NTS Update Gas Customer Forum 25 th September 2006.

Slides:



Advertisements
Similar presentations
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Information Transparency Proposal Transmission Workstream 2 nd November 2006 Presentation by Abid Sheikh, energywatch and Angela Love, Poyry Energy.
A regulatory framework for gas quality treatment facilities: recap and update.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Demand Forecasting and Gas Flow Data NW GRI Transparency Workshop Chris Logue – March 2009.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
MIPI / RG140 Update Chris Shanley. Agenda  Review Group Background  MIPI Project - Background  RG140 Principles to be delivered via MIPI  Functionality.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Transfer & Trades Special Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
N-W Regional Initiative: Transparency Questionnaire Results Sonia Brown Director – European Strategy & Environment 19 September 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Draft for discussion1 Daily Outlook Gas Day : Wednesday, 15/01/06 Todays Opening Linepack296mcm Predicted Closing Linepack (PCLP1)293mcm Change in Linepack-3mcm.
MIPI European Transparency Project (ETP) Transmission Workstream 7 th October 2010.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Supply Assumptions for Investment Planning Transmission Planning Code Workshop 1 3rd April 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
DRSEC Update Transmission Workstream 06 November 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Gemini Release 4 UKLC Update 8 th February Gemini Release 4 – UKL13820  UK Link Committee is requested to approve the following:  Implementation.
European Developments Transmission Workgroup 3 rd May 2012.
UNC Mod Implementation Paul Gallagher September 2006.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
UNC Modification Proposal 0097: Modification to release aggregated ex-post information for pipeline interconnector offtake flows Christiane Sykes E.ON.
NTS Entry Charging Review Update
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
Exit Capacity Substitution and Revision
Publication of Zonal Flex Data
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
Joint Office Presentation for Modification 0678
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Transmission Planning Code Review
UNC Transmission Workstream 7th December 2006
Proposed Transitional Gas Exit Arrangements
Revised Tender Timescale for DN Interruption Arrangements
Gas Customer Forum DN Interruption Update - Introduction
Richard Fairholme Transmission Workstream 4th September 2008
Mark Freeman 29th January 2007
Transmission Workstream DN Interruption Update - Introduction
Stefan Leedham Transmission Workstream 2nd November 2006
Transmission Workstream, 1 Mar 07
Revised Tender Timescale for DN Interruption Arrangements
Gas Customer Forum 28 July 2008
Presentation transcript:

NTS Update Gas Customer Forum 25 th September 2006

Area updates  NTS Charging  Winter 2006/7 Consultation Report  GBA notification service  006 Implementation  Introduction of new forecasting incentive  NTS exit reform

NTS Charging Proposal for April 2007  Pricing Consultation Document shortly  Changes to NTS Capacity charge methodology  Proposal key changes  Replace Transcost with a Transportation Model  Move from ten years of forward looking supply/demand projections to a single year model

NTS Capacity Charging Proposal Implementation  Exit  Implementation for 1 st April 2007  Entry  Implementation for 1 st April 2007 – revised reserve prices would apply for all auctions held on or after 1 st April 2007  Charging Model  The combined Transport and Tariff model would be made available to Users once S&D data could be made available  UNC modification may be necessary to address data confidentiality issues Contact Paul Roberts

Winter 2006/7 Consultation Report - Summary  Gas demand; forecasts materially lower than those produced in 2005  Gas supply; positive developments have been reported in relation to new infrastructure projects, however, uncertainty remains regarding utilisation rates  Electricity market; less uncertain. Coal generation expected to operate at baseload with gas providing marginal capacity  Weather remains key determinant  Little / no demand-side response required in an average / mild winter  Sufficient gas to maintain supplies to NDM market in a 1 in 50 cold winter  Information available throughout the winter via our website Contact Simon Griew /

GBA Notification Service  New subscription service  Active GBA notification  Text message and/or notifications  Free service Contact: Paul Gallagher, To register use the National Gas Operational Data website:

Mod Raised 3rd Nov ‘04 Information Provision: 006 Timescales DMR 9 th Feb ‘04 Final FMR 3rd Apr ‘06 RIA (1) Issued 27 th May ‘05 Effective Consultation Period IS Development Initial FMR 1st Nov ‘05 Ofgem Defer Decision July ‘05 RIA (1) Close 26 th Jun ‘05 Go-Live 3rd Oct ’06 RIA (2) Issued 3 rd Feb ‘06 RIA (2) Close 17 th Mar ‘06 Ofgem Decision 5th May ‘06

006 “Publication of near real time info at UK sub-terminals” - implementation  NTS input flow data from terminals, sub-terminal, storage  2 min resolution of data  Updates every 12 minutes  Supply updates effectively containing 6 sets of 2 min data Contact Development Chris Logue Operational Internet functionality to publish Approximately another £1.5m investment Delivers another world first?

Information Location  Available from the National Grid website  Located with other market data provided by National Grid within the Operational Data area of the site  Situated on a new button entitled  Energy – Flow Data,  or at URL  Information made available in 3 complimentary ways across 3 pages

Data Access  Page 1 (Instantaneous Flows  Latest 12 minute data in tabular and graphical form  Always shows the most currently available data  Page 2 (Entry Zone Graphs)  Up to last 24hrs data in graphical form by terminal / type  Can be used to monitor trends  Period selectable by user  Page 3 (User Defined downloads)  Provides flexible data download facility  Allows user to define download period, and  Any combination of sub–terminals/terminals API interface too …..

Example of Screen Layout – Page 1 6 snapshots of data at 2 minute intervals updated every 12 minutes Graph of latest flow data by subterminal Data issues highlighted Feedback Form Telephone Helpline: Latest relevant note Historical notes

Example of Screen Layout – Page 1 (Cont) Latest total daily flow into NTS Graph of latest flows for terminal

Example of Screen Layout – Page 2 (last 24 hours) Feedback Form Telephone Helpline: Selectable time period – last 24 hours selected

Example of Screen Layout – Page 3 Feedback Form Telephone Helpline: Selectable time period Select original or amended data Select sites of interest Selected data displayed graphically

006 Implementation Philosophy  Data as seen by Control Room  “warts and all”  “no guarantees”  Users can  View  Download  Access via APIs Data users will need to interprete data

New SO Gas Incentives  NTS Gas demand forecasting accuracy  Performance measure based on the accuracy of day ahead 1400 UNC gas demand forecast  NTS Market info website performance  Performance measures based on:  The availability of the National Grid Web information web pages (24/7)  The timeliness of publication of information reports on the website, fore example NTSAFF, NTSAPF, SISR03 etc In both cases, performance improvement to be delivered through IS changes, training, and process/analytical changes.

Day Ahead Demand Forecast Incentive  Option 2 risk/reward DF incentive chosen: Winter only incentive “13:00” Day ahead demand forecast Benchmark set at last years performance 3.6% = 11.4 mcm average error Circulatory issue critical?

NTS Exit Reform  UNC Mod Proposal 0116 “Reform of NTS Offtake Arrangements”  Points of clarification sought by Wednesday 27 th September  Mod Panel to consider potential consultation on 12 th Oct NTS advocate that this Modification Proposal should proceed to consultation and that it be considered in conjunction with Ofgem’s price control proposals envisaged ExCR (Exit Capacity Release) statement envisaged NTS Enduring Exit Pricing Methodology An alternate proposal has also been submitted by E.On Contact Paul Roberts