Prioritization of VC HP Measures Variable Capacity Heat Pump Measure RTF Sub-Committee June 22, 2011 meeting.

Slides:



Advertisements
Similar presentations
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
Advertisements

Quick, But Not Risky Ken Nickolai. START HERE Much of your discussion will be about money. Think both about money that will be spent… And money that.
Product/Service Area: HEATING, VENTILATION, AND AIR CONDITIONING VCHP Energy Efficiency Measure Development Roadmap Barriers Action Items Resources TI.
BUILDING AIR CONDITIONING
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
TYPES OF MECHANICAL SYSTEMS
Welcome to a world of expertise Renewable Heating Solutions Jamie Boyd Sales Manager - Renewables & Installed Heating Glen Dimplex Northern Ireland.
California HVAC Program Strategy IOU Program Overview CPUC HVAC Workshop June 24, 2009.
Geothermal Heat Pumps in residential and commercial HVAC systems Dan Winters 4/18/11.
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
Variable Frequency Drives VFD Basics
Ductless Heat Pumps in Residential Applications Proposed Research Plan.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee September 28, 2011 Mira Vowles, P.E., CEM.
C A L I F O R N I A E N E R G Y C O M M I S S I O N 2013 Building Energy Efficiency Standards Residential Zoned AC Discussion August 18, 2011.
ASHRAE Presentation: VRF Overview Mitsubishi Electric Presenter: Phone number ©2011 Mitsubishi Electric& Electronics USA, Inc.
HVAC Systems Overview HVAC Overview - # 1 Tom Lawrence
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
VRF for the Seventh Plan Preliminary Approach and Data for a Variable Refrigerant Flow Measure for the Seventh Plan Regional Technical Forum January 21,
Brett Graham Habegger Corporation Midwest Regional Sustainability Summit May 1, 2015.
UNEP Ozone Secretariat Workshop on HFC management: technical issues Overview of HFC Market Sectors Presentation by Lambert Kuijpers, Ray Gluckman and Sukumar.
Morofsky1 Low-energy Building Design, Economics and the Role of Energy Storage Canadian possibilities based on the Model National Energy Code for Buildings.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee April 25, 2012 Mira Vowles, P.E., CEM Emerging.
Premium Rooftop Unit (RTU) Retrofit Overview August 20, 2012 RTF RTU Working Group Mira Vowles, BPA 1.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee November 16, 2011 Mira Vowles, P.E., CEM.
EvergreenEcon.com Heat Pump Water Heater Model Validation, Market Progress Assessment, and Process Evaluation RTF HPWH Sub-Committee Meeting October 15,
Green Building Demonstration Project Adam Saling City of San Diego.
Thank you for the opportunity to present at the 2013 NMAEE awards John Christensen Director of Physical Plant Albuquerque Academy.
Rooftop Package HVAC Operations and Maintenance Measures: David Baylon Stan Price Bob Davis.
ENERGY ASSESSMENTS, RETRO-COMMISSIONING AND TECHNICAL SUPPORT Eileen Westervelt | PE | CEM SEDAC, Program Director, Retro-Commissioning.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee March 27, 2013 Mira Vowles, P.E., CEM Emerging.
Lindab Solus - Simply the natural choice.... lindab | comfort Chilled beam revolution! + Save up to 45 % cooling energy!* + Installation and investment.
Results from the California Energy Efficiency Potential Study – Existing Residential and Commercial Jean Shelton July 27, 2006 San Francisco, California.
Re-Commissioning of the Water Cooling System at Université de Sherbrooke Department of Buildings June 2008.
N O R T H A M E R I C A C O M M E R C I A L TDP
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 22, 2012 Mira Vowles, P.E., CEM.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee June 12, 2014 Mira Vowles, P.E., CEM Emerging.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 27, 2013 Mira Vowles, P.E., CEM.
Northwest Power and Conservation Council Residential Conservation Resource Assessment Overview of Analytical Process and Major Assumptions April 21, 2009.
Learning, our way Daikin Europe, Consulting sales section1 Understanding Client’s Needs and best Daikin solution.
HVAC- Body Works 1 Energy Analysis and Comfort Solutions Inc. Consumers – understanding how an HVAC system works.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump Sub-Committee Alternative Incentive Approaches BPA Energy.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee August 28, 2013 Mira Vowles, P.E., CEM.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee September 25, 2013 Mira Vowles, P.E., CEM.
Northwest Power Planning Council Residential Space Conditioning and Domestic Hot Water Conservation Resource Assessment Overview of Analytical Process.
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee July 24, 2013 Mira Vowles, P.E., CEM Emerging.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Water is the Natural Choice Hydronic Comfort Systems Increase and Maintain Building Efficiency For the Life of Your Building
Water is the Natural Choice Water: The Natural Choice For Efficiency – Building System efficiency not just a unit rating – Equipment Ratings EER and COP.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump Sub-Committee Road-Mapping Session BPA Energy Efficiency.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
VRF Applications in PNW RTF RTUG Meeting October 26, 2011 Kevin Campbell Reid Hart, PE Technical Research Group.
Green Server Room Construction Primary concerns when building a server room is size and cooling. Size can be diminished with the use of virtual servers.
Design What is the first step in designing a high-performance building? Would it be: Identify synergies Select the correct HVAC system Design around human.
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Incorporating Energy Conservation Strategies into University Research.
Product/Service Area : HEATING, VENTILATION, AND AIR CONDITIONING VCHP Energy Efficiency Measure Development Roadmap Barriers Action Items Resources TI.
Part 16 Technician’s Guide & Workbook for Duct Diagnostics and Repair
HVAC Replacement Case Study
HEAT RECOVERY VENTILATION MAKING MONEY WITH SMALL COMMERCIAL RETROFITS
Action Plan for Variable Capacity Heat Pump Technology
HYDRONIC HVAC: The Most Comfortable and Efficient System
HYDRONIC HVAC: The Most Comfortable and Efficient System
Types of HVAC Technology Used in Business Establishments
Renewable Cooling – On the way to large market introduction
ANSI/ASHRAE 90.4 Energy Standard for Data Centers
HCB 3-Chap 19A: All-Air Systems_Single Zone
Minimizing Heating & Cooling Costs
Heat Pump Water Heaters and California’s Decarbonization Initiative
Presentation transcript:

