Guy Hudson Partner JLT RE +44 7767 880691 ICAR 2014.

Slides:



Advertisements
Similar presentations
July 18, 2008, Atlas Copco Group Q2 Results July 18, 2008.
Advertisements

Pricing Catastrophe Risk: Could CAT Futures Have Coped with Andrew? Stephen P. D’Arcy, FCAS Virginia Grace France Richard W. Gorvett, FCAS Presented at.
A.M. Best’s Insurance Market Briefing - Canada Reinsurance Overview Greg Reisner A.M. Best Company September 8, 2010.
Company LOGO OVERVIEW OF GLOBAL TRENDS IN REINSURANCE Mr. Johnnie Wilcox Managing Director United African Insurance Brokers Ltd.
State of the P&C Market. State of the P&C Market P&C Market Presenters : Jim Dwane, Chartis Insurance Jim O’Connor, Willis Jim O’Connor, Willis.
© Lloyd’s Paul Hennessy Navigators Underwriting Agency Lloyd’s Dynamics of the reinsurance international market and market perspectives April 2013.
Catastrophe Models December 2, 2010 Richard Bill, FCAS, MAAA R. A. Bill Consulting
Title here presented by John Doe Date here SOUTH AFRICAN INSURANCE ASSOCIATION.
Turkish Insurance Industry by Sezi Meric, Milli Re.
Wells Fargo Insurance Services © 2006 Wells Fargo Bank, N.A. All rights reserved. The entire presentation is confidential. Distributing or sharing this.
THE P/C (RE)INSURANCE VALUE CHAIN IS “IN PLAY” Vincent J. Dowling, Jr. June 10 th 2015 Young Professionals' Global Forum.
5. Alternative Risk Transfer BUS 200 Introduction to Risk Management and Insurance Fall 2008 Jin Park.
1 Outline  Historical Results and Baseline  2005 and 2007 – A period of change  2007 and beyond – Insight and Perspective  Industry Issues  TRIA,
Should There Be A National Reinsurance Catastrophe Pool ? May 8, 2006 Mary Z. Seidel Reinsurance Association of America.
Property and Casualty Insurance Marketplace Update November 2009 Tim de Jonge BComm, CIP, CRM Account Executive Aon Global Energy.
Commercial Insurance Underwriting University of Illinois Urbana – Champaign Finance 230.
Copy right of MAIPARK Global Conference on Insurance and Reinsurance for Natural Catastrophe Risk: Istanbul, December 8 th - 9 th, 2005 Natural.
CONSTRUCTION & THE FOOD INDUSTRY The Insurance Industry View Steve Exwood & Jon Miller.
July, 2012 Catastrophe Insurance Overview AIIF 2012, Baku, Azerbaijan.
 Hannover Re in Azerbaijan  Proportional vs. non-proportional  CAT XL Treaty  Multi-line combined per Risk / per Event XL Treaty Reinsurance Solutions.
National Council of Self-Insurers 2014 Meeting Presented by Tom Hebson Vice President June 2, 2014.
Overview of global trends in reinsurance (International reinsurance point of view) Thomas Hess Group Chief Economist Head of Economic Research & Consulting,
5th International Istanbul Insurance Conference
Permission to reprint or distribute any content from this presentation requires the prior written approval of Standard & Poor’s. Copyright (c) 2006 Standard.
AMERICAN INTERNATIONAL UNDERWRITERS MEDITERRANEAN, MIDDLE EAST & SOUTH ASIA Middle East Insurance Forum 2006 Paul Jewell Regional VP, Property & Energy.
Siniša Lovrinčević, M.Sc. Advisor to the Management Board Reinsurance Company Sava Limited The Reinsurance Market in the Global Village of Changes A Slovenian.
JUN 8 – 10, Relevancy of the Bermuda Market in a Fast Changing World.
ACE EUROPEAN GROUP Non-Life Securitisation CAE Conference – May 2008 Graham Fulcher Chief Actuary ACE European Group Chairman Securitisation of Non-Life.
2008 Cat Market Update Global Reinsurance Division Ken Radigan (212) 266 – 5992
2009 Annual results 24 March © Lloyd’s2009 Annual Results Presentation highlights Record financial results Solid financial position Equitas.
Recent Trends in Catastrophe Risk Pricing. 2  How do reinsurers price Catastrophe Risk ?  Trends in Catastrophe pricing in 2005  How has the market.
Evolution of Insurance Securitization Stephen P. D’Arcy Fellow of the Casualty Actuarial Society Professor of Finance University of Illinois UNSW Actuarial.
Andreas Vossberg Senior Underwriter, Property Treaty, Nordic Countries, Central & Eastern Europe, RE, (GERMANY) Saturday,
Role of the Reinsurance Industry in the Management of Catastrophe Related Risks Dr. Anselm Smolka Geo Risks Research Munich Reinsurance Company Global.
October 4, 2007 Proprietary & Confidential Overview of Professional Liability PLUS – Southwest Chapter Meeting.
Managing man-made catastrophe risk: A market perspective CAS Special Interest Seminar on Catastrophe Risk Management Atlanta, 7 October 2002 Thomas Holzheu.
Roumen Galabinov Chairman. Currently about 8% of the 3.6 million homes in Bulgaria are insured against natural disasters as earthquakes and floods. Although.
1 FBD HOLDINGS PLC 2005 PRELIMINARY RESULTS. 2 Forward Looking Statements This presentation contains certain forward-looking statements. Actual results.
AIIF 2015 Azerbaijan International Insurance Forum 2 – 3 July, 2015 “Current capacities and alternative markets for reinsurance - importance to adapt to.
Catastrophe risks and property insurance Roumen Galabinov.
FBD Holdings plc 2007 Interim Results August 2007 A.
1 Z Swiss Re New Markets INSURITIZATION Presentation to CAS CARe Seminar Nick Giuntini, FCAS August 15, 2000.
The Reinsurance industry: market overview Fabrice de Dianous SCOR Global P&C YALTA CONFERENCE 17 to 21 st of September 2012.
2004 Hurricane Season Recap and Observations May 2005 CAS Meeting.
©Towers Perrin Loss Reserve Adequacy and the Underwriting Cycle Casualty Actuarial Society General Meeting Montreal, Canada November 16, 2004 Michael E.
Cabinet Presentation State of the Florida Homeowners’ Insurance Market June 26,
Ras Group 3rd Quarter 2005 Results CEO Paolo Vagnone November 14th, 2005.
Avalon Re A Casualty Cat Bond. University of Houston, Oil Causalty Insurance, Ltd.2 Cat Bond Definition Cat Bond is short for Catastrophe Bond:
HUA Plc Presentation - Results for year ended 31 st December 2006 Page 1 Heritage Underwriting Agency Plc Presentation Results for the year ended 31 December.
3 rd International Workshop on Global Flood Monitoring & Modelling Assessing Global Flood Hazards: Engineering and Insurance Applications March 6, 2013.
Capital Modeling for Benefit Pools: A Case Study How Much is Enough (for us)?
Insurance Securitization Impetus Insurance Markets $ Billion in Capital Financial Markets $10-15 Trillion in Capital Catastrophe Potential $
Florida Insurance Conference On Financial Reporting 2011 Reinsurance Market Conditions.
1 CONFIDENTIAL ©2016 AIR WORLDWIDE The Evolving Role of Insurance in Building Climate Resilience Brent Poliquin, CCM May 27, 2016.
Current International Trends in Reinsurance African Reinsurance Brokers AIO 16 th Reinsurance Forum October 2010, Casablanca Omar NGADI.
IAIS Global Insurance Market Report (GIMAR) Christian Schmidt, Head of Macroprudential SupervisionBudapest, 17. June 2016.
What is the Value Proposition? 3rd International SPONSE Workshop
Actuarial role/ contributions/ challenges in Reinsurance
The Financial Services Industry: Insurance Companies
Reinsurance Introduction Types of Reinsurance Types of Reinsurers
Catastrophes Insurable vs. Non-Insurable Catastrophes
PRESENTATION AT THE IIZ WINTER SCHOOL BY:-
The Fundamentals of Investing
FJF/FÖRSÄKRINGSRÄTTSDAGEN: ÅTERFÖRSÄKRING
Credit Insurance - Global companies
Securitization of Catastrophe Risk
Supply Chain Risk as a Potential Performance Enabler
FBD Holdings plc 2008 Interim Results August
© 2016 Willis Towers Watson. All rights reserved
Lucia Bevere, Swiss Re Institute
Presentation transcript:

