Management structure and procedures KickOff Meeting ICT-AGRI 2 4 th – 5 th Februrary 2014 Niels Gøtke, Iver Thysen Jan Erpenbach, Elke Saggau.

Slides:



Advertisements
Similar presentations
1 Terms of Reference for the GEO Executive Committee Note: These Terms of References were approved at GEO-6 Helen Wood, GEO Secretariat Director.
Advertisements

World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
Portable and Predictable Performance on Heterogeneous Embedded Manycores (ARTEMIS ) ARTEMIS Project Review October 2014 WP1 “Management and IPR”
“ FIRST STEP TO FIRST JOB – Innovative methods leading YOUTH to a solid career” VS/2012/0017 – VP/2011/010/0563 Kick-off meeting, 20 February 2013, Bucharest,
Management Structure and Responsibilities SUST-RUS
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
CLARIS NCT1 Management, coordination and dissemination activities J-P Boulanger (CNRS) and Carlos Ereño (UBA) (CNRS, CONICET, UBA, UR) k To manage the.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
Oficina AproTECH de AETIC: Información y asesoramiento en la preparación de propuestas de I+D+I FP7: Project Management issues, Roles and.
WP1: Mapping and Analysis of Research and Innovation and Update of the Strategic Research Agenda Jack Verhoosel, TNO Jan Erpenbach, BLE Christophe Guizard,
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
The Preparatory Phase Proposal a first draft to be discussed.
OPERATIONAL PROGRAMME TRANSNATIONAL COOPERATION ATLANTIC AREA The Managing Authority September 2007 RECRUITMENT FOR JOINT TECHNICAL SECRETARIAT.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Green Partnerships Local Partnerships for Greener Cities and Regions Project organisation Kick-off meeting Crete, 9-10 April 2013 Mateja Softić, Alianta.
Cultural Heritage and Global Change: a new challenge for Europe Working for strengthening the European Research Area Towards Joint Programming in Research.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
MARIFISH (Era-Net) Programme – Sequencing of Activity Work Packages Jul-10 Implement communications strategy Jan-07Jul-09Jan-10Jul-07Jan-08Jul-08Jan-09.
Reporting during the lifetime of the project Moldova – Research Horizon 30 January 2013 Kristin Kraav.
WP0 Management Gillian Armitt. Outline Objectives for Year 2 Progress Issues resolved/outstanding Forward planning Electronic submission of Form C.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
WP1Transnational project and financial management Establishment-Operation of the Project Management and Implementation Instruments Region of Peloponnese.
EPOCA – 11. June EPOCAConsortiumOrganisation.
Dunstaffnage Marine Laboratory Oban, Argyll, Scotland PA37 1QA ECASA Kick-off Oban 8-9, December 2004.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Initial plans for WP 2 KickOff Meeting ICT-AGRI 2 Jan Erpenbach, Elke Saggau.
WP1 Consortium management OBJECTIVES To ensure compliance with the Grant Agreement and Consortium agreement Specific objectives: 1: To secure day-to-day.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Initial plans for WP 4 KickOff Meeting ICT-AGRI 2.
ICT-AGRI / SmartAgriFood Joint Call Iver Thysen DASTI ict-agri.eu.
December_2009 Partnership building. December_2009 Partnership building within the partnering process COREGROUPCOREGROUP FORMAL LAUNCH $ $ $ $ $ cost centre.
Kick-off Meeting ISPAVE, Rome, Italy Monday February 28 th 2005 V IRO T ICA Co-ordination of Research on Genetic Resistance to Plant Pathogenic Viruses,
Brainstorm: Ideas for sustainability after ICT-AGRI-2 Antoinette Jordan, Dr Raymond Kelly TEAGASC ICT-AGRI-2 Governing Board meeting, Athens 5-6 October.
Consortium building PHOENIX Training Course Laulasmaa, Estonia
RARECARENet: how will we work together?. Information network on rare cancers Advisory Board The Coordinator (Project Management Team) Steering Committee.
Project Procedures Start up Governance Internal Communications – Lists – documents Meeting Schedule Deliverables Cost statements.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
Roland Brandenburg, FFG Implementing Joint Calls Brussels, September 2015 Introduction to the ERA-LEARN 2020 platform & manual for call implementation.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Governance.
Impact assessment and evaluation of ERA-NET effectiveness Juliana Zweifel, Bert Beck, Katrien Broekaert, Iver Thysen, Agris Nikitenko, Markus Loetscher.
ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1
WP6 – Dissemination Project Name: Enhancing Students Participation in Quality Assurance in Armenian HE- ESPAQ Ref TEMPUS BE-TEMPUS-SMGR.
SPC Advisory Committee Training Fall 2015 Institutional Research President’s Office SPC 10/9/20151.
Information Overview SF: Planning & Programming Workshops for EC Delegation Patrick Colgan & Ján Krištín PROGRAMMING PROCEDURES in Support of Regional.
URBACT IMPLEMENTATION NETWORKS. URBACT in a nutshell  European Territorial Cooperation programme (ETC) co- financed by ERDF  All 28 Member States as.
PicoSEC : Project Management Etiennette Auffray, Network Coordinator CERN PH-CMX.
Manfred Horr, Project Coordinator Head of Section Economic Policy and Private Sector Development German Technical Cooperation (GTZ) Kick-off workshop,
Federal Department of Economic Affairs, Education and Research EAER Federal Office for Agriculture FOAG Task D 3.4 Report "Lessons learnt" 04/02/ /209.
Review Preparation Meeting of the FP7 Project J-AGE Vienna 25th March 2015.
J-AGE I Status/Closing Report JPI MYBL - GA Meeting Brussels 21th January 2016.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
ICT Smartcities 2013 FP7-SMARTCITIES-2013 WP6 – Project Management OPTIMising the energy USe in cities with smart decision support system (OPTIMUS) Objective.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
Consortium Agreement Kari-Jouko Räihä. Characteristics  Origin Basis: UNECA (Unified Network of Excellence Consortium Agreement) Terminology adapted.
Kick Off Meeting Largs, Scotland
AMICI WP1 – Management, coordination and dissemination
WP3 - Evaluation and proposal selection
SEE-ERA.NET PLUS Joint Call
WP1 - Consortium coordination and management
Funded by the Erasmus+ Programme EPP JO-EPPKA2-CBHE-JP Lina Tsakalou
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
AMICI WP1 – Management, coordination and dissemination
Helene Skikos DG Education and Culture
Roles and Responsibilities
Role of Evaluation coordination group and Capacity Building Projects in Lithuania Vilija Šemetienė Head of Economic Analysis and Evaluation Division.
- Kick-off meeting - ERANET Cofund BlueBio WP4 (Leader: AEI)
Presentation transcript:

