DI&C Project & Lead-Plant Experiences Gordon Clefton March 11, 2009.

Slides:



Advertisements
Similar presentations
Engineering Diploma Level 2 Unit 7 Application of Maintenance Techniques in Engineering In this unit you will get involved with both maintenance procedures.
Advertisements

Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Modelling and Simulation 7. September 2014 / Dr. –Ing Naveed Ramzan 1 Instrumentation and control Department of Chemical Engineering, U.E.T. Lahore Pakistan.
SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
INPO Update CMBG Meeting June 2013
Capital Project Cost Reporting. Project Goals Documentation of project approval Approval path based on reporting structure and individual approval limits.
Updated 1/28/2011. Technical Requirements & Regulatory Issues In Interconnection Agreements March 9, 2011 Jay Caspary ·
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
NAVAL REACTORS PROGRAM TMDE Status
Nuclear Energy Institute Overview Susan Perkins-Grew Director, Emergency Preparedness March 30, 2010.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
ISTOG MOV TESTING TRANSITION Prepared by: E. Cavey DTE-Fermi 2 Page 1 The GOAL of this effort was to develop implementation guidance for ASME Code Case.
Aditya Pavan Kumar.T (08FE1A0202) VIGNAN’S LARA INSTITUTE OF TECHNOLOGY AND SCIENCE 1.
Predictive Maintenance: Condition monitoring Tools and Systems for asset management September 19, 2007.
Seismic Instrumentation and Monitoring Needs of US Nuclear Power Plants Dr. Annie Kammerer Seismic Instrumentation Technology Symposium November 2009.
Oconee RPS/ESPS Digital Upgrade Presented by: Michael Bailey June 3,
SCADA and Telemetry Presented By:.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
Enterprise Asset Management
© ABB Oy 1 DOCPLCMODEL03 ABB ULMA / Web Imaging Systems lifecycle management model (LCM) March 2004.
1 PredictiveOnLine PREDICTIVE SYSTEMS ENGINEERING Vintec Knowledge Ltd.
David Bruce - Secretary, Faculty Advisor Liaison, Vendor Liason/Buyer, Document Coordinator Caleb Breazeale - Team Leader, Sponsor Liaison, Presentation.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Configuration Management Fundamentals including Margin.
TVA Sequoyah and Watts Bar Nuclear Plants
What about Japan?. Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6.
Current Inspection Process for Operators of Hazardous Liquids Pipelines Rod Seeley OPS SW Region Director May 18, 2005.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
TWG-NPPIC, May 2009, Vienna: UK status1 Current status of NPP I&C in the United Kingdom T P Smyth AMEC, Knutsford, Cheshire, UK 22 nd Meeting of the Technical.
Implementation of Global Satellite Navigation System (GLONASS) for In-Vehicle Emergency Call Systems: Status and Further Development Presented by the Russian.
Opportunities and Challenges Joseph Naser Electric Power Research Institute IAEA Technical Working Group on Nuclear Power Plant Control and Instrumentation.
Status Report for Critical Infrastructure Protection Advisory Group
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
The Minnesota State Colleges and Universities system is an Equal Opportunity employer and educator. Information Technology Enterprise Strategic Investment.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
New Reactor Construction Inspection
Life cycle services for automation products
Predictive Maintenance Panel International Newspaper Group 19 September 2007 Kansas City, MO Joe Bowman - ING Chairperson.
Nuclear Power in the United States Joseph Naser Electric Power Research Institute IAEA Technical Working Group on Nuclear Power Plant Control and Instrumentation.
Configuration Management for Digital Upgrades Configuration Management Benchmarking Group 2008 Conference Scott Patterson Program Manager for I&C Obsolescence.
1 RIC 2009 Perspectives on Digital I&C Licensing in the 10 CFR 52 Environment Thomas R. Fredette, PE NRO/DE/ICE2 March 11, 2009.
Utility Engineers, PC.  Generation  Transmission  Distribution.
1 Review of Specifications for Digital Upgrades NHUG Summer Meeting July 17, 2008 Tim Mitchell Component Engineering Palo Verde Nuclear Generating Station.
PARISUTHAM INSTITUTE OF TECHNOLOGY AND SCIENCE DEPARTMENT OF AERONAUTICAL WELCOME STUDENTS BY ANBARASAN.T DEPT. OF AERONAUTICAL.
Response to Security Officer Inattentiveness Keith Jury Vice President – Licensing & Regulatory Affairs March 11, 2009.
"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators,
IAEA International Atomic Energy Agency INTRODUCTION Module 2.
1 RIC 2009 NRO New Reactor Design Reviews and Engineering Jennifer Dixon-Herrity USNRC/NRO/DE March 11, 2009.
1 RIC 2009 Fire Protection: Organizational Readiness for NFPA 805 (Technical Session 5) Alexander Klein, P.E. Chief, Fire Protection Branch Office of Nuclear.
Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Standards Certification Education & Training Publishing Conferences & Exhibits Automation Connections ISA EXPO 2006.
EKT 314/4 WEEK 2 : CHAPTER 1 INTRODUCTION TO EI ELECTRONIC INSTRUMENTATION.
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
Fieldbus Foundation General Assembly 2008 Project Planning and Execution Mike Downey Jacobs Engineering.
FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012.
EPRI Update Procurement and Supply Chain
Spent Fuel Pool Instrumentation NRC Order EA
Transmitted by the IWVTA Informal Group
PRC Implementation Plan and Summary of Devices
Flooding Walkdown Guidance
Licensing the ALS FPGA Based Safety Related I&C Platform
SALES: HOW TO USE THIS PRESENTATION
NRC Cyber Security Regulatory Overview
MIT Nuclear Reactor Laboratory
ENTERGY FLEET FEEDWATER SYSTEM VULNERABILITY REVIEW
Sludge Dewatering Filter Press Controls Upgrade at SSWRF
Nuclear Safety Standards Committee 35th Meeting 24 – 28 June 2013
Presentation transcript:

