Overview and Status of Lead NAAQS Review and Overview of Agency Technical Documents on Lead NAAQS Monitoring Issues Kevin Cavender and Joann Rice Presented.

Slides:



Advertisements
Similar presentations
Agency for Healthcare Research and Quality (AHRQ)
Advertisements

Harmonization of Parts 60 and 75
PM NAAQS Review Update Joseph Paisie Air Quality Strategies & Standards Division, Office of Air Quality Planning & Standards, EPA WESTAR Fall Business.
1 PM NAAQS: Update on Coarse Particle Monitoring and Research Efforts Lydia Wegman, Office of Air Quality Planning & Standards, EPA Presentation at the.
National Air Quality Conference -- Addison, Texas – March 2, Analysis Methods for Lead in TSP and PM 10 ICP-MS ICP-AES/OES ED-XRF.
Topical Aspects on Monitoring Airborne Radioactive Effluents from NPPs Wan-tae KIM.
Although this monitor is owned and operated by the State of Missouri, significant research was conducted with this technology for fence-line monitoring.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Ambient Air Monitoring for the Revised Lead NAAQS Daniel Garver US EPA Region 4.
Florida Pilot Initiative for the Performance Approach to Measurement Systems Stephen Arms Florida Department of Health.
Particulate Matter National Ambient Air Quality Standards Review Process and Status Tom Moore WESTAR Council Meeting September 29, 2010 Portland, OR.
Direct PM 2.5 Emissions Data, Testing, and Monitoring Issues Ron Myers Measurement Policy Group SPPD, OAQPS.
Working together for clean air Approved Regional Method (ARM) Demonstration Puget Sound Clean Air Agency Mike Gilroy, Erik Saganic Puget Sound Clean Air.
AQS Concepts. In This Section We Will Talk About AQS Concepts 2 AQS Background History AQS as part of a monitoring program Types of Information in AQS.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Safeguarding Animal Health 1 Proposed BSE Comprehensive Rule: A New Approach to BSE Rulemaking Dr. Christopher Robinson Assistant Director, NCIE BSE Comprehensive.
1 AQS Ambient Monitoring Topics AQS Conference August 20, 2008 David Lutz.
Ozone Monitoring Issues & Opportunities - II Ozone Transport Commission MANE-VU Fall Meeting November 19, 2014 Crystal City, VA Will Ollison 1220 L Street,
S/W Project Management
Best Practices Related to Research Problem Identification, Scoping, and Programming: A Researcher’s View Martin Pietrucha, Director The Thomas D. Larson.
1 Key Monitoring Issues Status of PM 2.5 monitoring methodologies Criteria for acceptance of monitors and sites Special considerations for comparing ambient.
Monitoring Station Location and Siting Initially on a residential porch at Marina Towers, aligned with the Mirant Potomac River Generating Station (PRGS)
ACCOUNTING INFORMATION SYSTEMS
” Particulates „ Characterisation of Exhaust Particulate Emissions from Road Vehicles Key Action KA2:Sustainable Mobility and Intermodality Task 2.2:Infrastructures.
1 Guest Speaker: Brandy Toft Leech Lake Ojibwe.  Overview of FRM/FEM/ARM status, requirements, and reporting  QC (routine checks, audits, and method-
Timely Policy-Related Monitoring Issues 2013 NACAA Spring Meeting May 6-8, 2013 Richard A. “Chet” Wayland Air Quality Assessment Division U.S. EPA OAQPS.
CAMD PROGRAM UPDATE NACAA/EPA Ambient Air Monitoring Steering Committee Clean Air Markets Division, OAP June
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 7 th DTP Meeting Bern 12 th – 14 th September 2011 Chris Parkin.
 April 7: QA Systems, EPA definitions, PQAOs and common sense – Mike Papp  April 14: Routine Quality Control and Data Management (1-pt QC, flow rate,
Measuring OM/OC on individual IMPROVE Teflon filters using FT-IR analysis Ann M. Dillner, Travis C. Ruthenburg Lake Tahoe IMPROVE Steering Committee Meeting,
1 Saxony-Anhalt EU Twinning RO 04/IB/EN/09 State Environmental Protection Agency Wolfgang GarcheWorkshop European Standards Requirements of.
Proposed Revisions to Ambient Air Monitoring Regulations, and Proposed FY2007 Air Monitoring Guidance WESTAR Spring Business Meeting March 28, 2006.