Prioritization of VC HP Measures Variable Capacity Heat Pump Measure RTF Sub-Committee June 22, 2011 meeting

Prioritization Overview  Roadmapping generated a list of over 30 VC HP applications, which were screened for the 5 highest priority measures.  These 5 measures were further evaluated in this prioritization.  Questions were sent to over 20 people and 11 responses were received.  The prioritization consisted of four questions, evaluating: 1. Expected savings potential for each measure; 2. Payback periods for each measure; 3. Capture measure specific drivers 4. Capture measure specific barriers.. 2

Top Five VC HP Measures 1) Install a DHP mini split, replacing electric resistance heat without any air conditioning for a commercial application in a converted house. 2) Install DHP mini splits in small retail (less than 20,000 SF), conditioned by split- system heat pumps. 3) Install a VRF multi split-system in a small or medium office (less than 100,000 SF), replacing the existing rooftop heat pumps or air conditioning units with a energy-recovery-ventilator (ERV). 4) Install a VRF multi split-system with heat recovery capability in a small or medium office (less than 100,000 SF), conditioned by multiple air-source heat pumps or air conditioning units with electric heat. 5) Install a VRF multi split-system with heat recovery capability in any commercial building with constant heat source, such as a data center, replacing electric heat. 3

Evaluation Results - By Score 4 VC HP Measure Scores

Ranked VC HP Measure Scores Top 5 VCHP Measure Ranking Commercial application in a converted house: electric resistance replaced by DHP mini split Small and medium office: heat pump or AC with electric heat, replaced by VRF with heat recovery Small and medium office: rooftop unit replaced by VRF with energy recovery ventilator Small retail: split system heat pump replaced by DHP mini split Small and medium office: heat pump or A/C with electric heat replaced by VRF Expected Energy Savings Payback Period Total Scores Combined (equal weights) Ranked as the best within the corresponding criteriaRanked as the second best within the corresponding criteria

