HIGH RF POWER TESTING FOR THE CLIC PETS - 2010 International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.

Slides:



Advertisements
Similar presentations
IWLC2010Walter Wuensch19 October 2010 Progress on CLIC rf structures.
Advertisements

Breakdown Rate Dependence on Gradient and Pulse Heating in Single Cell Cavities and TD18 Faya Wang, Chris Nantista and Chris Adolphsen May 1, 2010.
PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
Structure testing and RF tests stands Jan Kovermann CERN On behalf of the CLIC structure test team.
High gradient test results from X-BOX1 Ben Woolley XBOX Team CERN, Switzerland February 2014.
Development of an X-band Dielectric PETS C. Jing, Euclid Techlabs / ANL HG Workshop, May
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
1 X-band Single Cell and T18_SLAC_2 Test Results at NLCTA Faya Wang Chris Adolphsen Jul
Working Group 1: Microwave Acceleration Summary 10 July 2009.
Design of Standing-Wave Accelerator Structure
High-gradient Experiments with Narrow Waveguides Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto,
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Different mechanisms and scenarios for the local RF
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
High power RF capabilities From Two 50 MW Klystrons Variable iris Variable Delay line length through variable mode converter Gate Valves Two experimental.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
Accelerating structure test results and what’s next Walter Wuensch CTF3 collaboration meeting
30 GHz waveguide line modification towards 12 GHz.
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
2nd CLIC Advisory Committee (CLIC-ACE), CERN January 2008 Introduction to the CLIC Power Extraction and Transfer Structure (PETS) Design. I. Syratchev.
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
An RF & High-Speed Acquisition Systems for High-Gradient Tests at CLIC Test Facility Raquel Fandos.
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
Recent High-gradient test result at KEK Linear Collider Workshop 2012 Arlington, Texas (WebEx) 25 October, 2012 Toshi Higo and X-band group of KEK.
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Recent high-gradient results, rf testing, places and plans Steffen Döbert, CLIC Workshop, Test facilities High gradient results Future testing.
J.L. Navarro (CERN), for the CLIC/CTF3 collaboration.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
KEK workshopWalter Wuensch18 April 2012 Status and objectives of the CLIC X-band and high- gradient activity.
Jose Alberto Rodriguez.  Describe how we currently characterize structures at CTF3  Describe how we want to improve the characterization  Learn from.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
EnEfficient RF Sources Workshop. June 2014 I. Syratchev X-band high RF power testing activity at CERN I.Syratchev.
PETS TESTING ANALYSIS 4 th X-band Structure Collaboration Meeting 3 rd May 2010 Alessandro Cappelletti for CLIC collaboration.
W. Wuensch CLIC project meeting High-power rf structure testing.
ON/OFF news. Reflected Transmitted Stroke 8.0 mm RF power, dB Piston position (gap width), mm ON OFF Compact design of the high RF power variable (mechanically)
Status of high gradient experiments at Nextef Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Shuji Matsumoto, Shigeki Fukuda Accelerator Laboratory, KEK.
Some Results and Analysis from CTF3 1HG2012-April-18 Some Results and Analysis from CTF3 W. Farabolini - A. Palaia.
Comparison of breakdown behavior between klystron and beam driven structure W. Farabolini With the support of J. Kovermann, B. Woolley, J. Tagg 1HG2013.
CLIC workshop ”Two beam hardware and integration” working group Module layout and main requirement G. Riddone, A. Samoshkin
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
1 Design and objectives of test accelerating structures Riccardo Zennaro.
High gradient test results from X-BOX1 Ben Woolley XBOX Team CERN, Switzerland December 2013.
I. Syratchev, HGW 2012, KEK, Japan The high power demonstration of the PETS ON/OFF operation with beam. I. Syratchev for CLIC team.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Update on PETS experiments (Igor for the CLIC collaboration)
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
High Power Crab Cavity Testing Ben Woolley HG2016 Argonne National Lab. 8 th June 2016.
2010 TESTING PROGRAM AND RESULTS FOR THE CLIC PETS X-BAND WORKSHOP ON RF STRUCTURES, BEAM DYNAMICS AND SOURCES 2 nd December 2010 Alessandro Cappelletti.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
CLIC RF Structure Development Mtg, Alexey Dubrovskiy and CTF team
Application of moderate (5 MW) X-band power sources for the CLIC accelerating structures testing program and other projects I. Syratchev, CERN.
RF Power Generation and PETS Design
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Review of rf structure test results
12 GHz High Power RF components requirements for CEA activities
Testing Infrastructure, Program and Milestones
Recent high-gradient testing results from the CLIC XBoxes
Measurements, ideas, curiosities
CLIC Feasibility Demonstration at CTF3
CLIC Power Extraction and Transfer structure (PETS)
Presentation transcript:

HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with great support from the SLAC klystrons lab team: V. Dolgashev, J. Lewandowski, S. Tantawi, S. Weatherly, J. Zelinski

Main beam Drive beam Accelerating structures PETS RF power A fundamental element of the CLIC concept is two-beam acceleration, where RF power is extracted from a high-current and low-energy beam in order to accelerate the low-current main beam to high energy. PETS

Electric field RF power density PETS specific features: 1.Big aperture, high V g, low surface E-field 2.High peak RF power (135 MW) 3.High current (100 A) 4.HOM damping through 8 slots 5.Special coupler with choke 6.Milling technology for fabrication 7.Body assembly with clamping  Frequency = GHz  Aperture = 23 mm  Active length = (34 cells)  Period = mm (90 0 /cell)  Iris thickness = 2 mm  Slot width = 2.2 mm  R/Q = 2222 Ω/m  V group= 0.459C  Q = 7200  E surf. (135 MW)= 56 MV/m  H surf. (135 MW) = 0.08 MA/m (ΔT max (240 ns, Cu) = 1.8 C 0 ) PETS parameters Surface electric field Surface magnetic field

PETS testing program External RF power source Drive beam* RF power sources RF high power source RF power out RF power in Drive beam RF power out ASTA (SLAC) CTF3 (CERN + Collaborations) Two beam test stand (CERN + Collaborations) Objective: to understand the limiting factors for the PETS ultimate performance and breakdown trip rate. Access to the very high power levels (300 MW) and nominal CLIC pulse length. High repetition rate – 60 Hz. Objective: to demonstrate the reliable production of the nominal CLIC RF power level through the deceleration of the drive beam. Test beam line (CERN + Collaborations) Objective: to demonstrate the stable, without losses, beam transportation in a presence of strong (50%) deceleration. *See I. Syratchev’s and E. Adli’s presentations

load ReflectionTransmission The first scaled ( GHz) full CLIC PETS version with damping slots and damping material. Low RF power measurements June 2010

ASTA is a new generation general purpose test stand, which will allow processing the various types of the high power RF equipment at X-band. The facility can provide a very versatile pulse length and power level. The ASTA pulse compressor with variable delay lines The ASTA pulse compressor with variable iris Two klystrons 50 SLED II with variable length and iris reflection Experimental area Uncompressed arm Gate valve Rf Phase shifter ASTA layout CLIC PETS RF power in the ASTA compressed arm 3dB hybrid PETS ASTA, SLAC PETS installed into the ASTA bunker at SLAC PETS ready for shipping to SLAC July 2010

General remarks  275 hours of PETS high power testing were overall accumulated.  In order to obtain breakdown statistics, the PETS was running at a fixed power level of 142 MW and pulse length 266 ns (18% higher pulse energy than in CLIC) for 125 hours.  The whole RF network system in ASTA was also being conditioned at the same time, which somewhat limited the power production stability at high power levels due to the vacuum interlocks trips in the waveguide circuit.