1 β Attenuation Method PM10/2.5 Automated Dichotomous Monitor SPM-613D β Attenuation Method PM10/2.5 Automated Dichotomous Monitor Model SPM-613D ■SPM.
Sound solutions delivered uncommonly well Understanding the Permitting Impacts of the Proposed Ozone NAAQS Pine Mountain, GA ♦ August 20, 2015 Courtney.
CARB Continuous PM 2.5 Monitoring Activity (BAM’s) Reggie Smith California Air Resources Board.
1 New NAAQS Review Process Briefing for EPA Staff Kevin Teichman, ORD and Lydia Wegman, OAQPS April 5, 2007.
Overview and Status of Lead NAAQS Review and Overview of Agency Technical Documents on Lead NAAQS Monitoring Issues Kevin Cavender and Joann Rice Presented.
Development of 24-Hour 2006 PM 2.5 Designations Guidance NTAA National Tribal Air Quality Forum Barbara Driscoll EPA, OAQPS April 17, 2007.
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
Market research for a start-up. LEARNING OUTCOMES By the end of this lesson I will be able to: –Define and explain market research –Distinguish between.
Greenhouse Gas (GHG) Permit Training Other Aspects of PSD Title V Permitting.
Designations for 24-Hour PM2.5 NAAQS: Overview and Guidance Amy Vasu PM2.5 Workshop June 20-21, 2007.
OAR Perspective on Air Sensors Kristen Benedict National Tribal Forum on Air Quality 5/13/14.
COMPARABILITY PROTOCOLUPDATE ADVISORY COMMITTEE FOR PHARMACEUTICAL SCIENCE Manufacturing Subcommittee July 20-21, 2004 Stephen Moore, Ph.D. Chemistry Team.
Federal Equivalent Methods and Federal Reference Methods Tim Hanley U.S. EPA OAQPS.
CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.
Highlights of June 2008 NACAA Ambient Air Monitoring Steering Committee Meeting Westar Fall Business Meeting Seattle, WA October 2, 2008.
NATIONAL TRIBAL FORUM ON AIR QUALITY 2013 Establishment of a PM 2.5 Monitoring Network on the Colville Reservation.
Exceptional Events and Fire Policy Presented by Don Hodge, U.S. EPA Region 9 Interagency Air and Smoke Council meeting May 2, 2012 Disclaimer: Positions.
PM 2.5 Continuous FEMs; Update and Assessments For NESCAUM Monitoring Meeting April 29, 2011 Tim Hanley – US EPA, OAQPS 1.
PM Methods Update and Network Design Presentation for WESTAR San Diego, CA September 2005 Peter Tsirigotis Director Emissions, Monitoring, and Analysis.
Module 11 Module I: Terminology— Data Quality Indicators (DQIs) Melinda Ronca-Battista ITEP Catherine Brown U.S. EPA.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
Melinda Beaver 1, Keith Kronmiller 2, Rachelle Duvall 1, Surender Kaushik 1, Timothy Morphy 3, Patrick King 3, and Russell Long 1 1 US EPA Office of Research.
Implementation of Exceptional and Natural Events Policies and Rules in Arizona Ira Domsky, Deputy Director February 25, 2009.
Review of Federal Reference Method for Ozone: Nitric Oxide-Chemiluminescence Office of Research and Development National Exposure Research Laboratory April.
Ozone and Lead Monitoring Issues Under Revised NAAQS Monitoring Steering Committee June 21-22, 2007 Washington, DC Phil Lorang, OAQPS.
Annual Air Monitoring Data Certification and Concurrence Process 1.
ADEQUACY OF EXISTING AEROSOL SAMPLERS FOR MONITORING NORM EXPOSURES European ALARA Network 9th Workshop on Occupational Exposure to Natural Radiation.
RESPIRABLE DUST SAMPLERS DEFINITIONS, CRITERIA, AND OPTIONS
EPA Region 10 Alternate Test Procedures and Method Update Rule
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans
Proposed Ozone Monitoring Revisions Ozone Season and Methods
PMcoarse , Monitoring Budgets, and AQI
Designations for Indian Country
Exceptional and Natural Events Rulemaking
TCEQ AMBIENT Air Monitors in Corpus christi
A New Tool for Evaluating Candidate PM FEM and PM2.5 ARM Monitors
A Review of Time Integrated PM2.5 Monitoring Data in the United States
Status of the PM NAAQS Review
Presentation transcript:

Overview and Status of Lead NAAQS Review and Overview of Agency Technical Documents on Lead NAAQS Monitoring Issues Kevin Cavender and Joann Rice Presented at Clean Air Scientific Advisory Committee’s Ambient Air Monitoring and Methods Subcommittee Public Teleconference July 14, 2008

