Snowmass, August 16, 2005 H.Weerts SiD Design Goals and Plans for Snowmass Snowmass H.Weerts Argonne Nat. Lab./ Michigan State Univ.

Slides:



Advertisements
Similar presentations
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Advertisements

H. Weerts SLAC SLUO meeting; Sept 18, 2008 SiD-- a compact detector for ILC H.Weerts for SiD detector concept Argonne National Lab.
A Final Word ILC Jan 8th, 2005 Eric Torrence University of Oregon.
SLAC EPAC M. Breidenbach124 January 2006 SiD SLAC EPAC
The SiD concept Yannis Karyotakis LAPP Annecy / IN2P3 March 21 st ‘05.
J. Brau ALCPG Workshop at Snowmass August 27, Concluding Remarks 2005 ILC Physics and Detectors Workshop at Snowmass.
“GLD” Detector Concept Study 21. Mar. Y. Sugimoto KEK.
D. Peterson, “WWS R&D Panel Project Registry”, ALCPG, Snowmass, 20-August World Wide Study Detector R&D Panel Project Registry Web Site web site:
SLUO M. Breidenbach126 September 2005 SiD SLUO
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Jerry Blazey May 31, 2007 LCWS07 1 SiD Overview & Opportunities Jerry Blazey Northern Illinois University LCWS07-Hamburg.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
ILCTRP WWS  ILCSC D.J.Miller for WWS; 16/11/ Report to ILCSC from the World-Wide Study of Physics and Detectors for a Linear Collider. 1.Proposed*
Worldwide Study Organizing Committee Report from Worldwide Study on Physics and Detectors ICFA meeting, Beijing August 2004.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
1 1 LCC Physics and Detector Hitoshi Yamamoto ILD WS, Kracow Sep 24, 2013.
Lucie Linssen, CLICdp, (bi-)monthly meeting, July 21st CLICdp news CLICdp (bi-)monthly meeting July 21 st 2014.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
ELG2336 Introduction to Laboratory
Mu2e WGM R. Ray Mu2e Project Manager Sept. 14, 2012.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
ACFA Summary Akiya Miyamoto, KEK KILC12 26 April, 2012.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
@ Future Plans for SiD & Opportunities for collaboration H.Weerts Argonne National Lab.
1 Snowmass2005 report 2005/09/26 H. Matsunaga GLDCAL meeting.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
Jim Brau for WWS to ICFA at Uppsala, 3 July Report of WorldWide Study on Physics and Detectors for ILC 1. LCWS at Stanford March Discussing.
State Facility Directors. State K12 Facility Officials Login 21 st Century School Fund has a grant from the Advancement Project to conduct a feasibility.
WWSWWS David J. Miller for WWS to ILCSC at Frankfurt, 10 May from the WorldWide Study on Physics and Detectors for ILC 1. LCWS at Stanford
ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off The Si licon D etector Design Study SiD Organization & Status H.Weerts Fermilab/Michigan State Univ. SiD kick.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
M. Oreglia, ALCPG07, 23 Oct 2007Slide 1 (of 1) Introduction to SiD; Preparing for a LOI Quick overview of SiD Charge to SiD speakers Substance of.
First Semester Final Project Web Design. Final Project Create a company, zoo, museum, etc. Your job is to create a web site for your business! Create.
Introduction to Web Authoring Ellen Cushman Class mtg. #19.
“Huge” Detector Concept 3 Sep 2004 ECFA LC Durham Satoru Yamashita ICEPP, University of Tokyo On behalf of many colleagues Towards our common.
SiD Snowmass 05 Jaros1 Optimizing SiD getting from here….……………….to there SiD Concept/Snowmass August 16, 2005 John Jaros.
SiD collab. Mtg., 30 jan 2008 H.Weerts Stimulate the discussion & Closing Remarks to SiD collaboration meeting 30 January 2008 H.Weerts Argonne National.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
SiD workshop, January 16-18, 2013 H.Weerts Building the SiD collaboration H.Weerts Argonne National Laboratory Proposal & suggestions.
Overview of a Plan for Simulating a Tracking Trigger (Fermilab) Overview of a Plan for Simulating a Tracking Trigger Harry Cheung (Fermilab)
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
Letters of Recommendation Fall What are Letters of Recommendation? Letters of support for you For use in scholarship & college applications If you.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
WORKSHOP CHARGE ACFA Physics and Detector Workshop Tsukuba, Apr 17, 2009 Hitoshi Yamamoto Tohoku University.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.
3 October, 2006GLD Meeting1 The Detector Chapter of The Detector Concept Report GLD Meeting 3 October, 2006 Akiya Miyamoto.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
ILD meeting Thursday May 30, 2013 Ties Behnke, Yasuhiro Sugimoto.
30 April 2014FCC-ee Physics Coordination meeting1 FCC-- ee coordination meeting 12 Nov 2015 Brief news.
Atlas Software May, 2000 K.Amako Status of Geant4 Physics Validation Atlas Software Week 10 May, Katsuya Amako (KEK)
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
June 7, 2006SLAC DOE Review1 ILC Detector Detector for Silicon Detector for ILC SLAC DOE Program Review June 7, 2006 John Jaros.
VLCW06, July 23, 2006 H.Weerts Vancouver, CA 1 Where YOU can contribute in SiD. H.Weerts Argonne National Lab for SiD concept design study.
27-Jan-2014 Upgrade Steering Group “Update on Phase 2 TP - muons” J. Hauser, UCLA  Update on progress for TP:  2 slides follow to be shown at USG02 (Upgrade.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Welcome to (MAP) 2014 winter meeting J.P.Delahaye MAP Collaboration (FNAL, May 31, 2014)1 SLAC: Dec 2-6,
ALCPG2005, Aug. 27, 2005 SiD Summary H.Weerts For the SiD Design Concept Study.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
Oct 22 Group Leaders Planning meeting
Standards Education Committee Update
What Is Next for SiD ? H.Weerts Argonne Nat. lab..
Preparations for the SiD Workshop at Fermilab, April 9-11
CLIC detector at SiD meeting 28/3/2010
The SiD Detector Outline Overview
The DBD: Outline and Scope
Lunar Calibration Workshop Status of the preparation
Presentation transcript:

