen, G. Ravida, O. Brunner.
Power Electronics and Drives (Version ) Dr. Zainal Salam, UTM-JB 1 Chapter 3 DC to DC CONVERTER (CHOPPER) General Buck converter Boost converter.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
An Assessment on Klystron Modulator Topologies for the ESS Project Carlos A. Martins (*), Karin Rathsman(**) (*) – Laval University, Dept. Electrical and.
UNIT-1 Rectifiers & Power Supplies. Rectifier A rectifier is an electrical device that converts alternating current (AC), which periodically reverses.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
Parul Institute of Engineering & Technology Name of Unit : Diode And Its Applications___________ Topic : BRIDGE RECTIFIER_________________________ Name.
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
Christopher Nantista ARD R&D Status Meeting SLAC February 3, …… …… …… … ….
SYSTEMS CORPORATION Pulse Sciences Division FAST MARX-CHARGED ONE-STAGE MPC CONCEPT FOR KrF LASER IFE Doug Weidenheimer Titan Pulse Sciences Division.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Overview of PAL XFEL Project October 22, 2012 EPICS Collaboration Meeting In Soo Ko on behalf of PAL XFEL Team.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
Anders Sunesson RF Group ESS Accelerator Division
Power Supply System for DRFS
Accelerator Laboratory 1 CFS Review of Asian Region (S. Fukuda) June 1/ Hz Operation in DRFS HLRF System KEK S. Fukuda.
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
L-band (1.3 GHz) 5-Cell SW Cavity High Power Test Results Faya Wang, Chris Adolphsen SLAC National Accelerator Laboratory
Proton Driver Main Linac Parameter Optimization G. W. Foster Proton Driver General Meeting Jan 19, 2005.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
KCS and RDR 10 Hz Operation Chris Adolphsen BAW2, SLAC 1/20/2011.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
LCLS Energy Jitter Status in 2012 Franz-Josef Decker 24-Oct-2012 thanks to: J. Turner, R. Akre, J. Craft, A. Krasnykh, M. Nguyen, W. Colocho, … for helping.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
6. Unregulated Power Supply Design
Main Technical Issues of theSuper B Injector Main Technical Issues of the Super B Injector SuperB Meeting, Isola d’Elba, May 31st – June 3rd, 2008 D. Alesini,
Long Pulse Klystron Modulators SML (Stacked Multi-Level) topology
June 16, 2015 CLIC WORKSHOP JANUARY 18 – 22, 2016 OPTIMIZED RF UNIT I 1 January 21, 2016 By: Mikael Lindholm.
New prototype modulator for the European XFEL Project (DESY) Pulse Step Modulator (PSM) Technology for long pulse applications.
R.F.AND HIGH VOLTAGE SYSTEMS FOR IR-FEL (CUTE FEL) IN INDIA Umesh Kale Beam Physics & FEL Lab Raja Ramanna Centre for Advanced Technology, Indore
Heung-Sik Kang Pohang Accelerator Laboratory
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
3 July July July Conventional X-rays Generator Basic components of an X-ray machine:  Electron source.  Vacuum where electrons were.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
Presentation CERN SPAIN | ITALY | FRANCE | GERMANY | MEXICO | USA | BRAZIL | UAE | QATAR | OMAN | SAUDI ARABIA jema.es.
CERN LHC RF Power Systems
Areal RF Station A. Vardanyan
High Efficiency Klystron
KEK Marx-Modulator R&D
MICE RF System Power Supplies, Control and Monitoring Status report
Development of X-band 50MW klystron in BVERI
An X-band system for phase space linearisation on CLARA
Status of the CLIC main beam injectors
AC Inlet & AC Input Filter
PS System for DRFS PS System for Diode-type klystrons
CLIC Klystron based. Updates 2017.
Klystron Power Supplies for ILC
Advanced Research Electron Accelerator Laboratory
Presentation transcript:

C-band Accelerator system for XFEL / SPring-8 C. Kondo, T. Inagaki, T. Shintake for XFEL project in SPring-8 6/Oct/2008 Seminar at SLAC

8 GeV XFEL Machine Layout Injector S-band 4 units C-band (42  off-crest) 12 units C-band (crest) 52 units Undulators 30 MeV 100 A 500 keV 1 A x 1 ns 1.4 GeV 3 kA 8 GeV 3 kA 400 MeV 1 kA Bunch compression Acceleration X-ray Laser min < 0.1 nm E a = 35 MV/m  V/V ~ 0.01% rms  ~ 0.2 deg. rms  V/V ~ 0.01% rms  ~ 0.5 deg. rms

C-band (5712 MHz) RF system HV Charger

Pulse-to-pulse jitter from the klystron voltage HV Charger AC 420 V XFEL requires (rms) - Intensity  0.01% - Phase  0.2 ° Modulator Charging 50 kV Klystron Pulse -350 kV Pulse Comp. RF 50 MW RF 70 MW  2 Accel. Struct.  0.01 % high precision HV charger with <0.01% (100 ppm) stability

Improvement of High Voltage Charger Specification: ・ Switching deviceIGBT ・ Charging voltageMax. 50 kV ・ Charging current ~ 2 A ・ Average output power 36 kW ・ Repetition 60 Hz ・ Voltage stability (jitter) 0.01 %rms Aug. 2006, Nichicon Corp. Used at prototype acc. Feb. 2008, Nichicon Corp. Nov. 2007, Toshiba electro-wave,

Block Diagram of HV Charger Full-wave rectification AC 420 V Full bridge switching Main Sub Resonance High voltage rectification DC 600 V Max. 50 kV We use Main charger and Sub charger. “Main” charges 99.5%, fast but roughly “Sub” charges up to the target voltage, slowly but accurately.