2 Outline Status of lead NAAQS review Proposed Federal Reference Method (FRM) for Pb-PM 10 Options for the development of a low- volume Pb-TSP sampler

3 Status of Pb NAAQS Review Proposed rule signed May 1, 2008 Comment period closes August 4, 2008 Final rule due to be signed October 15, 2008

4 Proposed Pb-PM 10 FRM

5 Background on current FRM for Pb-TSP Existing FRM based on high-volume TSP sampler with atomic absorption (AA) analysis. 21 existing FEM all based on high-volume TSP sampler with various analysis options CASAC and others have expressed concerns with TSP sampler –“Cut point” is affected by wind speed and direction

6 Draft Federal Reference Method (FRM) for Pb-PM 10 Sampling and analysis method considerations for the proposed FRM for Pb-PM 10 Sampling considerations –Recently promulgated low-volume (16.7 L/min) PM 10c sampler with 46.2-mm PTFE filters from PM FRM –Advantages: More demanding performance criteria of Appendix L (PM 2.5 FRM) with sampling at local conditions Sequential sampling capability to meet increase sampling frequency if needed Affords network efficiencies and consistencies with other PM monitoring networks with low-volume samplers Consistent with QA requirements for PM 2.5 and PM

7 Analysis Method Considerations –X-Ray Fluorescence (XRF) –Advantages: No complicated sample preparation or extraction prior to analysis Non-destructive Relatively cost effective Relatively low method detection limits (MDLs) –On the order of ~0.001 µg/m3 for low-volume collection Also used in other PM speciation monitoring programs (e.g., CSN and IMPROVE) Draft Federal Reference Method (FRM) for Pb-PM 10

8 FRM Charge Questions What are your comments on the use of the low-volume PM 10 c FRM sampler as the Pb-PM 10 FRM sampler ? What are your comments on the use of XRF as the Pb- PM 10 FRM analysis method? What are your comments on the specific analysis details of the XRF method contained in the proposed Pb-PM 10 FRM analysis method description? Do you think the XRF method precision, bias and MDL for the proposed Pb range will be adequate? Are there any method interferences that we have not considered?

9 Options for the Development of a Low-volume Pb-TSP Sampler

10 Overview of a Potential Low-Volume Pb-TSP Sampler A low-volume Pb-TSP sampler would consist of two parts – the inlet and the air sampler. –The air sampler could be based on the low- volume air samplers used in the PM2.5 and PM10 networks. –A particular inlet design (either existing or new) would need to be specified.

11 Low-Volume Pb-TSP Inlet Considerations A number of vendors offer what they refer to as a “low-volume TSP inlet” –In many cases, these low-volume TSP inlets are a low-volume inlet with the PM10 impactor removed. –An inlet of this design has many potential benefits – the PM10 FRM inlet is commercially available, PM10 FRM inlet designs are uniform, the PM10 FRM inlet design is already promulgated. –None of the samplers which use this inlet have currently been approved as a TSP FRM or FEM. Although the overall effectiveness of the PM10 FRM’s inlet (including its internal PM 10 fractionator) has been well-characterized, the aspiration characteristics of the inlet itself have not been well-characterized –The omni-directional inlet design would eliminate variability in sampling efficiency due to wind direction. –For larger particles (> PM 10 ), the sampling efficiency would vary with particulate size due to windspeed-dependent aspiration characteristics and internal particle losses through the sampler. –Limited information at low wind speeds is available in the literature (Lee Kenny et. al., JEM 2005)

12 Plot of High Volume Sampler Efficiency vs. Wind Direction Data from - Wedding, et. al., (1977)

13 Plot of Sampler Efficiency vs. Wind Speed 1.High volume data from - McFarland, et.al, (1979) 2.Low volume (louvered inlet) data from – Kenny, et. al., (2005)

14 Overview of a Potential Low-Volume Pb-TSP Sampler Advantages of a low-volume Pb-TSP sampler over a conventional high-volume Pb-TSP sampler include: –No variability in sampling efficiency due to wind direction –Improved flow control –Improved precision and bias –Sequential sampling capabilities –Reduced footprint requirement –Reduced noise –Network efficiencies with other low-volume PM samplers (i.e., PM2.5 and PM10 networks) –No metal interferences for other metals (e.g., copper) from brushes on motors

15 Potential Approaches for Development Two approaches could potentially be used to develop a low-volume Pb-TSP sampler –Develop a new Pb-TSP FRM –Test and approve a new Pb-TSP FEM

