Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
AP STUDY SESSION 2.
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
David Burdett May 11, 2004 Package Binding for WS CDL.
We need a common denominator to add these fractions.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
1 The Blue Café by Chris Rea My world is miles of endless roads.
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
CS 6143 COMPUTER ARCHITECTURE II SPRING 2014 ACM Principles and Practice of Parallel Programming, PPoPP, 2006 Panel Presentations Parallel Processing is.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
“Start-to-End” Simulations Imaging of Single Molecules at the European XFEL Igor Zagorodnov S2E Meeting DESY 10. February 2014.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Before Between After.
25 seconds left…...
Januar MDMDFSSMDMDFSSS
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Granular calorimeters Infrastructure
AIDA KICK OFF MEETING WP9
Presentation transcript:

Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011

2 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Outline Proposal –Partners –Deliverables and Milestones –Description of work Sub-tasks Look ahead –fill it with life Meeting and reporting

3 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Proposal WP 9: Infrastructure for detector R&D, 2.6M out of 8M Calorimetry 0.75M, cf EUDET: 1.99M of 7M total Much smaller budget, but still aim at integrating all active European partners Enlarged community: DHCAL effort grown after EUDET start AIDA is only a small part of CALICE and FCAL activities Proposal kept vage and general

4 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Partners CERN UCL - Louvin IPASCR - Prague CNRS –IPNL Lyon –LAL Orsay –LAPP Annecy –LLR Palaiseau –LPC Clemront –LPSC Grenoble DESY UHEI ( third party) MPG-MPP Munich Wuppertal TAU Tel Aviv UIB Bergen AGHUST Kracow IFJPAN Kracow CIEMAT Madrid (3rd p) 18 groups, 10k/y

5 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Deliverables D 9.7: Integrated infrastructure for highly granular calorimeters –Due month 40 (May 2014), lead DESY D 9.9: Adequation of Geant 4 simulation of hadronic showers in different media (report) –Due month 46 (Nov 2014), lead DESY In WP 9.1, but probably requesting input: D 9.8: Infrastructure performance and utilization (report) –Due month 46 (Nov 14), lead CSIC

6 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Milestones MS 42 Gas system, control and bench structure –due month 24 (Jan 2013), lead CNRS-LAPP MS 43 3rd generation fast read-out chips –due month 30 (Jul 2013), lead CNRS-LAL MS 44 Multilayer tungsten structure with position control and monitoring for forward calorimeters –due month 30 (Jul 2013), lead DESY-Z MS 45 Calibration and power supply system –due month 36 (Jan 2014), lead UIB MS 46 Electromagnetic calorimeter of at least 18x18cm 2 area –due month 36 (Jan 2014), lead CNRS-LLR MS 47 Multichannel readout ASICs for luminosity detector –due month 40 (May 2014), lead AGH-UST

7 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Description of Work Mechanical structure to place and move elements –CERN, DESY, UCL, CIEMAT Lumical structure, W radiator and ASICs –DESY, TAU, AGH-UST, IFJPAN ECAL extension of the EUDET module –IPASCR, CNRS-LAL, -LPSC, -LLR Hadronic structure with tungsten radiator and services –CERN, DESY, Wuppertal, MPG-MPP, IPASCR, CNRS-LAL, -IPNL, - LAPP, -LPC, UIB, UCL, CIEMAT

8 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Sub-tasks ECAL: Daniel Jeans –LLR, LPSC, IPASCR AHCAL: Erika Garutti –CERN, DESY, MPG-MPP, IPASCR, UIB, Wuppertal DHCAL: Imad Laktineh –LAPP, IPNL, LPC, CIEMAT, UCL FCAL: Wolfgang Lohmann –CERN, DESY, AGH-UST, IFJPAN, TAU FEE: Nathalie Seguin-Moreau –LAL, UHEI TBM: Erik van der Kraaij –CERN, DESY, UCL, CIEMAT

9 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 ECAL R.Poeschl

10 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 ECAL

11 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 ECAL plans

12 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 AHCAL E.Garutti

13 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 AHCAL

14 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 AHCAL plans

15 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 DHCAL I.Laktineh

16 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 DHCAL

17 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 DHCAL plans

18 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 DHCAL plans

19 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 FCAL

20 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 FCAL

21 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 FCAL plans

22 AIDA Kick Off meeting: WP9.5 FEE Second generation ASICs for EUDET Auto-trigger, analog storage, digitization and token-ring readout Power pulsing : <1 % duty cycle Optimize commonalities within EUDET (readout, DAQ…) Dedicated run produced in March 2010 –25 wafers received in June – chips packaged in the US FLC_PHY3 (2003) HARDROC2 SDHCAL RPC 64 ch 20 mm 2 SKIROC2 ECAL Si 64 ch. 65 mm 2 SPIROC2 AHCAL SiPM 36 ch 32 mm 2 G.Martin

23 AIDA Kick Off meeting: WP9.5 FEE WP9.5: electronics readout 1st year: –Characterization of the 2 nd generation ROC chips –Testbench/testbeam measurements Prototyping of the 3 rd generation of ROC chips. Main modifications: –New Slow Control with I2C link For all the ROC chips –New digital part: Independent channels (all chips ?) Read-Out, BCID management New TDC (step=1 ns, no dead time): –For SKIROC3 and SPIROC3 New SCA: –For SPIROC3 and SKIROC3 Circular memory for HARDROC3 ? –Analog part Preamp modifications for SPIROC3 HARDROC2 SDHCAL RPC 64 ch 20 mm 2 SKIROC2 ECAL Si 64 ch. 65 mm 2 SPIROC2 AHCAL SiPM 36 ch 32 mm 2

24 AIDA Kick Off meeting: WP9.5 FEE MILESTONES and SCHEDULE Milestones: Report in 30 months (August 2013) AIDA budget for 3 rd generation of electronics: –78 k (equipment) => 2 chip submissions (Hardroc3 and Spiroc3) –30 ppm Cost: –Multi Project runs (MPW): 1k/mm2 –Packaging: $3500 –Test-board: 1500 Schedule –1 st chip : SPIROC3 Submission March 2012 Reception June year for tests and report –2 nd chip : HARDROC3 Submission March 2013 Reception June year for tests HARDROC2 SDHCAL RPC 64 ch 20 mm 2 SKIROC2 ECAL Si 64 ch. 65 mm 2 SPIROC2 AHCAL SiPM 36 ch 32 mm 2

25 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 TBM E. van der Kraaij

26 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 TBM plans

27 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Meetings The sub-task structure just reflects the more global LC R&D organization, no new structures Projects will be followed in CALICE and FCAL –technical meetings as necessary Expect AIDA annual meetings few months before reports –WP 9.5 parallel session Suggest regular task leader phone meetings to stay in touch –milestone reports

28 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Reporting

29 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Summary Excellent starting point from EUDET Transition ensured Clear project structure Tantalizing visions Lets make it a success!

30 Back-up slides

31 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Budget