1 IBL Integration Activities & Future plans  Overall FEA on Geneva (in convergence with Seattle)  News from IST Composite Design  Integration.

Slides:



Advertisements
Similar presentations
Stave#1 and Handling Frame Profile Metrology Survey Maarten, Coralie, Franck, Didier August 3 rd 2011 NB: Survey metrology done by using the UniGe Mitutoyo.
Advertisements

Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.
Saga of the IBL Staves Franck Cadoux on behalf of the ATLAS IBL engineering team (and Eric Vigeolas in particular)
1 IBL Stave & loading tools University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, P. Iacobucci, M. Weber The main goal for today…  Review.
ATLAS Frame PRR 1 W.O. Miller Feb US ATLAS Pixel Detector Global Supports PRR W.O. Miller, R. Smith, W.K. Miller, R. Baer HYTEC G. Gilchriese, E.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
Stave -1 status and other reports Stave Loading Meeting, November 8 th 2011 G. Barbier, F. Cadoux, A. Clark, D. Ferrère, C. Husi, G. Iacobucci, A. La Rosa,
CERN, the 9th of Nov FEA Updates on Structures (overall ID model) University of Geneva: G. Barbier, F. Cadoux, A. Clark, D. Ferrère, M. Weber.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
IBL Loading Activity Overview Franck, Maarten, Coralie, Didier Loading tool workshop University of Geneva, Aug 31 st 2011.
31 août 2011 Didier Laporte – LPNHE Paris 1 IBL Integration Stave Review Université de Genève.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
Training for cAreer deveLopment in high-radiation ENvironment Technologies 1 Work Package 4 New mechanical integration methods November 20 th, 2013 Franck.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
Marc Anduze – 09/09/2008 News on moulds and structures CALICE meeting - Manchester.
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
W.O. Miller i T i VG 1 Example Barrel Structures- Disk Primary FEA of Disk Frame Supports FEA of Disk Frame Supports –Structure 2m long with two end plates.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
ATLAS LBNL Pixel Support Study 1 W.O. Miller HYTEC ATLAS Pixel Detector Support Structure Status and Future Developments February 19, 1999 W. Miller HYTEC.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
Engineering Division 1 Coupled Layer Prototype Update E Anderssen, M Cepeda, M Gilchriese, N Hartman, T Johnson, J Silber, LBNL W Miller Allcomp Inc ATLAS.
L0 and L1 Structure Deflections During Installation of Silicon Sensors C H Daly 8/24/2003.
WG3 Insertion/Extraction Testing Program R. Vuillermet 11/04/20111.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
1 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL Teleconf.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
B-layer integration with beam-pipe and services ATLAS B-layer upgrade E. Anderssen A. Catinaccio.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
W.O. Miller i T i VG 1 Two Pixel Configurations Under Study First: A Monolithic Integrated Structure First: A Monolithic Integrated Structure –Axial array.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Reported by G.Feofilov at the NA61 meeting , CERN, EVO.
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
ATLAS Pixel Detector Pixel Support Tube Interfaces Pixel Support Tube PRR CERN, Geneve E. Anderssen, LBNL.
Loading and QA activities Introduction, Workflow, Tooling, Tasks UniBe – UniGe regular IBL-Upgrade meeting D. Ferrère Aug, 11 th 2011.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
PROTOTYPE January, 27 th 2016 Valery AKHNAZAROV Diego ALVAREZ Christophe BAULT Andrea CATINACCIO Daniel DOBOS Heinz PERNEGGER Danilo GIUGNI Eric VIGEOLAS.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
IBL Progress D. Ferrère for the IBL community LHCC Upgrade Session – June 14 th 2011 Detailed progress was reported at the IBL General meeting, June 8-10.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
1 IST development status  Seattle  Composite Design.
EC: 7 DISK concept Preliminary considerations
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
Progress with System Integration of the CBM Silicon Tracking Detector
Baby-MIND Modules & Services
IBL project for DT Science-Techno Tea
on behalf of the CLIC active pre-alignment team
T2K Upgrade First look at TPC constraints (WAGASCI)
Local Supports for Inclined Layout: CERN Update
T2K Upgrade First look at TPC contraints (WAGASCI Constraints)
Challenges of vacuum chambers with adjustable gap for SC undulators
WP9 ITS Mechanics and Cooling
Antti Onnela CERN – EP – Detector Technologies group
IBL Wire Handling Concepts for Beampipe Support and Adjustment
Rod adaptors for module tests Module positioning studies
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Recent updates to the 2S module geometry Towards first dummy modules
Presentation transcript:

1 IBL Integration Activities & Future plans  Overall FEA on Geneva (in convergence with Seattle)  News from IST Composite Design  Integration jigs and related pieces  2011 schedule Impacts / 2013 Schedule University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M.Weber

