John Davies. FP7 Planning Meeting, UKATC June 2006. OPTICON FP7 Networking Plans John Davies OPTICON Project Scientist.

Slides:



Advertisements
Similar presentations
Science and Policy Integration for COastal Systems Assessment
Advertisements

FORESTUR: “Tailored training for professionals in the rural tourist sector” ES/06/B/F/PP VALORISATION & SUSTAINIBILITY PLAN Budapest, June 2007.
1-1 PRESENTER The Role of the Framework 7 Advisor Your Name Your Websites Websites
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
OPTICON Board Meeting, Porto, OPTICON WP4 Interferometry Status Report D. Mourard presented by A. Chelli.
0 THE NETWORK OF ULTRAVIOLET ASTROPHYSICS Inform for the MTR Review to be held in Corfu (September 2007, 10-11) Prepared by: Prof. Ana Inés Gómez de Castro.
1 23/05/2015 Networking Research Infrastructure NCPs National Hellenic Research Foundation (EKT/NHRF) Project Monitoring & Coordination Unit EuroRIs-NET.
FP6 Thematic Priority 2: Information Society Technologies Dr. Neil T. M. Hamilton Executive Director.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together all of Western Europe's owners and operators of large observatories and data.
NA5: Interferometry Forum Andreas Quirrenbach (U Leiden / U Heidelberg)
EGEE is a project funded by the European Union under contract IST NA2 Dissemination John DYER Activity Leader All Activity Meeting, CERN 18.
OPTICON Board Meeting, Grenoble October Project Scientist Report John Davies UK Royal Observatory Edinburgh.
Emilios Harlaftis, National Observatory of Athens OPTICAL AND IR Coordination Network An EU Infrastructure Cooperation Network (FP5) with the aim to bring.
CHIPP Workshop on Detector R&D June - University of Geneva Common R&D for astroparticle physics: Activities of ApPEC and ASPERA Bernard Revaz and.
1 ASTRONET PROGRAM STATUS as of Preliminary Board 1 st Meeting Paris, 31 May 2005.
CULTURe EXchange Platform (CULTUR-EXP) Project Overview Prof. Ramaz Kvatadze Georgian Research and Educational Networking Association – GRENA
1 INFRA : INFRA : Scientific Information Repository supporting FP7 “The views expressed in this presentation are those of the author.
OPTICON The Optical Infrared Co-ordination Network for Astronomy. Overview and Status Report. John Davies OPTICON Project Scientist. UK Astronomy Technology.
EGIDA PROJECT 1stJoint Workshop of the EGIDA Stakeholder Network and Advisory Board Connecting GEOSS and its Stakeholders in Science.
InWEnt | Qualified to shape the future1 Internet based Human Resource Development Management Platform Human Resource Development Programme in Natural Disaster.
High-Level Organization ALMA Board AUI NRAO North American ARC Manager North American ALMA Regional Centre AMACASAC Joint ALMA Observatory ALMA Director.
Opticon Porto 1 High Time Resolution Astrophysics Network Andy Shearer Centre for Astronomy School of Physics, NUI, Galway Ireland.
Summary of distributed tools of potential use for JRA3 Dugan Witherick HPC Programmer for the Miracle Consortium University College.
Results of the HPC in Europe Taskforce (HET) e-IRG Workshop Kimmo Koski CSC – The Finnish IT Center for Science April 19 th, 2007.
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
OPTICON is funded by the European Commission under Contract no RII3-CT Site Characterization of the Canarian Observatories: Different activities.
Key Technologies Network Colin Cunningham. 11th Oct 2004 OPTICON Key Technologies Network Grenoble2 Objectives WP5.1: Workshops & Roadmapping: WP5.1:
NUVA Mission NUVA will map and review the instrumental performance of existing and near future capabilities in the UV on a global scale. It will assess.
M. Dennefeld, Corfu, Sept « Enhancement » activity in N6.3 Definition: « Enhancing the efficiency of research » Concerns researchers having a degree.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
GEO Work Plan Symposium 2012 ID-03: Science and Technology in GEOSS ID-03-C1: Engaging the Science and Technology (S&T) Community in GEOSS Implementation.
