Aug 14, 2009 Regional Planning Group Proposed CREZ Project Modifications Warren Lasher Manager, System Assessment.

Slides:



Advertisements
Similar presentations
Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
Advertisements

October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Jan 22, 2013 RPG Meeting Sharyland Atlas-Driver Load Integration Project – EIR update.
March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Regional Planning Group Project
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Oncor Electric Delivery Company LLC TOGETHER WE DELIVER ODESSA UPDATE Jan 22, 2013 Presentation to ERCOT Regional Planning Group Austin, TX Mike Juricek.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Navarro to Houston Presentation to ERCOT RPG August 27, 2013.
Outage Coordination Overview D.W. Rickerson ERCOT Outage Supervisor 12/1/2008.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
BRAZOS ELECTRIC COOPERATIVE Dobbin 345 Project David Albers, P.E. Manager – System Planning.
Technical Advisory Committee December 6, 2010 Summary of the CREZ Reactive Study Warren Lasher Manager, Long-Term Planning and Policy.
ERCOT PUBLIC 5/20/ RTP July 22, ERCOT PUBLIC 5/20/ Outline  Updates to 2014 RTP  RTP Next steps.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
Route 364 (Page Ave. Extension) The Missouri Department of Transportation.
Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT.
October 12, 2007 ERCOT Regional Planning Group Meeting RPG-CREZ Task Force Status Report Warren Lasher System Assessment.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Managing West Texas Wind SWEDE 2008 Conference May 2, 2008 Presented by Paul Hassink AEPSC Texas Transmission Planning.
Voltage Support Service (VSS) for CREZ Region and baseline Power angle ranges post CREZ Bill Blevins Manager Operations Planning.
CREZ Optimization Studies Scenario 2, Alternative 4: Low Impedance Backbone for Wind Connections Cathey Carter, PE RPG CREZ meeting 12/14/2007.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
West to North CSC Location Scenario 3b WMS August 20, 2008.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
Panhandle CREZs and Transmission Plans SPP 4500/2700 Plan Leverages Existing 69 to 345 kV SPP Infrastructure & Approved Expansion Plans Collects 4,500.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
April 16, 2010 RPG Meeting Lamesa Area Upgrades ERCOT Independent Review Jeff Billo.
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
2010 CSC & Zone Selection: 6 Lines W-N & 4 Zones (WN2_SN0-4Z) Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) August 19,
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
February 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
May 15, 2009 Regional Planning Group CREZ Implementation Study Update Warren Lasher Manager, System Assessment.
3/28/2008 RPG CREZ Meeting CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… Warren Lasher Manager, System Assessment.
Jeff Billo Manager, Transmission Planning
SCENARIO 2 PRESENTATION 345KV ALTERNATIVES ROBERT LONA SENIOR CONSULTANT ERCOT SYSTEM PLANNING 1/25/2008.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Panhandle Renewable Energy Zone (PREZ) Study
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
CREZ Related Generation Interconnection Studies July 2008 Jeff Billo RPG meeting
August 24, 2007 ERCOT Regional Planning Group Meeting CREZ Transmission Optimization Study Warren Lasher System Assessment.
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
October, 2009 Congestion Report Isabel Flores. 2 October, 2009 Background Provide trend of local congestion costs for last 13 months Costs shown in millions.
LINE 69H REBUILD AND CONVERSION PROJECT ERCOT Regional Planning Group April 21,2016.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
R ENEWABLE E NERGY IN T EXAS Jess Totten Public Utility Commission of Texas 1.
2008 Annual Five Year Plan Update 4 For RPG-CREZ Meeting 12/14/2007 Department of Regional Planning Harry Liu.
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
February 17, 2012 Regional Planning Group CREZ Shunt Switching John Adams Principal Engineer.
ONCOR Electric Delivery/ Texas New Mexico Power East Bell County to TNP One 345 kV Line Upgrade Projects Board of Directors July 17, 2007.
2016 RTP Update November, 2016 RPG Meeting.
Barrilla Junction Area Transmission Improvements Project
ERCOT 2009 Five-Year Transmission Plan Update
Entergy Integration Study Update
Warren Lasher Manager, Long-Term Planning and Policy
Presentation transcript:

Aug 14, 2009 Regional Planning Group Proposed CREZ Project Modifications Warren Lasher Manager, System Assessment