2 Overall FEA… Simplified STAVES  CAD model: IST and Beam pipe not shown FE model: IST hidden for clarity…  FE Model: STAVE as shell (sandwich material) The goal is to have comparison with other FE models …as for the Stave program End ring Middle ring Service loads…

3 Overall FEA… Simplified STAVES  Boundary conditions (BC’s) between IBL and PIXEL BC Blocking / 1 end of Beam Pipe… the opposite one is free! Free? Bellows… Inner links between IST and BP IST: 6600mm long, K13C fiber at [0,20,-20,90,90,-20,20,0] 1G

4 Overall FEA… Simplified STAVES  Preliminary results show NO issue / BP sagging and IBL sagging Overall sagging: 350 microns on BP IBL region IBL region…seems very stable! Colin’s FEA (max deflection): 287 microns FEA from Geneva: 350 microns …as a first comparison! No fine tuning between models so far…  Need tests on IST proto for correlations

5 Overall FEA… Correlation works to be done soon!  Tests and FEA’s on a first IST prototype (short sections from Composite Design) IBL region Proto sent to CERN for Mock up (M55J fiber) T300 prepreg Tests LAPP (thanks to Pierre!) on:  T300 proto (0,6mm thick)  M55J proto (0.5mm)  FEA gives: 1.5mm for 30N applied  Test gives: 1.5mm for [25-28N] …about 10% difference! Testing to be done soon to check bending stiffness (on longer proto!)

6 News from IST Composite Design Based on the first mandrel (1m long) …which leads to 870mm long IST first!  Check the surface quality (as seen it’s good… to be measured / Peek pieces)  Check the circularity and dimension (ongoing at CERN metrology)  Comparison between T300 and M55J fibers (done)  Validate the whole process and de molding (quite easy!) The mandrel Prepreg wrapping Before extraction In the autoclave (IST in upright position!)

7 News from IST Composite Design Next steps on IST prototyping work:  Challenge is to go to 2200mm long IST segment (3 segments to get to 6600mm IST)  Needs to work on junctions (including the gluing, centering to guarantee straightness…)  2500mm mandrel to be manufactured (  85mm / h8 precision) + other mold for junctions  Start with one segment…then go step by step (1 junction after the other) Quotation on has been received from Composite Design (order will be placed soon … still need to get a metrology from CERN) junction Working in parallel development with Seattle is necessary (sharing of experience to get to the final results…)  Seattle is dedicated to K13C prepreg for IST and shielding foil lamination on IST (final unit)  Composite Design is a back up solution and provides protos, dummy IST for mock up, and half pipe for Integration stand and Beam pipe container (no VHM fiber here!) Gluing

8 Stave jig Jig schedule in 2011: -1 prototype to test all the steps in 2011 (in aluminum, May 2011) spares to come later (beginning of 2012) Jig schedule in 2011: -1 prototype to test all the steps in 2011 (in aluminum, May 2011) spares to come later (beginning of 2012) Loading tool Integration jigs and related pieces Former design as shown by Didier Latest design according to Stave new design To be interfaced with … Central body: 1300mm 3 fixations over the stave length… to be checked in the wire bonding process Middle point

9 Stave jig Integration jigs and related pieces Pin for location M1.6 or M2 To get access from below Central pin (with clip)

10 Support frame Half pipe as a rotating cradle STAVE driver PRELIMINARY STUDY Main concerns (Integration stand for Integration onto Beam Pipe) Beam pipe Container made of dummy IST’s  Milestone: beginning of 2012 to save time for testing…means 1 year from now (only 6 months for development!)…Gerard will re start in March 2011, BUT it’s tight! A common development with Grenoble has been identified here 7m long is mandatory at this stage

11 Integration activities Summary of 2013 Schedule Target: Early 2012 to start training, tuning,… Beam pipe container Composite design) 1 Validation on Stavelets Early April 2011 to validate the principle and launch a longer jig 2 Going to Stave0 length (Based on official design…no turning back) 4 3 June-July 2011 (to start loading on Stave 0) Could be used and checked for Heater Need earlier! Linked to IST development (April-May 2011) and Grenoble interfaces Stand design and fabrication Stave mounting system May be need of Dummy Bpipe?

12 Last but not least… IBL Support Structure REVIEW coming soon… When ? On March, 24 this year Where CERN Who is involved ? Marzio, Heinz, Giovanni, Raphael, Franck, and the reviewers among: - Ray Veness - Mark Gallilee - Neal Hartman - Eric Anderssen - Antti onnela - Ian Wilmut The goal of the review is to: - Sign off the IBL layout, envelops and interfaces - Confirm interfaces to the beam pipe - Review and go-ahead for support structure elements (IST, support rings,…) - Review of integration and installation tooling concept Still need to define to which level of details do you want us to go…time is short!