DI&C Project & Lead-Plant Experiences Gordon Clefton March 11, 2009

Digital Experiences --- Agenda – Why Digital Upgrades – Digital Operating Experience at Oconee – Lessons Learned with Oconee’s LAR – Digital Project Path Forward 2

Why Digital Upgrades (1 of 1)  Driving Forces for Digital Upgrades Existing plant systems are obsolete Spare parts are limited Component repairs are addressing near-term equipment issues Elimination of single failure vulnerabilities through redundant equipment Enhancements to system design and functions Significantly improved on-line monitoring and channel check capability 3

Digital Operating Experience at Oconee (1 of 2)  Digital Upgrades completed on Oconee Units: –Integrated Control System ( ) –Operator Aid Computer ( ) –Main Turbine Control System ( ) –Digital Control Rod Drive Control System –Turbine Supervisory Instrumentation –Foundation Fieldbus System for Instrument Loop Upgrades (Process Control System) –Electrical Generator Automatic Voltage Regulator 4

Digital Operating Experience at Oconee (2 of 2)  Positive OE from Digital Upgrades: Replaced obsolete systems which had performance problems Improved system and plant reliability by installing redundancy to eliminate single point vulnerabilities Improved reactivity management by increasing system stability and reducing operator burden during power maneuvers Significantly improved: –System monitoring –Online functional check capabilities –Improved diagnostic capabilities 5

Lessons Learned with Oconee’s LAR (1 of 1)  For digital upgrades requiring NRC approval (RPS & ESPS), lessons learned by Oconee:  Regulatory findings  Regulatory standards  High quality, accurate, and timely documents  Milestone schedule  Communications  NRC/Vendor/Utility Engineering strength 6

Digital Project Path Forward (1 of 1)  Interim Staff Guidance (ISG): – Revise DI&C-ISG-02, ISG-04, & ISG-05 – Create DI&C-ISG-06 & ISG-07 – Roll ISG content into permanent guidance  Digital Project Workshops – Lessons Learned (Oconee & Wolf Creek) – LAR Preparation using ISGs 7

DI&C Project & Lead-Plant Experiences – Questions ? – Items to carry to NEI ? 8