2 TSPs have submitted proposed changes to the CREZ plan due to routing and engineering considerations. The following types of changes have been proposed: Conductor Changes Substation Locations Endpoint Changes Other Changes ERCOT is reviewing these proposed changes to determine if they are cost-effective and consistent with the CREZ Plan in the CTO Study. Regional Planning GroupAug 14, 2009 Proposed CREZ Project Modifications

3 Regional Planning GroupAug 14, 2009 Background : Default : Priority In case you have been on sabbatical for the last two years: The CREZ Plan

4 Regional Planning Group Conductor Modifications ETT has proposed using ACSS in place of ACSS/TW and ACSR. CTT has proposed to use ACSS in place of ACSR. Oncor and LCRA have proposed using ACSS/TW in place of ACSS/TW. Lonestar has proposed using ACSS/TW in place of ACSS/TW. Bandera is using ACSR instead of ACSR for the upgrade of the Bandera to Verde Creek circuit. Aug 14, 2009

5 Regional Planning Group Proposed Station Changes TSPs are selecting sites for the new CREZ substations. Many of the new substations will be located near but not directly underneath the blue dots, as the TSPs find suitable locations. Other station changes include: Riley Substation – New station near Oklaunion designed for new CREZ circuits to Tesla, PanOakMid, Bowman, and West Krum, and for the existing circuit to Fisher Road. Two independent connections to Oklaunion. (ETT) Sweetwater East Substation – Instead of connecting circuits from Tonkawas to Central Bluff stations into the Sweetwater Cogen station, build a new station and connect to both circuits from Morgan Creek to Graham (Oncor) Odessa EHV - Construct an extension to the Odessa EHV station for circuits from West C and McCamey A (Oncor) Aug 14, 2009

6 Regional Planning GroupAug 14, 2009 Station Changes

7 Regional Planning Group Proposed Endpoint Changes TSPs have proposed the following CREZ line end point changes: Bluff Creek Substation – Connect only one of the two circuits running from Central Bluff to Brown into this station (ETT) Killeen Substation - Connect both CREZ circuits into Killeen instead of one circuit from Brown to Salado bypassing Killeen. Add a second auto at Killeen. (Oncor) West Wind Substation – Connect the circuit from Gillespie to Kendall to an alternate substation located west of Kendall (LCRA). After ERCOT evaluation, this proposal is not recommended. Aug 14, 2009

8 Regional Planning GroupAug 14, 2009 Proposed Endpoint Changes

9 Regional Planning Group Proposed Endpoint Changes (II) Other CREZ line end point changes: Alternative to rebuild of Abilene S to Leon 138 kV line – Add a 2nd circuit to Abilene E to Putnam 69kV line and convert Putnam to Leon 69 kV line to 138 kV – This proposal has been reviewed and approved as an RPG Project (ETT) Alternative to rebuild of Sonora to Hamilton Road 138 kV line – Rebuild and convert Ft. Lancaster to Hamilton Road 69 kV line to 138 kV (ETT) Alternative to new 138-kV circuit from Mason to Pittsburg - Rebuild the existing Mason to Pittsburg 69-kV circuit as 138-kV ACSR (LCRA) Aug 14, 2009

10 Regional Planning GroupAug 14, 2009 Proposed Endpoint Changes (II)

11 Regional Planning Group Other Changes Other CREZ Plan changes: Bowman to Jacksboro 345-kV line – Existing single-circuit structures were determined insufficient for reconductoring as specified in CTOS/CTP; new double-circuit-capable structures with one circuit of ACSS/TW conductor were proposed (Oncor) Aug 14, 2009

12 Regional Planning GroupAug 14, 2009 Other Changes

13 Regional Planning Group Questions? Aug 14, 2009

14 Regional Planning Group Substation Names Aug 14, 2009 CREZ Report NamePermanent NameCREZ Report NamePermanent Name Panhandle A-ANazarethMcCamey ANorth McCamey Panhandle A-BHerefordMcCamey BTippet Panhandle A-CSilvertonMcCamey CBakersfield Panhandle A-DCottonwoodMcCamey DBig Hill Panhandle B-AWhite Deer(none) Edison Panhandle B-BGrayCentral AScurry County South PanOakMidEdith ClarkeCentral BDermott New OklaunionRileyCentral C(not yet known) SweetwaterSweetwater EastCentral DSand Bluff West ALong DrawCentral EBearkat West BEctor County NorthCentral Bluff West CGrelton

15 Regional Planning Group Line Crossings Aug 14, 2009 The pink dots represent line crossings that could have a market impact; blue dots represent line crossings that could have a customer impact