Snowmass, August 16, 2005 H.Weerts SiD Design Goals and Plans for Snowmass Snowmass H.Weerts Argonne Nat. Lab./ Michigan State Univ.

Snowmass, August 16, 2005 H.Weerts SiD Intro & some history I Original concept for SiD from M.Breidenbach and J.Brau (2003) Official start of ILC detector concepts at ALCPG04, Victoria First SiD kick-off meeting with interested parties Critical SiD Questions document (still valid) Kick off meetings at ECFA & ACFA meetings Fall ‘04 Put SiD organization in place in Fall & Winter; form some subgroups and start work in those: CAL/PFA, tracker layout & design with work starting quickly. Followed by: solenoid feasibility, vertex, benchmarking Critical area for all development & progress in SiD with a lot of development and work done is simulation. Cont’d

Snowmass, August 16, 2005 H.Weerts SiD Intro II Critical area for all development & progress in SiD with a lot of development and work done is simulation. SiD now has a simulation of the baseline detector First version: SIDMAY05 and now the latest SIDAUG05 Description is at: howAttachments=true#attachments R&D needs of SiD is another crucial area MDI subgroup has started with first answers MDI questions Muon group was formed just before this workshop

Snowmass, August 16, 2005 H.Weerts SiD Organization EXECUTIVE COMMITTEE H.Aihara, J.Brau, M.Breidenbach, J.Jaros, J.Karyotakis, H.Weerts & A.White SOLENOID FLUX RET R.Smith -- VERY FORWARD -- SIMULATION N.Graf -- MDI P.Burrows T.Tauchi -- VERTEXING Su Dong -- CALORIMETERS R.Frey J.Repond -- MUON H.Band H.E.Fisk -- BENCHMARKING T.Barklow -- COST M.Breidenbach -- R& D COORDINATOR A. White ADVISORY COMMITTEE All names on this chart

Snowmass, August 16, 2005 H.Weerts SiD at Snowmass 2005 Over the last year we have had many phone meetings which were all more or less driven by subgroups. Had one afternoon meeting at LCWS05 (see SiD Web page) Snowmass 2005 is first occasion for people interested to participate in Sid to actually spend some time together and work on SiD. This is an important step for SiD and we think this may be the first in a series of SiD design study (…) meetings

Snowmass, August 16, 2005 H.Weerts Plans for Snowmass Plans vary for different subgroups and we will hear in next talks about this General theme: simulation and study of the baseline detector and possibly variations of that baseline, but this is rather group dependent Agenda for SiD plenary and subgroup meetings is on the workshop Web site and will be updated daily.

Snowmass, August 16, 2005 H.Weerts SiD at Snowmass; 2 weeks Tuesday, Aug 16: SID plenary & working groups Thursday, Aug 25: SID plenary & group summaries prepare summary talk W’day, Aug 24: SID working group meetings Thursday, Aug 18 – Tuesday, Aug 23: no official SiD meetings W’day, Aug 17: SID working group meetings There are many other interesting meetings/activities during this time, BUT this is the only real “workshop” time to work on SiD. Plan to take advantage of it. Friday, Aug 16 & Saturday Aug 27: Workshop Summaries

Snowmass, August 16, 2005 H.Weerts General info on SiD Website: With most links: working groups, agendas, meetings, baseline detector drawings, etc. Baseline description as in simulation: wAttachments=true#attachments Not the most modern, latest technology & sexiest WEB site, but it has the information

Snowmass, August 16, 2005 H.Weerts After Snowmass Part of the Snowmass discussions, but here is some information for those discussions: Hopefully Snowmass is the start of many activities to be continued Subgroups should plan on producing a write-up of work done at Snowmass These write-ups or a more egneral Sid Snowmass summary may be the first draft for the Sid outline to be ready for LCWS06 in March 2006 With that ….. wish us a successful workshop