Management Review 7-24-2012 Maurice Fitz-Gerald President-Sales Manager Terri Gaquerel General Manager Adam Hunt Financial Officer Danny Pike Engineering.

Slides:



Advertisements
Similar presentations
Total Productive Maintenance
Advertisements

There is a difference.... Future Business, Why VEKA?
Sunday Business Systems Asset Tracking Database Control Calibrated Equipment Manage Preventive Maintenance Maintenance Tracking.
Checking & Corrective Action
©2011 Team Quality International Inc. PO Box , Simi Valley, CA 93094, USA Tel:
HACCP Manager Software™
Department of Industrial & Systems Engineering Florida International University Cyber Manufacturing Blueprint Version 2 November 2, 1998.
COMPAL A Professional ODM/OEM Company. Compal Page: 2 Compal Europe Ltd (UK)
Quality Management System
Quality Management Systems Chapter 10. Introduction ISO- International Organization for Standardization Founded in 1946, in Geneva, Switzerland Main function.
Districts In Good Standing. Origins Discussed at November 2010 meeting Approved by the Soil and Water Conservation Commission during January 2011 meeting.
Lean Manufacturing Chris Poteet Scott Carroll.
Quality Assurance. Function Quality program Quality Assurance –Covers everything from raw materials and GMP verification through finished-product release.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
QMS Tips and Traps (ISO TS16949)
5.2 Personnel Use competent staff Supervise as necessary
Product and Process Measures Drive Continuous Product Quality and Business Improvement Angelo G. Scangas, President Quality Support Group, Inc
SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first.
ISO 9000 Introduction Imran Hussain.
ISO 9000 Overview The Purpose of this Overview l “What is ISO 9000?” l What will it require from YOU, as a (Company) Employee?
SchedulingProducingControllingSchedulingProducingControlling.
POSITIONVACANCIESREQUIREMENTS Project Engineer1 Must possess at least Degree in engineering or equivalent. Good interpersonal and communication skills,
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
The Maintenance and Engineering Organization
Regulatory Overview.
TOOL MANAGEMENT INTRODUCTION
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
Visit us at E mail: Tele:
CS3100 Software Project Management Week 26 - Quality Dr Tracy Hall.
Software Project Management Lecture # 10. Outline Quality Management (chapter 26)  What is quality?  Meaning of Quality in Various Context  Some quality.
Quality Activity Matrix Presented by Sandra Toalston President, SanSeek 1.
Customer-Supplier Division Supplier Selection & Qualification A Podcast presentation for members of the Customer-Supplier Division and ASQ Presented by.
Software Project Management Lecture # 11. Outline Quality Management (chapter 26 - Pressman)  What is quality?  Meaning of Quality in Various Context.
C Learning Objectives Power Notes 1.Just-in-Time Principles 2.Applying a Just-in-Time Approach 3.Accounting for Just-in-Time Operations 4.Accounting.
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
Concept & Application  ISO 9000 : 2000  Quality Concepts  Kaizen  Quality circle  5s.
SchedulingProducingControllingSchedulingProducingControlling.
TD/MSD REVIEW CHARGE AND AGENDA Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
Doane Pet Care Company Pet Food Safety System (PFSS) M.W. Merkel September 23, 2003 Animal Feed Safety System Public Meeting.
Internal Auditing ISO 9001:2015
Checking and Corrective Action EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
Admin. Manager Maintenance Unit Support Asst. Administrative Services EquipmentInstrumentsLinen DON-ADMINISTRATIVE SECTION Organizational Chart.
Quality Standards ISO:9000 ISO:9000 Quality Systems Under ISO:9000 Quality Systems Under ISO:9000 ISO:14000 ISO:14000 ISO Certification Process ISO Certification.
? Training removes doubt, instills confidence, and lays the foundation for everyone’s skill and experience level.
Food Safety and Sanitation Joan Shorter Director of Food and Nutrition Services Prince George’s County Public Schools.
QSB Quality System Basics & Q7 tools in practice
The following training presentation is for all 1Prospect employees and is taken upon joining the company team. Quality Management System (QMS) Training.
Quality Management: Mutually beneficial supplier relationships.
Contact Us : Online | classroom| Corporate Training | certifications | placements|
NASC Audit Program & State Registrations. NASC Audit Program & State Registrations.
Employee Orientation to the ISO 9001 Quality Management System
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Chapter 27 Cost Management for Just-in-Time Environments
Quality Management Process
Quality Management Systems: Elements, implementation of documentation
The following training presentation is for all employees and is taken upon joining the company team. Quality Management System (QMS) Training Proprietary.
Clinical Engineering Lecture (3).
Quality Quality is “a characteristic or attribute of something.”
IMPLEMENTATION OF EIGHT PILLARS THE TOTAL PRODUCTIVE MAINTENANCE AT WATER SUPPLY COMPANY Iswandi Idris Ibrahim Ruri Aditya Sari.
KMCO CAPA System Training
ISO 9001 Awareness Training.
Process Maps and Turtle Diagram Example
עקרונות ניהול איכות דני חייט MSM.
UNDERSTANDING FOR STANDARD
Quality Measurable characteristic Cyclomatic complexity Cohesion
AS 9100 Awareness Training.
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Preparation for Third Party Audit
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Company X ISO9001:2000 Implementation Databases
Presentation transcript:

