EU LTA-UPTAKE Supported by EIE-07-057 – EU LTA UPTAKE 1 European uptake of successful implementation of Industrial SME LTA’s as a part of Voluntary Agreements.

Slides:



Advertisements
Similar presentations
Action Plan David Dawson Head of Digital Futures Museums, Libraries and Archives Council.
Advertisements

The Intelligent Energy – Europe Programme at a glance
1 Intelligent Energy Europe 2009 European Commission, EACI Market Replication Eco-Innovation and Intelligent Energy Astrid Geiger, Head of Sector Energy.
A COLLECTIVE INITIATIVE FOR A NEW CULTURE OF BUILT ENVIRONMENT IN EUROPE
EU LTA Uptake BUILDING LONG TERM AGREEMENTS. EIE/07/057/S , 14 July Energy Efficiency is like a marriage:“Do it together!” Love at the.
EU SME policy The “Small Business Act” for Europe and its Review
The AeroSME Project: Practical Assistance for Participation in the EU Research Projects Paola Chiarini AeroSME Project Manager Hungarian Aeronautical Research.
Energy efficiency in Industry Energy Efficiency in the Austrian Industry Otto STARZER E.V.A., the Austrian Energy Agency.
ENTERPRISE EUROPE NETWORK INTRODUCTION Jan Gerritsen – Manager EEN IRELAND Blachardstown – 3rd February 2015.
REMODECE Project: WP6: Strategies for Market Transformation and Recommendations to Policy Makers Aggelidis Konstantinos Centre for Renewable Energy Sources.
Identify Partners and Training (Step 6 and 5): The role of Cluster-Excellence.eu and the European Cluster Managers' Club.
Capacity building for public authorities – EE7 Veronika Czako Project Adviser, EASME.
EUROPEAN REGIONAL DEVELOPMENT FUND Event – date, place About INTERREG EUROPE INTERREG EUROPE INTERREG IVC Joint Technical Secretariat Iruma Kravale, The.
The Irish standard for Energy Management – IS393
Seppo Silvonen Seppo Silvonen, Motiva Oy Finland Energy auditing as an essential part of the investment process Finnish national and EU energy.
Multiscale Service for monitoring NATURA 2000 habitats of European community interest Dr Stefan LANG Centre for Geoinformatics (Z_GIS) University of Salzburg.
The Austrian Adaptation Platform Sabine McCallum, 19 June 2013.
© EIPA – Marco Lopriore / EU enterprise and CIP Marco Lopriore Senior Lecturer Applying successfully to the Competitiveness and Innovation Programme.
CORPORATE SOCIAL RESPONSIBILITY IN THE CLOTHING SECTOR International and national initiatives.
Environmental Compliance Assistance Programme for SMEs – and beyond Imola Bedő DG Environment C1 – Sustainable Production and Consumption Unit.
VITA- Virtual Learning for the Management of successful SMEs LEONARDO DA VINCI PROJECT – TRANSFER OF INNOVATION January 2009 – December PTI-LEO
IREEN Project Meeting 5 – Manchester September 18 th 2012 WP1 – Collaborative Network Jaak Vlasveld.
EU Energy-related projects in Belarus. Elena Rakova, project manager June 30, 2011.
The INTENSE project: Improving Energy Efficiency in the Building Sector Workshop: Sustainable Energy Action Plans in Latvia: Regional Cooperation,
Sustain and Enhance Cooperation on Sustainable Development between Europa and Southeast Asia Cluster Workshop at the ASEAN-EU STI DAYS 2015 Tools to support.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
SME Policy – Beyond the crises Steiermark/Croatian Regions Brussels, 28 May 2009 Daniel Gassmann, Head of Sector Services, Quality and Reporting Executive.
European Commission Enterprise and Industry | | ‹#› The Lead Market Initiative and Sustainable Construction CEEC seminar, 8 May 2009 Antonio.
1 The sole responsibility for the content of this presentation lies with the authors. It does not necessarily reflect the opinion of the European Union.
EUROPEAN REGIONAL DEVELOPMENT FUND RECOMMEND Final Event, 11 September 2014, Varna EU Interregional Cooperation State of play and perspectives Jason Martinez.
EUROPEAN REGIONAL DEVELOPMENT FUND Event – date, place About INTERREG EUROPE INTERREG EUROPE INTERREG IVC Joint Technical Secretariat.
1 WE-Mentor preparatory meeting Stuttgart 12/2006 WE-Mentor Enterprising women in European Research mentoring India/Israel/Romania/Turkey WP 1 Review of.
Biofuels – EU policy context Funding and Legislation Workshops Glasgow, 26 May 2011 Francesca Giannini Scotland Europa.