16 FRM Approach One option for the development of a low-volume TSP sampler is to describe in detail and formally promulgate a new FRM for TSP sampling based on the modern low-volume sampler platform, and then designate. –Many of the FRM specifications from the PM10 FRM could be referenced –Geometric specifications for a TSP inlet design would need to be selected from designs currently available or newly developed –Available commercial products that met the promulgated description could be designated as FRMs

17 FRM Approach (continued) Ideally, the sampler capture efficiencies over a wide particulate size distribution would be understood prior to promulgation as an FRM. –Due to difficulties in generating and transporting the large diameter particles required for wind tunnel evaluation of a TSP sampler, it may not be feasible to develop the data necessary to determine sampler capture efficiencies for ultra-coarse particulate matter. –It would be especially difficult to develop the necessary data under the short timeline of the Pb NAAQS Review. Rather than waiting to develop the sampler capture efficiency data prior to promulgation of a low volume TSP FRM, the EPA could promulgate the new FRM without a full characterization of the sampler capture efficiency

18 FRM Approach (continued) Advantages of this approach include: –Faster low-volume TSP sampler development and approval –No need to “match” old high-volume TSP FRM performance –No wind-tunnel or field test data needed Issues with this approach include: –Performance of new FRM could be worse than current FRM –Difficulties in relating historic Pb-TSP data to new data

19 FEM Approach The second option for development of a low volume Pb-TSP sampler is to allow alternative inlet and sampler designs to be accepted as FEM Pb methods. –Currently, the Pb FEM requirements do not specify if different sampler and inlet designs can be designated as FEM [53.33(d) seems to indicate that alternative samplers could be approved as FEM] –The EPA has historically only approved Pb-TSP methods based on alternative analysis methods –The EPA requested comments on the appropriateness of allowing alternative Pb-TSP sampler designs based on the Pb FEM requirements Under this approach, collocated field testing of the low volume Pb- TSP sampler versus the current Pb-TSP FRM would be conducted. If the two sampler’s readings matched within some acceptable level, the EPA would accept the low volume Pb-TSP sampler as part of a FEM Pb method.

20 FEM Approach (continued) The current Pb FEM requirements (40 CFR 53.33) call for field testing –One or more site –10 or more filter pairs per site (5 valid pairs) –Samplers orientated to minimize wind-direction differences –Each filter is analyzed three times –Precision of replicate analyses required to be 15% or less –Comparability for each filter pair (FEM vs. FRM) must be 20% or less

21 FEM Approach (continued) Advantages of this approach include: –Fast FEM development and approval –No need to perform wind tunnel testing to characterize sampler capture efficiency –Some assurance of consistency with historic Pb-TSP data Issues with this approach include: –Requires field testing by vendors or other sponsors (e.g., the EPA, monitoring agencies) –Low-volume Pb-TSP samplers may not “match” high- volume Pb-TSP samplers well enough to pass FEM requirements, especially considering the variability of the high-volume FRM

22 Low Volume Pb-TSP Charge Questions Would a low-volume Pb-TSP sampler be an improvement over the existing high-volume Pb-TSP sampler? What advantages and disadvantages do you see associated with a low-volume Pb-TSP sampler? What inlet designs would be best suited for a low volume Pb-TSP sampler? What designs are not appropriate for a low-volume Pb-TSP sampler? What is your preferred approach for the development of a low-volume Pb- TSP sampler, and why? If the EPA were to develop a low-volume Pb-TSP FRM, how important is it that the sampling capture efficiency be characterized for varying particle sizes? If the EPA were to develop a low-volume Pb-TSP FRM, should the new FRM replace the existing high-volume Pb-TSP FRM, or should the EPA maintain the existing FRM? Is it appropriate to accept alternative sampler and inlet designs as FEM? Are the proposed FEM testing criteria for Pb methods adequate to ensure equivalence of alternative sampler and inlet designs? If not, what additional testing requirements should be considered?

23 References Kenny, G; Beaumont, G; Gudmundsson, A; Thorpe, A; Koch (2005) Aspiration and sampling efficiencies of the TSP and louvered particulate matter inlets. J. Environ. Monitoring 7: McFarland, A.R.; Ortiz, C.A.; and Rodes, C.E. Characteristics of aerosol samplers used in ambient air monitoring. Presented at 86 th National Meeting of American Institue of Chemical Engineers (1979). Wedding, J.B.; McFarland, A.R.; and Cermak, J.E. (1977). Large particle collection characteristics of ambient aerosol samplers. Environ. Sci. Technol., 11(4):