Management Review Maurice Fitz-Gerald President-Sales Manager Terri Gaquerel General Manager Adam Hunt Financial Officer Danny Pike Engineering Manager Steve Williford Q.A. Manager

The System

NACCI’s QUALITY POLICY

ISO 9000:2008 CERTIFICATION

OUR QUALITY OBJECTIVES A.) Quality/Manufacturing: Zero defects at customer, Goal:0% B.) Sales: 100% Sales to Budget, Goal:100% C.) Administration: Customer Average Days to Pay, Goal:55 days D.) Manufacturing: % of Weekly Production Schedule, Goal:100% E.) Manufacturing/Quality: Casting Production Scrap, Goal:<8% F.) Administration/Manufacturing: On Time Delivery, Goal:100%

NACCI uses several software packages in monitoring the quality system JobBoss is used to Graph Such Items as: Scrap, Delivery, Metal Usage, Customer Complaints As well as Customer Returns. (All items from JobBoss are reported directly to production floor daily thru an electronic bulletin board) GagePack is used for Calibration of Gauging Equipment QTK is used for recording NC’s, RMA’s, PA, & Verification of any and all Quality Issues

The Process

All Raw Materials Must Be Processed through a Receiving Inspection for Verification and Color Code Marking conducted by Quality Control.

Once a Job is scheduled it is communicated to the production staff through the JobBoss- ShopProd system and to the operators thru the electronic board and the Traveler (see next slide). A traveler provide all necessary information to the operator who will run the casting machine. The Traveler also provides added instructions to the inspection process including previous Quality Alerts.

Add Traveller-elec board

training

CASTING PRODUCTION SCRAP

CUSTOMER RETURNS Zero DEFECTS

CORRECTIVE ACTIONS CARs FOR NON-CONFORMING PRODUCT ARE REVIEWED, AT A MINIMUM BY THE QA MANAGER, ENGINEERING MANAGER TO ALLOW FOR CAPTURING THE ASSOCIATED QUALITY COSTS IN THE JOB. CARs FOR CUSTOMER COMPLAINTS REQUIRE AN INITIAL RESPONSE TO THE CUSTOMER WITHIN 48 HOURS OF RECEIVING THE COMPLAINT. We had 18 CARs recorded January 1 st through June 30 th and are broken down as: Manufacturing defects 11 Vendor defects 02 Written Customer Complaints 03 Internal Audit Findings 02

PREVENTIVE ACTIONS PREVENTIVE ACTIONS ARE TO DEAL WITH POTENTIAL NONCONFORMITIES. PARs ARE REVIEWED, AT A MINIMUM BY THE QA MANAGER, ENGINEERING MANAGER TO ALLOW FOR CAPTURING THE ASSOCIATED QUALITY COSTS. PREVENTIVE ACTIONS MAY BE INITIATED AT THE DESCRETION OF THE EXECUTIVE COMMITTEE, DEPARTMENT MANAGERS, & SUPERVISORS. We had 9 PARs recorded January 1 st through June 30 TH and are broken down as: Fixture01 Spreader wear with Concoa casting die was repaired. Internal Audit Finding02 Form revision date did not match Control Document Master List. No CT-01 forms on file with engineering to proof procedure followed. Policy00 Process01 Torque Wrench setting to Newton vs FT LBS. Instructions to check and set added to traveler. Procedure00 Tooling01 Under size chamfer on small bonnet die repaired eliminating burr being left at the CNC tapping operation.

North American Casting Corporation, Inc. Organization Chart President/Sales Manager Maurice FitzGerald General Manager Terri Gaquerel Quality Manager Steve Williford Quality Auditor Financial Officer Adam Hunt Plant Manager Doug FitzGerald Casting Manager Lionel Gaquerel Engineering Manager Danny Pike Maintenance Manager Rick Cooper Shipping & Receiving Casting SetupDie Shop/Machinist Associates Secondary Secondary Associates Casting Associates