Changing the way europe provides heat and electricity for a sustainable future.
1 Responsible Care Partnering Workshop Industrial Waste Initiative 24, 25 September 2013 Manal Al Badawi On Behalf of the Industrial Waste Sub-Committee.
1 DG Enterprise & Industry European Commission Conference on Better Regulation: Practical Steps Forward Reykjavík 6 June 2006 OVERVIEW OF THE BETTER REGULATION.
Green Investment Schemes: Maximizing their benefits for climate and society Diana Urge-Vorsatz 24th. April.2008.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
R.Sarcina SME ACTor SMEs Action learning facilitator. Ruggiera Sarcina Final Event 24 October 2008 Bucharest.
Regulations of Geothermal HP systems at local and regional level in Europe Contract nº: IEE/11/041 01/05/2012 to 30/04/2015updated: March 2014.
Supported by The sole responsibility for the content of this presentation lies with the authors. It does not represent the opinion of the Community. The.
A new impetus for Europe's energy efficiency policy Paul Hodson Head of Unit DG Energy, European Commission 09/10/2012.
The industrial relations in the Commerce sector EU Social dialogue: education, training and skill needs Ilaria Savoini Riga, 9 May 2012.
Michel Van Hoegaerden Programme Manager EU Expert Group 16/11/10, Brussels Joint Action on Health Workforce Planning and Forecasting STATUS BRIEFING.
EUROPEAN REGIONAL DEVELOPMENT FUND Stakeholder Workshop Brussels – 5 February 2014 INTERREG EUROPE Nicolas Singer | Senior Project Officer INTERREG IVC.
Work Package 1: Progress and Focus on specific issues 5th Steering Committee Meeting Rijeka, 26/2/2015 Presented by: Mrs Maria Poulou.
Green Public Procurement - a dynamic policy field in need of better data Robert Kaukewitsch European Commission, DG Environment GPP Coordinator Working.
Work package WP1 Improving competences and skills of the building workforce in Lithuania related to nearly zero energy buildings Acronym of the project:
RFP FOR DEVELOPMENT OF TRAINING MATERIAL, PROVISION OF BASE LINE TRAINING AND PROMOTION OF SASSA IN-HOUSE CORE TRAINING COMPETENCE.
Michael ten Donkelaar ENVIROS, s.r.o. Prague, 7 th of April 2016 Status WP 6 – Implementation of Adapted Energy Management Standard.
Update from the United States Standards and Conformity Assessment Work in the Sub Committee on Standards and Conformance.
The standard solutions to improving environmental performance Vicki Gomersall, Product Manager.
Work Package 2 Targeting innovation chain processes to tackle Societal Challenges Task 2.2 Involvement of society in societal challenges.
WE TRAIN PARTNERS. ZeroWIN Knowledge Community Management Implementation plan for Task 9.3.
REACH FOR POLYMERS A €480, month project aiming to increase the knowledge base of the European polymer industry, particularly SMEs, when complying.
EUROPEAN REGIONAL DEVELOPMENT FUND CLUE final conference, 24 September 2014, Turin EU Interregional Cooperation State of play and perspectives Johanna.
Kick Off Meeting Largs, Scotland
Lerend Netwerk Energie-efficiëntie - opstartsessie
Role of CEN and CENELEC in support to SMEs
Project KA2-CBHE School-to-Work Transition for Higher education students with disabilities in Serbia, Bosnia & Herzegovina and Montenegro (Trans2Work)
Made Green in Italy: a voluntary labelling scheme based on PEF
Closing the loop – An EU Action Plan for the Circular Economy
Harmonization of Policies recommendations for the integration of Sustainable consumption and production in the MED area.
Optimisation of Support Schemes for Renewable Energy Sources for Electricity Generation, Heating and Cooling Summary Slides Contract Number: EIE
SCP in the 7th Environmental Action Programme
European Innovation Platform for Knowledge Intensive Services Elke Van Tendeloo DG Enterprise and Industry Brussels, 04 June 2007.
Energy Management and Planning MSJ0210
Policy Instruments Proposals for RECP
Sustainable Mobility & Tourism as Drivers for Economic Development on European Islands Clemens Rosenmayr Policy Advisor, EUROCHAMBRES.
Ad hoc Group of Experts on Better Regulation
Presentation transcript:

