LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public.

Slides:



Advertisements
Similar presentations
Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.
Advertisements

Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
Highway Maintenance and Preservation Needs
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
Tracy Lovell, PE A FOCUSED APPROACH TO SAFETY. Provide a Transportation System  Safe  Efficient  Environmentally Sound  Fiscally Responsible.
Paula J. Trigg, County Engineer Public Works and Transportation Committee February 26, CONSTRUCTION PROGRAM PREVIEW.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Steve Varnedoe Condition Assessment & Funding Needs for North Carolina’s Highway System North Carolina Department of Transportation Report to the Joint.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
City of Lake Elmo · New Village Workshop-Focus on Infrastructure· January 20, 2007 PAVEMENT MANAGEMENT REPORT PREPARED: NOVEMBER 16,
1 Paula J. Trigg, County Engineer Public Works and Transportation Committee June 25, 2014 PROGRAM RECAP AND ENDORSEMENT REQUEST PROPOSED HIGHWAY.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 30, 2014 PRESERVATION PROJECTS PROPOSED HIGHWAY IMPROVEMENT PROGRAM.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Paula J. Trigg, County Engineer Public Works and Transportation Committee May 7, 2014 MODERNIZATION PROJECTS EXPANSION PROJECTS PROPOSED HIGHWAY.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
1 Paula J. Trigg, County Engineer Public Works and Transportation Committee June 4, 2014 FUNDING AND REVENUE PROPOSED HIGHWAY IMPROVEMENT PROGRAM.
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 3, 2013.
Walking and Biking the Busiest Roads Around Atlanta: a Bike/Ped Plan that establishes non-motorized transportation among regional-scale priorities Regan.
Washington State Transportation Improvement Board U RBAN F UNDING P ROGRAMS 2012.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
Trail Funding Sources & General Information
Asset Management Cindy VanDyke Office of Planning Georgia Department of Transportation.
2009 ACEC/ODOT CONFERENCE ODOT’S 1R PROGRAM Liz Hunt, P.E. ODOT Pavement Services Engineer.
Paula J. Trigg, County Engineer Public Works and Transportation Committee May 1, 2013.
Condition Assessment & Funding Needs for North Carolina’s Highway System Report to the Joint Legislative Transportation Oversight Committee December 12,
I-90 Snoqualmie Pass East Project Tanya Lamb Urban Geography, GEOG 481 Description 15-mile stretch Hyak (MP 55.1) to Easton (MP 70.3) 2010 scheduled to.
Session 2 Introduction to Pavement Preventive Maintenance Concepts.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 13 (Some of these pictures show bicyclists not wearing.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Southern Bridge Project Brown County Executive
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
Transportation Asset Management PM Peer Exchange Section 3 Overview: Additional Asset Management Classes Connie Sorrell Chief of System Operations.
University of Minnesota Intersection Decision Support Research - Results of Crash Analysis University of Minnesota Intersection Decision Support Research.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
Palm Beach MPO Draft Complete Streets Policy Palm Beach MPO Draft Complete Streets Policy Advisory Committees September
Evaluation and Redesign of Rojeeb Street. Objectives ▪ Evaluation of existing conditions of Rojeeb Street. ▪ Estimation of future conditions of Rojeeb.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
1 Planning Andrea Stevenson. 2 What’s the Big Deal About Ohio’s Transportation System? Ohio is within a single day’s drive (600 miles) of 60% of the United.
Summary of the WILMAPCO Congestion Management Process Prepared for T3 Webinar September 18, 2007.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Presentation to the Washington Transportation Commission March 16, 2010 Washington State Association of County Engineers.
Capital Plan Update FMCB Meeting February 26, 2016 Pre-Decisional – Draft for discussion only.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.
Public Works Infrastructure Update Public Works Department April 5, 2016.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
PUBLIC WORKS DEPARTMENT
Project Management Team Meeting #3
Construction Management & Inspection
Highway 169 Bridge Replacement & Pavement Resurfacing
Contract 60X10 Informational Meeting Weber I-55
Southern Bridge Project Brown County Executive
Walker Street Reconstruction Project 25% Design Public Hearing
Presentation transcript:

LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public Works and Transportation Committee April 29, 2015

Presentation Schedule 2 PWTC 2015 Meeting DatePresentation Topic April 29 Overview and Program Priorities June 3 Funding and Projects / Draft Program Document

Improving transportation a top strategic goal for Lake County and regional partners 3

Efficient Transportation Contributes To:  Quality of life  Environmental value  Economic growth

2015 Construction Program  Continued from 2014  Preservation  Modernization  Expansion

$60M continued from 2014 River Road and Roberts Road: New Roundabout Peterson Road, US 45 to w of IL 83: Add lanes Rollins Road at IL 83: Grade separation Wadsworth Road at IL 131: Reconstruct and widen

$75M in new projects  24 projects, 11 contain non-motorized travel improvements, (bike paths, or adding bike friendly lanes)  Two significant expansion projects:  Peterson Road Corridor  Washington Street Thoroughfare

Communicating with the public  PASSAGE  LCDOT/Lake County website  Facebook  Twitter  LCTV  Public Meetings

Five Year Highway Improvement Program 9 LCDOT’s management philosophy sets system priorities: 1. Preservation 2. Modernization 3. Expansion

Priority One: Preservation 10  Tools in the Toolbox:  ARGUS  ARGUS Pavement Management Software  Asset Inventories  Unit cost information  Industry standards 22% Preservation projects: approximately of program

