Baseline Performance = 2.6% Goal Performance = 1.4%

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Presentation Instructions
© 2008 RightNow Technologies, Inc. Title Best Practices for Maintaining Your RightNow Knowledge Base Penni Kolpin Knowledge Engineer.
Preproduction: Engineering Design Can you design your own product?
Root Cause Analysis Procedure (IMSP525) Training
Project quality management Cody Ronning 3/23/2015.
TECH581 Improve/Control Presentation Fall 2008 Date: 12/09/08 Team Members: xxxxx xxxxx Sound Removed.
Barry Murash MBBit Nortel 2007
Overview of DMAIC A Systematic Framework for Problem Solving
Instructions & Notes This template was created to help you: – Show the team where you are going via slides representing each planned activity. – Keep your.
Wegmans Frozen Cookie Capacity Increase Final Project Presentation Richard Latham, Bridget Eggers, Tyler Brent, Valeria Gonzalez.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Recreation and Wellness Intranet Project
Chart Your Course to Business Success On Target Business Intensive: Session 7 May 8, 2012 Advisors On Target 1.
Define the problem to be solved. Measure the current performance. M.
On Target Contractor’s Blueprint Chart Your Course to Business Success On Target Business Intensive: Session 8 November 14, 2013 Advisors On Target 1.
Value Analysis/ Flow Analysis
© Mahindra Satyam 2009 Defect Management and Prevention QMS Training.
Travel Website Enhancement Project Project Update First Name Last Name.
Welcome to Lean Six Sigma Green Belt Training
Project Management From Planning to Action A matter of communication.
IT Requirements Management Balancing Needs and Expectations.
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
1. Problem Statement 2. Problem Objective 3. Primary Metric 4. ‘BACK STOP’ Metric Six Sigma Foundations Continuous Improvement Training
Project Status Report Presenter Name Presentation Date.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Certificate IV in Project Management Qualification Code BSB41507 Unit.
5-1 D M A C I efine: This stage lays out the goals of a process improvement project that are consistent with both the organization and the customer’s needs.
Seven Quality Tools The Seven Tools –Histograms, Pareto Charts, Cause and Effect Diagrams, Run Charts, Scatter Diagrams, Flow Charts, Control Charts.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Finance Vic Rainsford Vice President Planning & Analysis Jim Palmer Sr. Mgr. Planning & Analysis.
ABOUT MARINO ASSOCIATES Full Service Business Consulting and Education Firm In Third Decade of Business Some Clients ; AT&T, Eastman Kodak, Canbera, Arris,
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Copyright 2015 DMAICTools.com All Rights Reserved DMAIC Applied to Risk Reduction.
Covert/GSC Partnership May, 2011 Confidential – Internal Use Only.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Project Chartering & Approval Process
CUSTOMER ORDERING QUICK REFERENCE GUIDE November 9, 2015.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Week 4 Certificate IV in Project Management Qualification Code BSB41507.
Project Management Requirements Prof. Ralph Locurcio, PE Dr. Troy Nguyen, PE.
DMAICTools.com thanks our industry partners for sharing their forms - use it, improve it, share it, send us back a better version!
Flowcharting George Kesselaar. Agenda What is Flowcharting? How do we do it? –Symbols –Example (steps) –Rules of Thumb Exercise (Amazon / Fedex) Groups.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
THE VALUE (SUPPLY) CHAIN STRETCHES FROM THE BEGINNING OF YOUR SUPPLIER’S SUPPLY CHAIN THROUGH ALL OF YOUR PROCESSES THAT CREATE VALUE FOR YOUR CUSTOMERS.
Continuous Improvement Project (A Guideline For Sponsors)

The DMAIC Method
Quality Management.
Lean Six Sigma DMAIC Improvement Story
Continuous Improvement Projects
Technological Skills “Flow Charting”
Six Sigma DMAIC Improvement Story
Intracompany Stock Transfer Scenario Overview
ISA 201 Intermediate Information Systems Acquisition
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Intracompany Stock Transfer Scenario Overview
Lean Six Sigma DMAIC Improvement Story
Lean Six Sigma DMAIC Improvement Story
Certification Project Template
Delivering a Lean Project
Title: Owner: Ver: Date:
Title: Owner: Ver: Date:
A3 Project Title Project Lead: Facilitator: Project Champion(s):
Maintenance.
CIS12-3 IT Project Management
KAIZEN PROCESS INTEGRATING MANUFACTURING & SPECIAL PROCESSING.
Intracompany Stock Transfer Scenario Overview
DMAIC STANDARD WORK TEMPLATE
DMAIC STANDARD WORK TEMPLATE
Company X Process Mapping Training
Lean-Green belt six sigma program
Presentation transcript:

Baseline Performance = 2.6% Goal Performance = 1.4% Team Charter Project Scope Opportunities A 50% reduction in the Cedar Essentials warranty rate equates a $247K annual savings and a 2% increase in annual sales Problem Statement Warranty returns on the “Cedar Essentials” product line are at 2.6% of sales volume and increasing. Overall Metric Total Warranty Rate = (Returned Qty / Shipped QTY) x 100 Project Metric Cedar Essentials Warranty Rate (same metric as above, but for Cedar Essentials line) Baseline Performance = 2.6% Goal Performance = 1.4% Project Status Actions / Open Issues Historical and current warranty rate confirmed Initial feedback gathered from sales team on top problems Analysis of product returns scheduled for next week – meeting at returns center with engineering team Pareto chart and root cause analysis will follow product teardown session Action Owner Timing Status Confirm warranty numbers JL 4-Mar Complete Obtain sales team feedback RG 14-Mar Schedule product teardown 16-Mar Conduct teardown Team 25-Mar On Track Present pareto & root cause summary 15-Apr

Baseline Performance 84% of this spike due to AD chairs product made in week 48 of 2010 – need to investigate further Project Goal = 1.4% Warranty Return Rate

Sub-Pareto Charts Analyze Phase – Sub-Pareto Charts for AD Chair Defects and Direct-Ship

DOCUMENT START OR END POINT MULTIPLE PROCESS STEP DOCUMENTS DECISION POINT AND RESPONSE PATH DATA DELAY OR WAIT LINK TO ANOTHER PAGE OR FLOWCHART © 2009 dmaictools.com

Receive Wood & Hardware CNC Cutting & Edge Routing Process Flow – Model AD Chair Manufacturing Drilling program DFA-3 Fixture 1247-14 Inspect wood per RI plan 760-11A Verify parts & counts via template 2910 Receive Wood & Hardware CNC Cutting & Edge Routing Pre-Drilling Assemble Leg Supports Start Hardware on no-inspect status RI Work Instructions ASM Work Instructions Fixture 1248-14 Fixture 1249-14 Template C87-0 Verify parts & counts via template 3000 Assemble Seat Assemble Seat Back Inspect Alignment Add Hardware Package Package & Ship Stop