EU LTA-UPTAKE Supported by EIE – EU LTA UPTAKE 1 European uptake of successful implementation of Industrial SME LTA’s as a part of Voluntary Agreements EU LTA Uptake September June 2009

EU LTA-UPTAKE Supported by EIE – EU LTA UPTAKE 2 Objective Web based toolkit for: LTA partners: –Industrial (SME) associations –National & regional public administrations To develop: voluntary long term agreements on energy efficiency improvement

EU LTA-UPTAKE Supported by EIE – EU LTA UPTAKE 3 Or……. How to save money with less regulations

EU LTA-UPTAKE Supported by EIE – EU LTA UPTAKE 4 Partners SenterNovemNetherlands ECONOTECBelgium SOFENABulgaria ENVIROSCzech Republic MotivaFinland CRESGreece KAPEPoland STEMSweden NEPASNorway

EU LTA-UPTAKE Supported by EIE – EU LTA UPTAKE 5 Deliverables LTA review in partner countries, DK & UK Project website Toolkit requirements Moderator training Expert platform Three signed LTAs Validated web based toolkit Workshops

EU LTA-UPTAKE Supported by EIE – EU LTA UPTAKE 6 Sectors Textile finishing industry Laundry service industry Others Motivation: Chain approach (clean towel) Wide spread in Europe

EU LTA-UPTAKE Supported by EIE – EU LTA UPTAKE 7 Why entering the EU LTA Uptake project? For public and industrial sector (associations): Facilitates national EE and GHG objectives Provides an international expert platform Provides tools for organisation, target setting, sector benchmarking and monitoring For individual companies. It might : Prevent environmental legislation and provide technical support, energy & costs saving, an improved image (and via ExBESS): benchmarking, energy management and E-learning

EU LTA-UPTAKE Supported by EIE – EU LTA UPTAKE 8 Proposed Tools 1.What is an LTA? 2.List of links to existing LTA websites in Europe 3.Pros and cons of the different policy options 4.LTA procedure timeline and tasks 5.Typical roles of key players 6.Example of work list for responsibilities of key players 7.Agreement structure options 8.Impact assessment calculation examples 9.What data to include in the cost-effectiveness calculation 10.Model table of content for agreement document

EU LTA-UPTAKE Supported by EIE – EU LTA UPTAKE 9 Proposed Tools 11.Checklist for the agreement document finalisation phase 12.Checklist for LTA scheme visual image design 13.Examples of marketing material 14.Example list of supporting tools for SMEs 15.Minimum data-set for reporting 16.Examples of yearly reporting 17.Model table of content for evaluation report 18.Experiences from existing LTAs, evaluation reports

EU LTA-UPTAKE Supported by EIE – EU LTA UPTAKE 10 Steps to an LTA

EU LTA-UPTAKE Supported by EIE – EU LTA UPTAKE 11 Schedule SONDJFMAMJJASONDJFMAMJ WP2 what tools Study WP3 tool designDesign WP4 LTAsRecruitmentFeed backSigning LTAs WP5 PlatformRecruitmentFeed backValidation of toolkits WP5Workshops Meetings KOKO PMPM EPEP EPEP PMPM Reports PRPR IRIR FRFR

EU LTA-UPTAKE Supported by EIE – EU LTA UPTAKE 12 Synergy EU LTA Uptake and exBESS: Top down and bottom up Sector level and company level 7 overlapping countries Common recruitment of actors Common events & meetings Common administrative tools