Management structure and procedures KickOff Meeting ICT-AGRI 2 4 th – 5 th Februrary 2014 Niels Gøtke, Iver Thysen Jan Erpenbach, Elke Saggau

3. Management structure and procedures 3.1. Consortium Agreement 3.2. Governing Board 3.3. Network Management Group 3.4. Participant roles 3.5. Advisory Committee 3.6. Meetings

Governance structure Source: DoW, Annex B, p. 21

3.1. Consortium Agreement The principal decision-making body is the Governing Board composed of one member from each ERA-NET partner. The strategies and activities decided by the Governing Board are implemented by the Work Package Leaders and the Coordinator, who together constitute the Network Management Group, which is responsible for coordination and monitoring of activities within ICT-AGRI-2. The governance will be executed in accordance with the Consortium Agreement to be agreed and signed by all partners at the beginning of ICT-AGRI-2.

3.2. Governing Board (GB) principal decision-making body one member per partner rules for GB established in the Consortium Agreement annual meetings scheduled for October or November prepared by WP6 chaired by the Coordinator Responsibilties: strategic orientation regarding the activities in the ERA-NET Approval of plans for the work in the WPs Evaluation of progress of work in WPs Decisions concerning reallocation of tasks and budgets Approval of plans for joint trans-national calls Approval of deliverales from the ERA-NET Approval of financial and administrative reports before submission to the COM

3.3. Network Management Group composed of WP-Leaders and Coordinator share information of progress of tasks in each WP assure interdependencies between WPs are adequately secured meetings (face-to-face, via telephone or video) ad hoc as required for progress meetings prepared and organised by WP6 chaired by the Coordinator Responsibilties; Coordination between WPs Preliminary approval of plans for the work of the WPs Evaluation of progress of work in the WPs Preparation of decisions concerning reallocation of tasks and budgets Approval of milestones Preliminary approval of plans for joint trans-national calls Preliminary approval of deliverables from the ERA-NET Preliminary approval of financial and administrative reports

3.4. Participant roles Coordinator (DASTI) Work Package Leader Task Leader Participants ( DASTI, DAFA, ILVO, IWT, MMM, IRSTEA, BLE, BMEL, GRNET, TEAGASC, MARD, MiPAAF, LAS, ASU, MEA, TNO, DLO, FOAG, INFO MURCIA, CTA, GDAR, TUBITAK, DEFRA ) WP1 – Mapping&analysis of R&I, Update of SRA (TNO) WP2 – Transnational joint calls for coordinated research&innovation (BLE) WP3 – Coordination within the ERA (TEAGASC) WP4 – Dissemination, online tools and sharing of good practises (ILVO) WP5 – Impact assessment and evaluatino of ERA-NET effectiveness (FOAG) WP6 – Management (DASTI)

3.4. Participant roles Coordinator Responsibilities: Preparing and chairing GB-meetings Preparing and chairing NMG-meetings legal, contractual, financial & administrative management of the consortium Liaison with and reporting to the EC Primary contact point for external approaches

3.4. Participant roles Responsibilities: Coordination, supervision and guidance of the work in the WPs Preparation and chairing of WP meetings (face to face or electronically as appropriate) Preparation of plans for work and actions in the WPs in collaboration with the Task Leaders High quality and timely completion of milestones and deliverables Contributions to the ERA-NET as whole via the NMG Work Package Leader

3.4. Participant roles Responsibilities: Execution, supervision and guidance of the work in the WP Task in collaboration with other members of the WP Contributions to the WP as a whole via shared responsibility for the WP Task Leader

3.4. Participant roles Responsibilities: National interactions with stakeholders (Task 1.3) Implementation of calls on the national level (Task 2.4) Participation in GB-meetings (Task 6.1) Conduction of work associated with specific roles in WPs Overall contribution to ICT-AGRI-2 through national or regional dissemination and interaction with stakeholders as well as constructive evaluation of internal drafts and proposals Participants

3.5. Advisory Committee provide advices on the strategies and main actions of ICT-AGRI-2 invited to regular meetings in conjunction with suitable ICT-AGRI-2 events prior to decisions in the GB the AC is asked for advices through correspondence Responsibilties: Provision of advices on the strategies and main actions of ICT-AGRI-2

3.6. Meetings starting point todays “ICT-AGRI-2 KickOff“ annual GB meetings October/November June 2014 “Smart AgriMatics“ International conference in Paris ICT-AGRI-2 events annually in June/July