INFSO-RI Enabling Grids for E-sciencE EGEE and Industry Bob Jones EGEE-II Project Director Final EGEE Review CERN, May 2006.
IMPACT is supported by the European Community under the FP7 ICT Work Programme. The project is coordinated by the National Library of the Netherlands.
ASTRONET Coordinating Strategic Planning for European Astronomy T HE N ETWORKING.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
WP8 – Innovation Support Kelly Vavasi General Secretariat for Research and Technology (GSRT) 1 st Innovation Dialogue Forum Becici, 8-9 November 2010.
Status and achievements of Opticon FP6 (+FP5) Gerry Gilmore coordinator.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together many of Europe's astronomical observatories, data centres and laboratories.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
1 Direction scientifique Networks of Excellence objectives  Reinforce or strengthen scientific and technological excellence on a given research topic.
The Virtual Observatory Europe and the VO: the Astrophysical Virtual Observatory and the EURO-VO Astrophysical Virtual Observatory and the EURO-VO Paolo.
Philip Diamond RadioNet Coordinator University of Manchester Jodrell Bank Observatory Overall Objectives MTR: 12 April 2007 Grenoble.
1 ASTRONET Coordinating strategic planning for European Astronomy.
ELOGMAR-M Review Meeting, Shenzhen, 31/03/ First Review Meeting - Web-based and Mobile Solutions for Collaborative Work Environment with Logistics.
Network 3.6 Future Astronomical Software Environments for data analysis and processing Preben Grosbøl, ESO (Chair)‏ OPTICON Mid-Term Review meeting Corfu,
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 – Dissemination, Exploitation Strategy and Standardization Inova+ Co-Living.
WP2 – Strategy, co-operation and dissemination EuroVO-AIDA – First periodic review – 24 April 2009 Françoise Genova, Project Coordinator WP2 – NA2 Strategy,
End-User Development Empowering people to flexibly employ advanced information and communication technology September 2002 Pisa (I)
Overview and status of the project EuroVO-AIDA – Final review – 5 October 2010 Françoise Genova, Project Coordinator, 1 Overview and status of the project.
Bureau for International Research and Technology Cooperation Herlitschka 1 Warsaw FP6 Launch Conference - 26 Nov Small and Medium Enterprises -
EGEE JRU Workshop, Brussels, December 1 st, JRU RoGrid – Romanian Experience RoGrid Consortium RoGrid JRU set-up RoGrid JRU Implementation Internal.
Introduction to the VO ESAVO ESA/ESAC – Madrid, Spain.
The Role of an Access Programme: Lessons for FP7 Birgitta Nordström Niels Bohr Institute, Copenhagen University Denmark.
LHC Computing, SPC-FC-CC-C; H F Hoffmann1 CERN/2379/Rev: Proposal for building the LHC computing environment at CERN (Phase 1) Goals of Phase.
This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under.
Pre-Workshop on Intervention of Science and Technology in Traditional Crafts Date : 14 th Dec Venue : Seminar Hall, First Floor of S & H Building.
COST Action and European GBIF Nodes Anne-Sophie Archambeau.
CARPE DIEM 2 nd meeting Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches for Environmental.
Exploitation means to use and benefit from something. For Erasmus+ this means maximising the potential of the funded activities, so that the results are.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
Kick Off Meeting Largs, Scotland
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
DCA WP3 Report Support to take-up and implementation of the VObs framework Christophe Arviset (ESA-VO) Paolo Padovani (ESO) Christophe Arviset (ESA),
AMICI WP1 – Management, coordination and dissemination
ASTRONET Coordinating strategic planning for European Astronomy
Observatory Science Operations
OPTICON The Optical Infrared Co-ordination Network for Astronomy.
Maria Teresa Capria December 15, 2009 Paris – VOPlaneto 2009
Presentation transcript:

