Ground Safety Review – Phase II September 8-10, 2008 Phil Mott

Slides:



Advertisements
Similar presentations
Levolors New Size-In-Store Blind Cutting Machine.
Advertisements

Lesson 31 Main Engine Repair (II).  1. Crankpin bearing overhaul  2. Fuel pump removal & re-installation  3. Cylinder head removal/replacement  4.
Clark–Reliance Company Manufacturing Update Presented to General Electric July 17, 2007.
Heavy Concrete Construction Formwork
Phil MottAMS-02 GSR Phase II1 AMS-02 Vacuum Case Overview Ground Safety Review – Phase II September 8-10, 2008 Phil Mott.
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
Review of Helium Venting Analyses
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
PROJECT 100. PROJECT 100 DESIGNED TO BE: Cost Effective Compact Strong Simple Light Reliable.
ATLAS End-Cap C Proposed Transport Box P Cooke 15 June 2005.
1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.
TP4-ENERSOL-TD/PV double function
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
Health & Safety Environment Types of Truck Practical Take A Test.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
1 The Support Structural System for Sicbar and EC Detector of SciBooNE FermiLab/PPD/MD May 08, 2006 Edward Chi.
SQXF Shell & Yoke Assembly Procedure
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
ME 4182 Mid Term Presentation Team Moondogs October 2, 2006 From left: Rahul Kirtikar, Chris Sampson, Chris Culver, Mike Widerquist, Elias Krauklis
Current Safety Status Phase III Flight Safety Review 12 Jan 2009.
Other Flight Pressure Systems Phase III Flight Safety Review 12 Jan 2009.
1 AMS-02 Integration & Test Plans & Status Trent Martin 24 January, 2007.
Design Partition, Project Plan, Task Assignments and Conceptual Designs September 13, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher.
1. PURPOSE This procedure gives the essential requirements for proper equipment preparation and packaging. materials and supplies to insure delivery in.
P13458 RIT Senior Design Team May 10, :30AM Dresser- Rand, Painted Post Final Presentation:
LATLAT Beam Test Workshop 20th March GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
Overview of AMS-02 Changes due the addition of the Permanent Magnet
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
Structures and Mechanisms Subsystems AERSP 401A. Introduction to Structural Estimation Primary Structure: load-bearing structure of the spacecraft Secondary.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
Status of AMS02 Integration Area in Building 867 January 10, 2007.
1 Loscam Limited. 2 Pallets should be stored in a clean and dry facility Secure and with adequate air circulation, free from the possibility of flooding.
Shear Problem Defined There are no bolts on the inboard side of the coil structure to account for shear forces. Bottom Line: friction alone will not prevent.
P13458: Dresser-Rand Compressor Assembly Line Team Members: Lauren Kraft –Project Manager, Nick Feng – IE Cole Bowden – ME, Shawn Moseley – ME Jordon Boggs.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
1 AMS-02 Integration & Test Plans & Status Ken Bollweg/NASA John Heilig/JS Robert Becker/MIT 12 January, 2007 AMS JSC.
GLAST LAT ProjectMarch 08, 2004 Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation]
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
GLAST LAT Project Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation] –A)
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
Intelligent! Impressive! Incredible!
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
LARP Collaboration Meeting Racetrack Coil Fabrication
KSC Ground Operations Timeline. KSC CGSE TIM A Technical Interchange Meeting regarding the Cryo Ground Support Equipment was held at KSC November 1 st.
PHASE II FLIGHT-SAFETY REVIEW AMS-02 EXPERIMENT sub-detector SILICON TRACKER Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25,
Installation of the T600 at Fermilab CSN2, September 22,
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Phil MottAMS-02 Phase II Safety Review1 Vacuum Case Mechanical Design Alpha Magnetic Spectrometer (AMS) - 02 Phase II Flight Safety Review Vacuum Case.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
IT-4189 Supply and installation of a cryogenic distribution system
SX1 manipulation VERSION 1 Version
Escalator Installation
Cryoplant Installation Scope
LARP Vertical Test Facility
Floating Head Heat Exchanger
CMS Gantry for Detector Lowering
US-HiLumi – Shipping Post Assembly Status
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

Ground Safety Review – Phase II September 8-10, 2008 Phil Mott AMS-02 Ground Handling Equipment (GHE) and Assembly Operations for the GHE Ground Safety Review – Phase II September 8-10, 2008 Phil Mott Phil Mott AMS-02 GSR Phase II

