1 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Plans F. Willeke 9 th ASAC Meeting for NSLS-II Project February 1-2, 2012.

Slides:



Advertisements
Similar presentations
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Advertisements

Control and IT Systems status and strategy ALBA, Piotr Goryl on behalf of Michał Ostoja-Gajewski, Krzysztof Wawrzyniak, Łukasz Żytniak, Tadeusz.
Paul Chu FRIB Controls Group Leader (Acting) Service-Oriented Architecture for High-level Applications.
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
ILCDR/CesrTA meeting Low Emittance Tuning 報告 K.Kubo.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Injection System with a Booster in Separate Tunnel T. Shaftan for the NSLS-II team.
Current Status of MATLAB-based Accelerator Physics Application Programs for the TPS Commissioning and Operation at NSRRC Fan-Hsin Tseng ( 曾繁信 ) Beam Dynamics.
Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
BBA Related Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
FFAG Workshopfermilab April 2005 f Summary: FFAG WORKSHOP nonscaling electron model muon FFAGs C. Johnstone Fermilab.
Diane Fairley High Level October High Level Applications FAC Review October 12, 2006 High Level Applications.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Accelerator Installation Plan Gregory Fries Project Engineer, Accelerator Systems Division CFAC Review of NSLS-II.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
1 BROOKHAVEN SCIENCE ASSOCIATES The Path to Accelerator Commissioning F. Willeke Accelerator Systems Director NSLS-II PAC Meeting December 10-11, 2009.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
Accelerator Commissioning
Data management in the field Ari Haukijärvi 2nd EHES training seminar.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
BROOKHAVEN SCIENCE ASSOCIATES High level applications and EPICS control GUOBAO SHEN NSLS-II, Control Group May 4 th, 2009.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
BROOKHAVEN SCIENCE ASSOCIATES 0 Top-Off Safety Yongjun Li ASAC Meeting October 22, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
The Commissioning of the CLAS12 Detector V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 workshop, June 21 st 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES Installation & Integrated Testing Status & Plans Gregory Fries, ASD Project Engineer 9 th ASAC meeting for NSLS-II Project.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
1 BROOKHAVEN SCIENCE ASSOCIATES High Level Applications Infrastructure and Current Status Guobao Shen, Lingyun Yang* Controls Group & Accelerator Physics.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
1 BROOKHAVEN SCIENCE ASSOCIATES Injector Status Timur Shaftan, Injector Group Leader 9 th ASAC meeting for NSLS-II Project February 1-2, 2012.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Projects, Tools and Engineering Patricia McBride Computing Division Fermilab March 17, 2004.
O. Kester, NuSTAR annual meeting, 27/02/2013
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
LCLS Commissioning & Operations High Level Software
Overview of CLAS12 Calibration
LCLS Commissioning & Operations High Level Software
Beam-Based Alignment Results
Advanced Research Electron Accelerator Laboratory
High Level applications development status
Linac Diagnostics Commissioning Experience
ThomX – Commissioning Meeting – 25/01/2018
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Plans F. Willeke 9 th ASAC Meeting for NSLS-II Project February 1-2, 2012

2 BROOKHAVEN SCIENCE ASSOCIATES Outline Status of Preparations for LINAC Commissioning Status of Booster Commissioning Preparations Preparations for Storage Ring Commissioning Commissioning Database High Level Application Development for Commissioning Commissioning Retreat Summary

3 BROOKHAVEN SCIENCE ASSOCIATES Timeline LINAC Commissioning: April’12 - June ‘12 (BL: Sep ‘12) Booster Commissioning: Feb’13 - June ‘13 (BL: July ‘13) Storage Ring Commissioning without ID: June’13 - Nov ‘13 (BL: Nov ‘13) Storage Ring Commissioning with ID: Feb ’14 - April ‘14 (BL: Feb ‘14)

4 BROOKHAVEN SCIENCE ASSOCIATES Procedure LINAC Booster

5 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Commissioning and Operation Authorization Storage Ring Booster LINAC

6 BROOKHAVEN SCIENCE ASSOCIATES Status of Preparations for LINAC Commissioning LINAC installation nearly complete Component Testing in Progress Modulators have been tested successfully Instrument Readiness Review Committee (internal) appointed (chaired by R. Heese) which is certifying technical readiness ARR committee appointed ARR Date fixed (27-29 Febr. 2012)

7 BROOKHAVEN SCIENCE ASSOCIATES Status of Documentation for LINAC Commissioning LINAC Commissioning Authorization Base approved by BSHO in May Last missing requirement is the technical and organizational readiness certified by a successful Accelerator Readiness Review (ARR). The LINAC ARR schedule for February Most of the Documentation which forms the Authorization Base in place or is being circulated for final signatures