Feedback Control of Charged Voltage HV charger Modulator PFN Capacitors HV probe Japan finechem inc Feedback of the voltage Error amp. Reference voltage Stray capacitance delays the response Main resistor : 1 G  →100 M  ・ Time constant: 1 msec→100  sec ・ Heat loss: Fluorinert, Cooling water.

New HV charger with 10 ppm (rms) stability Prototype model Feb. 2008, Nichicon Corp. This stability satisfies the requirement at XFEL (<100 ppm). Typical HV charging cycle (Tens of waveforms are overlaid)

C-band (5712 MHz) RF system Compact “all-in-one” modulator

“New” modulator One tank including the pulse transformer and modulator Pulse Transformer PFN circuit Capacitor x16 (General Atomics) Thyratron e2v CX-1836 EOL circuit Diode & Resistor Klystron cathode Nihon Koshuha Co. Ltd., Oct./2007 Compact size: 1.7m x 1m x 1.2m, EM noise shielding, etc.

Thyratron and PFN Circuit (Detail) Thyratron e2v, CX-1836 ・ Deuterium filled ・ Impregnated cathode ・ Double gap, twin trigger ・ Cooled by natural oil flow Omit forced oil flow. Pulse Forming Network circuit Z PFN = 4  ・ Capacitor : General Atomics, Max. 50 kV  F ×16 series ・ Coil 0.6  H ×16 series Replace Other circuit EOL, tail clipper, shunt diode, discharging resistor, etc

Pulse Transformer (detail) RISHO Co. (Japan) Turn ratio: 1:16 ( Prim=6 turn 、 Sec=96 turn ) Primary voltage: -22 kV Secondary voltage: -350 KV Epoxy-molded winding ・ High voltage insulation ・ Suppression of wire vibration

Oil cooling system of the modulator Concept Fan-less cooling for viscous insulation oil Low cost, Compact Requirements Heat generation: ~3kW Heater ~1kW ( thyratron cathode, Klystron cathode) Current 45kV,60pps ( EOL, thy. Anode, Core Loss, etc) Oil temperature : < 45 ℃ We measured the practical heat transfer coefficient by model tank. And, we designed the optimum cooling system for the modulator.

View of Cooling system 2 panel type on partition wall Cooling panel 1 pipe type on top board Cooling pipe 2 panel type on side board Cooling panel (side board)

Oil temperature Oil temperature on nominal operation Operation: 45 kV charging 60 pps Cooling water: 26 ℃, 8 L/min Oil temperature: < 43 ℃ Oil Temperature ( ℃ )

C-band (5712 MHz) RF system C-band Klystron

50MW pulse klystron Output power :50 MW Frequency:5712 MHz RF pulse width:2.5  sec Beam Voltage:-350 kV Beam Current:310 A Repetition:60 pps TOSHIBA ELECTRON TUBES & DEVICES CO.LTD. Model No. E37202 In the test accelerator, no trouble for 3,000 hours

C-band (5712 MHz) RF system Pulse compressor C-band accelerator structure

RF pulse compressor Fabricated by Mitsubishi Heavy Industries Ltd. High-Q cavities mode: TE 0,1,15 Q0 : 190,000  : 9.5 Mode converters (Shintake 1996) - Waveguide(TE 10 )  Circular(TE 0,1,x ) - 4 coupling holes  Lower rf field at the coupling hole Input 50 MW 2.5  s 200 MW peak 0.5  s Output Directional coupler

Accelerating structure (Shintake structure) Choke mode cavity (Shintake 1992) - traps the accel. mode (5712 MHz) - eliminate HOM (not 5712 MHz)  multi-bunch operation High acceleration gradient R~ 54 M  /m,  ~ 0.53, L=1.8 m Ea = 35 MV/m with 63 MW x 300 nsec rf power Fabricated by Mitsubishi Heavy Industries Ltd SiC absorber

Mass production of the accelerating Mitsubishi Heavy Industries Ltd. Precise lathe Shipping Dr. Miura (Mitsubishi) Cells

High power rf test bunker (July 2008 ~) Accel. struct.WaveguideRF pulse compressorModulator Klystron In order to check quality of the delivered components, we constructed the test bunker. Now, rf processing is in progress.

Modulator development team 白澤 近藤 櫻井 稲垣 武部 新竹 T. Inagaki C. Kondo T. Shintake S. Indo K. Nakajima T. SakuraiK. Shirasawa

Summary Highly precise charger Parallel charging system New HV probe of fast response-time. Stability of charging voltage ~10 ppm (rms) New “all-in-one” modulator power supply Compact oil-filled power supply. EM noise shielding, fan-less oil-cooling system … No trouble operation for 700 hours Schedule High power rf components were delivered on schedule. Quality will be checked at the rf test bunker. 2009~2010 installation 2011~ Beam commissioning

Thank You!