LCDOT Uses ARGUS Pavement Management System 11 To make cost-effective decisions:  Where repairs are needed  What repair strategies to use  When the repairs should be done Using these program components:  County highway database  Automated pavement testing  Repair strategies with costs  Pavement aging prediction  Optimization program Laser surface testing Dynaflect

Pavement Aging Prediction Costs 12 Repairs Made at the Best Time to Maximize Return

LCDOT ARGUS results 13  Implemented in 1986  Condition rating has improved from 68 to 81  Backlog/failing pavement area reduced from 55% to 8%

Current Pavement Rating is 81(Good) 14 Good (80 – 100) Sections may require crack sealing or a thin overlay. These sections do not require immediate attention. Pavement in this category is generally less than 12 years old. Satisfactory (70-79) Sections may require resurfacing or other rehabilitation in the near future. Pavement is generally years old. Failing (60-69) Will require some type of improvement in the near future to preserve the usability of the surface and avoid the need for reconstruction. This is pavement that is approaching the end of its useable life. Backlog (10-59) May require surface and base course reconstruction to restore roadway serviceability. Some may require total reconstruction, including reconstruction of the subgrade. Pavement in this category is generally more than 15 years old.

Traffic Volumes 15

ARGUS Summary 16 does… Pavement Management System does…  Assess the present condition of the system  Estimate future road conditions  Identify and rank road projects  Maximize the condition of the system within the given budget does not… Pavement Management System does not…  Replace professional judgment  Provide certain detailed project-specific information  Evaluate storm sewer and other roadway assets

ARGUS System Preservation Projects

Keeping Tabs on the System: Asset Inventories 18  Pavement and bike facilities  Guardrail, bridges, railroad crossings  Signals and signs  Drainage and stormwater facilities  Fencing  More…

Pavement: Our most obvious asset lane miles 864 centerline miles 297 miles bike facilities 62 miles paved shoulder 58 average age of roadway 47 average age of surface 12

Lake County’s Bridges Highway Bridges: number of bridges 40 average age 26 average deck age 13 Bike and Pedestrian Bridges: number of bridges 21 average age 24

Culverts 21 Variety of culvert materials: Concrete Corrugated metal pipe (CMP) Composite PVC Culverts are routinely inspected 9.8 miles in LCDOT inventory

By the Numbers Inventory: Non-Pavement Assets 22 16,114 Storm sewer structures 725 Culverts 215 Miles of storm sewer pipe 47 Detention basins 44,642 Feet of fencing 17,785 Feet of retaining wall 22 Miles of guardrail 29 Landscape areas (50 acres) April 2015

Inventory: Signs 23

Priority Two: Modernization 24  Tools in the Toolbox:  Traffic analysis  Level of Service data  Non-motorized policy/2040 bike and pedestrian priorities  Typically intersection and safety improvements, bike and pedestrian accommodations 24% Modernization projects: approximately of program

Bike and Pedestrian Priorities 25 LCDOT existing planned LCFPD existing planned Other jurisdiction existing planned 2040 Non-motorized Plan

Level of Service Data 26  Traffic engineers use LOS data to evaluate how a given intersection is functioning.  Better levels of service mean fewer delays at the intersection  C or better meets driver expectations  LCDOT uses Synchro traffic analysis software to evaluate intersection operations and performance Roundabouts (4 total) Level of ServiceAM Peak HourPM Peak Hour (best)A21 B22 C01 D00 E00 (worst)F00 Signalized intersections (268 total) Level of ServiceAM Peak HourPM Peak Hour (best)A6330 B6654 C7269 D3153 E1424 (worst)F2238

Average Daily Traffic: Then & Now 27

2015 Crash Summary (2013 TCAS data) 28

Historical Perspective: Crash Data 29 5 year averages Number of crashes Fatality8887 Crash with injury Property damage only

Lake County’s Traffic Signal and Fiber Network miles of fiber optic in place 22 miles under construction 10 miles planned 502 County-involved signals

Expanding Computer Aided Dispatch (CAD) Coverage 31 Connected to 17 dispatch centers Adding 3 dispatch centers 93% of the county is covered 5.52% in progress

32 PASSAGE: Asset Inventories ( ) signals 502 miles of fiber optic 268 hubs and switches 313 PTZ cameras 317 HAR towers 5

Priority Three: Expansion 33  Tools in the Toolbox:  2040 plan  State Consensus list  Demographic trends  Traffic data  Typically add lanes or new/extended roads 43% Expansion projects: approximately of program

Keeping up? County-Owned Roads 34 Lane Mile Growth: Growth in Daily Vehicle Miles: ,801, ,691,839

2040 Roadway Priorities  Peak period trips estimated to increase by 36% between 2010 and 2040  212 miles of roadway Improvements recommended  7 interchange  9 intersection  65 corridor

History: Daily Vehicle Miles 36

2040 Roadway Improvements  Consensus projects  2040 projects  Both LCDOT and IDOT projects  LCDOT has projects right now in planning that can’t even be programmed for construction in this 5- year plan because of available funding.  $1.8 billion still needed to fund remaining projects in the Consensus Plan

Presentation Schedule: year Highway Improvement Program 38 PWTC 2015 Meeting DatePresentation Topic April 29 Overview and Program Priorities June 3 Funding and Projects / Draft Program Document