John Davies. FP7 Planning Meeting, UKATC June OPTICON FP7 Networking Plans John Davies OPTICON Project Scientist

John Davies. FP7 Planning Meeting, UKATC June FP6 Networking Proposal. 39,160 Keuro 11 Networks. Euro 6,680K (17%) Contract. 19,200 Keuro 6 Networks. Euro 3,718 (19%)

John Davies. FP7 Planning Meeting, UKATC June Management Clearly needed. Distributed model works. Impossible to define until. shape/size/membership of consortium is clearer Assume FP6 cost *1.25 = 1,500Keuro

John Davies. FP7 Planning Meeting, UKATC June ELT Network FP7 Deliverables –Updated Science case documents (2 over FP7 period) –Science simulations in each key science area –Regular, small, focussed meetings (~4 per year) –1 major community science meeting per year

John Davies. FP7 Planning Meeting, UKATC June ELT FP7 Network Resources Effort –4 People working full-time on ELT science case IMH (lead) + 3 postdoc-level scientists Distributed around Europe Coordinated with other FP7 activity (e.g. AO or instrumentation) Costs per year –FTE: ~ 200kE –Meetings: 25kE + (4 x 10kE) = 65kE –Publication of documents: 20kE (e.g. 2 x 50kE over 5 yrs) –Total per year: ~ 285 kE (~1,500 Keuro over FP7)

John Davies. FP7 Planning Meeting, UKATC June NUVA (UV-Net) FP6 Progress Roadmap in good shape and on-schedule: -“ Fundamental problems in astrophysics. Requirements for UV observatories”, Kluwer-Springer, in press. -Joint Discussion during the IAU GA on the impact of stellar (UV) astronomy on cosmological studies and on the understanding of how life-sustainable systems are generated. -Conference in “El Escorial”, May 2007 to analyze the instrumentation required to achieve some fundamental goals of modern astronomy.

John Davies. FP7 Planning Meeting, UKATC June NUVA FP7 objectives Identification of the key technologies for future UV instrumentation. Identification of key VO compliant tools for the analysis and interpretation of UV data in connection with other spectral domains. Keeping the UV community connected Europe-wide until the end of the HST mission and in the advent of WSO/UV mission.

John Davies. FP7 Planning Meeting, UKATC June NUVA FP7 deliverables 1.Assessment study of the relevant new technologies (gratings, narrow band filters, high sensitivity spectral-imaging techniques, integral field spectroscopy, spectropolarimetry). 2.VO tools to analyze UV data and integrate them within the high redshift UV Universe targeted by the 10-m and ELT telescopes (e.g. characteristic structure scales in matter beams from z=0 to z=6-9).

John Davies. FP7 Planning Meeting, UKATC June NUVA FP7 Budget & Participants Meetings 120 keuro Publications40keuro Trips & Conferences40keuro GRAND TOTAL 200 keuro PARTICIPANTS: PI and budget at UCM (Madrid) otherwise as in FP6

John Davies. FP7 Planning Meeting, UKATC June HTRA FP7 Network Costs, PI’s & Participants Estimated costs of ~ €192K for 4 to 5 year project Networks PI’s –Don Phelan & Andrew Shearer Key Participants –HTRA JRA –wider HTRA community including non-EU members

John Davies. FP7 Planning Meeting, UKATC June Key Technology Network, FP6 Progress Core team –13 Members, including JRA chairs –3 Meetings held Associate team formed – 26 members Communications via & Twiki web pages Workshops on –Optics for ELT Instruments in Rome – published in Astron. Nach. –Deformable Mirrors & WHT test-bed in Paris –Use of WHT as technology test-bed at ESO Plenary talk at SPIE 2006 in Orlando on Novel Technology for Optical & IR Astronomy Draft Roadmap produced

John Davies. FP7 Planning Meeting, UKATC June KTN: Objectives for FP7 Act as focus for Optical and IR Technology development planning Use themes or JRAs to feed information in –JRAs develop their theme networks Filter this information and form linkages for added–value R&D Develop industry links and links to European space and worldwide R&D programmes

John Davies. FP7 Planning Meeting, UKATC June KTN, Deliverables & Costs Deliverables –Series of workshops –Capabilities database –Updated Technology Roadmaps on 2-yearly cycle –Developed interactive website for teams –Public webpages Costs –As in FP6 with adjustment for inflation (315 Keuro) – Lead Agency UKATC

John Davies. FP7 Planning Meeting, UKATC June FASE. (Future Astronomical Software Environment) FP6 progress Monthly phone meetings, Semi-annual face-to-face meetings, Documentation and minutes on Twiki Web site Three main deliverables: –High-level requirements. ( Draft version available fall 2005, Internal, written review spring 2006, Final version fall 2006 after community wide review) –Achitectural concept document ( Draft available spring 2005, Review expected late 2006 with final version early 2007) –Interface specifications (Draft version in spring 2007 based on proto- type work, Final version after review during fall 2007) Documents will be delivered by end 2007

John Davies. FP7 Planning Meeting, UKATC June FASE: FP7 objectives Next natural step is a basic implementation of FP6 derived specifications providing: –Single-user, desk-top version with scalability –Command line execution of application tasks –Links to Python scripting language –Easy interface to applications written in C and Fortran –Access to legacy applications from IRAF, MIDAS,... Deliverables for a FP7 activity would be: –Detailed design and specifications for environment –User level documentation and tutorials –Basic implementation of environment as source code with installation procedures for Linux systems