Documents Governing GHE Design KHB 1700.7C Space Shuttle Payload Ground Safety Handbook SW-E-0002E Ground Support Equipment General Design Requirements NASA-STD 8719.9 formerly NSS/GO-1740.9B Standard for Lifting Devices and Equipment Phil Mott AMS-02 GSR Phase II

Primary Support Stand (PSS) Used for payload integration and shipping Two configurations: Low & High Constructed with Aluminum 6061 Covers are Alumalite (painted aluminum face sheet with plastic corrugate) Factors of Safety 2 on yield 3 on ultimate Phil Mott AMS-02 GSR Phase II

Primary Support Stand (PSS) – Low Configuration Shipping Configuration 195” x 125” x 117” high Top Cover is removed as one piece Phil Mott AMS-02 GSR Phase II

Primary Support Stand (PSS) – High Configuration Assembly/Integration Configuration 195” x 125” x 166” high Phil Mott AMS-02 GSR Phase II

Primary Lifting Fixture (PLF) Used to lift the PSS and AMS-02 Welded steel A36 structure WLL: 26,800 lbs Factors of Safety 3 on yield 5 on ultimate Initial proof load to 2X WLL Annual load test to 1X WLL Phil Mott AMS-02 GSR Phase II

Multi Purpose Lifting Fixture (MPLF) Used to lift the Lower USS (LUSS) into place on the Upper USS and to lift the PAS into place for attachment Welded steel A36 structure WLL: 7000 lbs Factors of Safety: 3 on yield 5 on ultimate Initial proof load to 2X WLL Annual load test to 1X WLL Phil Mott AMS-02 GSR Phase II

Lower USS (LUSS) Shipping Fixture Used to ship/move/install the Lower USS Can be moved with forklift or crane/MPLF Welded steel A36 structure Phil Mott AMS-02 GSR Phase II

Can be moved with forklift, crane, air pallet, hand carts, or by hand Other Hardware Can be moved with forklift, crane, air pallet, hand carts, or by hand All lifting hardware will meet NASA-STD 8719.9 Master Dewar Transfer Dewar Valve Box L Valve Box S Control System (5 racks) Pumps (2) Heat Exchanger Hoses, Stands, Fittings, Etc Power Supply (2) Chiller PVVV Vacuum Pump UPS’s Numerous computers Toolboxes (2) Fans TRD GSE Air Supply/Compressor K Bottles Phil Mott AMS-02 GSR Phase II

Assembly Operations Phil Mott AMS-02 GSR Phase II

Arrival at KSC – Unload/Prep in the SSPF Airlock Crane PSS/Upper USS-02. Fork/Crane Lower USS-02 Fork/Crane all other Hardware including CGSE Phil Mott AMS-02 GSR Phase II

Arrival at KSC – Unload/Prep in the SSPF Airlock (cont) Phil Mott AMS-02 GSR Phase II

Move Into SSPF – Footprint 7 Crane or air pallet PSS/USS-02 Crane, fork, or air pallet all other hardware Phil Mott AMS-02 GSR Phase II

Unpacking Remove the upper cover from the PSS using the MPLF or slings Remove the side panels from the PSS Remove the cover from the LUSS Shipping Fixture Set up Cryosystem GSE (CGSE) Phil Mott AMS-02 GSR Phase II

PSS Preparation for AMS-02 Assembly/Integration Install Upper Columns and Beams on the PSS Phil Mott AMS-02 GSR Phase II

PSS Preparation for AMS-02 Assembly/Integration Raise the PSS/Upper USS-02 to the high position Install supports Phil Mott AMS-02 GSR Phase II

Installation of the Lower USS onto the Upper USS Fork the Lower USS under the Upper USS in the PSS Phil Mott AMS-02 GSR Phase II

Installation of the Lower USS onto the Upper USS (cont) Lift the Lower USS into position using the MPLF Position hydraulic jacks under the Lower USS for support and final positioning Attach Lower USS to Upper USS with pins and bolts Phil Mott AMS-02 GSR Phase II

Installation of the PAS Weight of PAS = 220 lbs PAS will be installed using the LUSS, overhead crane, and bottle jacks PAS EBCS Phil Mott AMS-02 GSR Phase II

Installation of the PAS (cont) Procedure similar to Lower USS installation – Details in work Place PAS on top of LUSS Shipping Fixture Place under payload using forklift Raise and rotate using bottle jacks Phil Mott AMS-02 GSR Phase II

Installation of the Keel Weight of Keel = 67 lbs Keel will be a 2 person manual lift and bolts installed by a 3rd person Phil Mott AMS-02 GSR Phase II