8 BROOKHAVEN SCIENCE ASSOCIATES Status of Documentation for LINAC Commissioning

9 BROOKHAVEN SCIENCE ASSOCIATES LINAC Commissioning Sequence Excerpt from LINAC Commissioning Plan

10 BROOKHAVEN SCIENCE ASSOCIATES LINAC Commissioning Sequence

11 BROOKHAVEN SCIENCE ASSOCIATES LINAC Commissioning Sequence

12 BROOKHAVEN SCIENCE ASSOCIATES LINAC Commissioning RI is responsible for LINAC commissioning and demonstrating the specified performance Commissioning safety is in the responsibility of Photon Sciences. NSLS-II scientist will always be present during commissioning A trainee from the Operations Group will attend LINAC commissioning Shifts to assure a smooth transition from commissioning to operations LINAC commissioning will be performed form the injector control room in the injector service building A token systems is being prepared which allows to handover the LINAC operations to the NSLS control room for routing operations such as vacuum and RF conditioning. This token will make sure that there is always only one well defined control center which carries the responsibility for operational safety.

13 BROOKHAVEN SCIENCE ASSOCIATES After in the tunnel checkout has been done, and once beam is available in the linac, the following beam-based checkout will be done. This list assumes that all magnets have had their fields fully standardized, a reasonable quality electron beam is available from the injector, some rough beam steering and linac RF phasing has been accomplished, and any beam obstruction issues have been solved. Generate betatron oscillations in each plane, using well calibrated steering coils, to verify BPM polarities, local focusing optics, and possible BPM scaling errors. Using well-calibrated steering coils, verify the scaling of all profile monitors (OTR, YAG), by verifying the proper induced centroid shifts in each plane. Repeat above, but for BPMs and profile monitors at high dispersion points (e.g., energy slit, VF2), using reasonably well known RF phase or amplitude changes. BPM and other charge readings (such as ICT, FCT and Faraday cup) should be uniformly calibrated based on a well known reference. After the checkout, the electron beam measurements and corrections can be done in the transport line. Preparation for LTB commissioning

14 BROOKHAVEN SCIENCE ASSOCIATES LTB operation panel

15 BROOKHAVEN SCIENCE ASSOCIATES PS

16 BROOKHAVEN SCIENCE ASSOCIATES Preparation of Booster Commissioning The lab safety committee has approved the Booster SAD and ASE. Build-up of the Booster Commissioning Authorization Base is progress.

17 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Control Room * Control room: top view Located in the NSLS-II injector service building. Is close to injector, RF, and computer room hardware. Will be used for LINAC, Booster, Transferline and initial storage ring commissioning

18 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Staff LINAC Commissioning Coordinator : Ray Fliller, Commissioning staff: RI personnel, members of the RF group; members of the operations group Transfer-line Commissioning : Prepared by Gui-Mei Wang Booster Commissioning Coordinator : Timur Shaftan Commissioning staff: BINP personnel, members of the accelerator physics group; members of the operations group Storage Ring Commissioning Coordinator : Sam Krinsky

19 BROOKHAVEN SCIENCE ASSOCIATES High Level Applications for Commissioning High level component data management and control : 100% finished (it includes the mapping from lattice-element-name-based control to low level EPICS channel access, element/family/lattice read, write and save)  quick prototyping of controls and specific applications for problem solving Linear lattice measurement package : (lattice function measurement and correction, orbit response matrix measurement, beam based alignment, orbit correction, local c.o. bump) 90% finished Diagnostics display and analysis package On-line Lattice modeling : (Python binding of the Tracy code; useable as online or offline simulator; includes Linear Optics matching; 70% complete Other tools specific for commissioning are in progress. Documentation for all HLA libraries are 70% finished/published. Including training tutorial and examples. Accelerator Physics Taskforce on High Level Applications in place and very active to provide in close collaboration with the controls group software for commissioning:

20 BROOKHAVEN SCIENCE ASSOCIATES Software Repository A website has been created with info, tutorials, Software depository access

21 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Data Base - First Pass of evaluation which data to make available for database completed - Switched to a more pragmatic approach to make sure all relevant data are available for commissioning - Tools have been created and implemented to import various information stored in convenient format (MS-excel, text, ) into the IRMIS Database - IRMIS Data-base is being populated with data relevant for commissioning: Lattice data, survey data, magnet calibration data, multipole data, magnet-girder alignment data

22 BROOKHAVEN SCIENCE ASSOCIATES Process Data Collection for Commissioning and Analysis

23 BROOKHAVEN SCIENCE ASSOCIATES Summary LINAC commissioning preparations is nearing completions, commissioning expected top start in March’12 Transfer line commissioning well prepared and commissioning tools in place Booster Authorization base was supported by lab safety committee and approved by BSHO Storage ring commissioning preparations continue, commissioning document being updated, ASE and SAD documents under development, capturing of relevant data in IRMIS database in progress, commissioning software being implemented and tested.