Measure Specific Drivers What are the things you like about each application? Mike Cundiff Duane Lewellen Mira Joel Jackman (PSE) Mark Jerome Aquila Velonis (Cadmus) Erin Rowe Chris Wolgamott O. Mattias Jarvegren Aaron Winer 1) Commercial application in a converted house: electric resistance replaced by DHP mini split Better zoning, instant energy savings Electric res to HP greatest savings Low cost, low ambient performance reduces winter peaks, simple measure Save fan energy if existing is furnace; occupant will like cooling benefit Good savings & quick payback Easy to implement (similar to res applications) Giving A/C without having to install duct work. Should improve comfort as well Easy install, easy to offer incentive. Low cost, fast installation with quick payback. 2) Small retail: split system heat pump replaced by DHP mini split Lower demand on grid Zoned heat pump vs central system Low cost, low ambient performance reduces winter peaks Fan savingsSome energy savings Easy to implement (similar to res applications) get a lot of reqests for this in small retail Increase unit efficiency to a level higher than most split systems Easy install, easy to offer incentive. Low cost, fast installation with quick payback 3) Small and medium office: rooftop unit replaced by VRF with energy recovery ventilator Excellent energy savings, improved control and zoning, Potential for heat reclaim from core zones and exhaust systems Large potential ventilation energy savings, low ambient performance reduces winter peaks ERV is dedicated OA system. Can use DCV with CO2 sensor. Reduce fan energy should be good energy savings/ ventilation will be efficient not really applicable to new construction Not sureVentilation added. Larger efficiency impacts, would "clean up" equipment 4) Small and medium office: heat pump or A/C with electric heat replaced by VRF Excellent energy savings, improved control and zoning Potential heat reclaim no electric strip for aux low ambient performance reduces winter peaks, simpler measure A/C w/ elec Ht will save most. both will save fan energy Should be good energy savings get a lot of requests for this Not sureEasy install, easy to offer incentive. Combining existing functionality into one system 5) Small and medium office: heat pump or AC with electric heat, replaced by VRF with heat recovery Energy recovery between zones Doas ventilation plus zoned hp plus vrf Low ambient performance reduces winter peaks A/C w/ elec Ht will save most. both will save fan energy Should be good energy savings/ ventilation will be efficient get a lot of requests for this Not sureVentilation added. Combining existing functionality into one system, high tech solution 6

Measure Specific Barriers What are the potential problems or concerns with each application? Mike Cundiff Duane Lewellen Mira Joel Jackman (PSE) Mark Jerome Aquila Velonis (Cadmus) Erin Rowe Chris Wolgamott O. Mattias Jarvegren Aaron Winer 1) Commercial application in a converted house: electric resistance replaced by DHP mini split Life of building am unclear whether existing electric resistance heat is kept as back-up, unoccupied temperature setback may not occur, adds cooling loads Ventilation required; cooling load reduces savings aestheticsPoor installation practices Don't foresee a huge uptake for this measure How many of these still have electric resistance heat at this point No problems or concerns. Occupant education re: operation 2) Small retail: split system heat pump replaced by DHP mini split Retail turnover unoccupied temperature setback may not occur, difficult to coordinate ventilation system operation Ventilation required; reduced fan energy aestheticMinimal energy savings cost-effectiveness is main concern since the efficiency gain from a code heat pump to mini split isn't huge Lease vs Own, who going to pay for the retrofit No ventilation.Occupant education re: operation 3) Small and medium office: rooftop unit replaced by VRF with energy recovery ventilator Initial cost high unoccupied temperature setback may not occur, difficult to coordinate ventilation system operation If old RTU is used as ERV it may require significant refurbishment. May be better to replace it. more complicated commissioning and installation office size could really impact cost- effectiveness significantly High costs, long payback Added ventilation with VRF complicates install and increases cost. Occupant education re: operation, medium-high initial cost 4) Small and medium office: heat pump or A/C with electric heat replaced by VRF High initial cost unoccupied temperature setback may not occur, difficult to coordinate ventilation system operation Ventilation required. more complicated commissioning and installation size of office could impact cost- effectiveness significantly High costs, long pay back No ventilation.Occupant education re: operation, high initial cost 5) Small and medium office: heat pump or AC with electric heat, replaced by VRF with heat recovery Data Room application may require redundant system High initial cost unoccupied temperature setback may not occur, difficult to coordinate ventilation system operation more complicated commissioning and installation design criteria to ensure adequate heat recovery could vary significantly per project and energy savings would be hard to predict High costs, long pay back Added ventilation with VRF complicates install and increases cost. Occupant education re: operation, high initial cost 7

Discuss Other Approaches for VC HP Measures Upstream incentives Equipment incentives based on EER Whole building performance incentives Other 8