Average and peak power distributions 133 ns266 ns PETS/ASTA processing period BD statistics accumulation period (fixed power level) CLIC target Peak power Avg power Energy BD CLIC target pulse PETS processing history Typical RF pulse shape in ASTA during the last 125 hours of operation In total: 5.9x10 7 pulses 90 breakdowns CLIC target

RF in RF out Directional coupler Faraday cup Vacuum gauge PETS The breakdown acquisition signals: - Reflected and transmitted power - Vacuum controllers - Faraday cups mounted at both PETS extremities. Processing strategy: In case of breakdown, the RF power is shut down on the next pulse and restarted/ramped up after a few seconds, vacuum interlocks permitting. Two typical breakdown events in the PETS (raw data) F1F2 F1F2 ‘hard’‘soft’ 1.‘Hard’ event. The variation in reflection is measurable. 2.‘Soft’ event. The variation in reflection is negligible. Pre-breakdown pulse Breakdown pulse Reflected Transmitted 27 dB Breakdowns in the PETS

F2F1 1.In general, the breakdowns were grouped into two types of events with respect to the Faraday cups signals. 2.We suggested that this can help to identify the breakdown location by correlating the arrival times and amplitudes of the two. Following, “type-1” events are located close to the output coupler and “type-2” are closer to the input coupler. 3.We also observed that “hard” events are mostly associated with “type-1” events. Type-1 (output) Type-2 (input) Total breakdowns 53 Type-1 23 Type ns Type-2 (input) Type-1 (output) All breakdowns Breakdowns locations

‘hard’ events examples ‘soft’ events examples None of the registered breakdowns showed traces of pulse shortening (missing energy). Any of these events will be practically undetectable in the CLIC environment. Missing Energy

BDR statistics accumulation testing period (142 MW x 266 ns). Peak power Avg power Energy BD All registered events All breakdowns During ~125 hours of testing, 15 events were logged into breakdown counter following Faraday cups signals. Six of them were discarded from breakdown statistic due to the late (in time) appearance of the dark current and thus irrelevant for CLIC. Examples of discarded events CLIC target PETS breakdown trip rate

CLIC target Portion of the statistical distribution contributing to the BDR calculation x10 7 pulses were accumulated in a 125 hours run with fixed peak power and pulse length PETS breakdowns were identified giving a breakdown rate of 5.3x10 -7 /pulse/PETS. 3. Most of the breakdowns were located in the upper tail of the distribution and happened at earlier stage of the run, which makes the integrated BDR estimate rather conservative. 4. During the last 80 hours no breakdowns were registered giving a BDR <1.2x10 -7 /pulse/PETS counting only the pulses with average power higher than the CLIC nominal. 1.55x10 7 pulses PETS breakdown trip rate

1.The complete feasibility demonstration of the power production in CLIC will require PETS operation with 100 A drive beam (partially covered in CTF3 – 30 A). However these experiments will be more focused on the beam dynamics and machine protection issues (partially covered in TBL). 2.The feasibility of the PETS operation at a peak RF power level ~7% higher and with RF pulses ~10% longer compared to the CLIC requirement was successfully demonstrated in klystron driven experiments at SLAC. 3.The tests at a fixed power level were stopped, when the measured breakdown trip rate went close enough to CLIC specification: 1x10 -7 /pulse/PETS. In our case it was after 80 hours of operation without any breakdown (BDR <1.2x10 -7 /pulse/PETS ). 4.The demonstration has been done in more demanding environment then needed for CLIC - with extra input coupler and uniform RF power distribution along the structure (>50% of breakdowns happened closer to the input coupler). Summary

1.Further testing of the PETS at a CLIC RF power level and measured breakdown trip rate would require enormous operational time (hundreds of hours) to provide reasonable statistic in order to improve the BDR measurement accuracy. Together with tight ASTA experimental schedule this approach looks rather inefficient. 2.A more reasonable approach is moving towards even higher power levels: MW. It will potentially allow for a shorter testing time and could result in more understanding about PETS ultimate performance. To perform these tests, ASTA itself should be processed accordingly, to able to operate stable at such high power levels. Future plans