John Davies. FP7 Planning Meeting, UKATC June FASE: FP7 Resources. Implementation requires actual man-power! Estimate of resources (with high uncertainties): –20-40 FTE for software development assuming Major parts of central framework can be obtained from other open source projects (e.g. OpenRTE). This will be checked by proto- types forseen for fall 2006 and winter Environment is made available for a Linux platform only –20-50% adminstrative software overhead depending on how distributed the developments will be. –10-20 person scientific oversight committee –With 50% FP7 funding, this suggests at least 1-2 Meuro Potential participants ESO plus Institutes in Germany, Italy, Netherlands UK, Spain, Finland, and France (plus USA)

John Davies. FP7 Planning Meeting, UKATC June Interferometry Included in Interferometry presentation. Natural Continuation of FP6 work Networking component 575 KEuro

John Davies. FP7 Planning Meeting, UKATC June Telescope Directors Forum. FP6 Progress Annual Directors Meetings Oversight of Access programme First steps to Common proposal Software Requirements matrix for new members Promotion of Access programme in CEE Successful Access Office at IAC

John Davies. FP7 Planning Meeting, UKATC June TDF. FP7 Plans Objectives Continue Annual Directors Meetings and Oversight of Access programme More efforts at integration and rationalisation in conjunction with Access programme Resources about the same as FP6 + inflation (~200 Keuro) + cost of access office if required. Lead agency and budget holders TBD

John Davies. FP7 Planning Meeting, UKATC June ‘ Research Enhancement’. FP6 Progress Successfull submission of Marie-Curie program (Neon schools: 6 planned ) Set-up of WG to identify the needs Preliminary plans for specialised training workshops in « new observing techniques » (second half of FP6)

John Davies. FP7 Planning Meeting, UKATC June Enhancement FP7 Objectives: Develop the programme further, with support to observing schools of various types More emphasis on life-long training (workshops) Better use of archives (demos…) Organise some events in the East of Europe. FP7 Resources Lead Agency IAP Similar to FP6 plus inflation. ~150Keuro

John Davies. FP7 Planning Meeting, UKATC June New Outreach Network Objectives 1.Promote role of OPTICON in strengthening European Astronomy. 2.Form a network of outreach professionals to share ideas, tools, contacts, resources 3.Develop a critical mass of media contacts across EU so a ‘single button press’ reaches all European media

John Davies. FP7 Planning Meeting, UKATC June New Outreach Network Deliverables 1.Presence at IAU, JENAM etc backed up by suitable hardcopy (brochures, DVDs). 2.EU wide workshops of Outreach professionals 3.Fire and forget PR ‘cluster munition’

John Davies. FP7 Planning Meeting, UKATC June New Outreach Network Resources 1-2 FTE/year distributed across several sites as ‘part-people’ 50Keuro/year consumables/travel Total ~0.5-1 MEuro Lead Participants; Project Office (WP1) UKATC (WP2), IAC (WP3)

John Davies. FP7 Planning Meeting, UKATC June Second Generation Proposal and Observing Preparation tools Abstract: Exploit power of new Web technologies Standardise European (and World?) pre-observation data models Build on “Northstar” proposal tool to spread through Opticon and Radionet partners. Bring review/referee process into the web-based workflow Explore possibilities of standards for Observing Preparation. Proposer: UKATCPartners: ASTRON + TDFUSA: NRAO + ? Funding: € over 5 years (want enough effort to do something, not just talk about doing something) In very early stages – discussions with ASTRON next month.

John Davies. FP7 Planning Meeting, UKATC June New AO network Described in AO presentation Two Networks to strengthen an Science- instrument-AO integrated approach: –AO specification/performance & instrument designs: 150k€ –AO facilities performance versus science performance: 150k€ One specific AO Network: AO workshops/meetings on hot topics: 250k€

John Davies. FP7 Planning Meeting, UKATC June Project Office 1500 (Keuro) ELT 1500 NUVA 200 HTRA 192 KTN 315 FASE 1500 Interferometry 545 TDF 200 Access Admin 400 Enhancement 150 Outreach 750 Proposal tools 500 Adaptive Optics 550 Site Characterisation 250 Solar Network ? TOTAL Solar

John Davies. FP7 Planning Meeting, UKATC June FIN