Guy Hudson Partner JLT RE ICAR 2014

2 AGENDA  Recent European Floods  What should Insurers think about these floods?  Reinsurance capital – The supply-driven inflow  The paradox of lower pricing amid heightening risk  So what might happen with Reinsurance rates for European flood exposed catastrophe programs?  Claims handling in light of increased losses

ROMANIA  27 th of July and 1 st of August:  99 homes were destroyed, 1,163 damaged and another 2,377 flooded.  2,475 wells have been plugged, 13 bridges were destroyed, 83 partially damaged, 60 culverts destroyed and hectares of land were flooded. PAID  Insured losses to residential buildings, as at 5 th August - 22 claims advised to PAID until yesterday lei (approx euro) related loss reserve ICAR RECENT EUROPEAN FLOOD LOSSES

ICAR RECENT EUROPEAN FLOOD & HAIL LOSSES 2014 Total damageInsured part Floods in Germany $890m Floods in Serbia €1.7bn €3bn ($4.08bn) ‘Insured losses were small’ Floods in Bosnia€1.3bn Hail in Sofia, Bulgaria (9th July) BGN 100M (Bulgarian press) = €51m

 Demonstrates very low insurance penetration in many countries of Central and South east Europe  Losses often from unpredictable Flash floods not Riverine Floods  Lack of third party proprietary models for flood in the region  Models are no good for flash floods  Evidence of Increasing exposure?  Evidence of Increasing hazard?  Is the portfolio of risks geo-coded? Quality of Information?  Is the Insurer adequately reinsured? ICAR WHAT DOES IT MEAN TO INSURERS?

REINSURANCE CAPACITY FOR FLOOD

THE EXTRAODINARY INCREASE IN REINSURANCE SECTOR CAPITAL THE LARGEST REINSURANCE SECTOR CAPITAL STRUCTURE SHIFT IN MEMORY?

ICAR 2014 JLT RE GLOBAL RE MARKET COMPOSITE CAPITAL* 8 The Upward March of Reinsurance Capital Increased Each Year Except 2008 (Financial Crisis) Note: Capital levels represent composite total adjusted shareholders’ funds. This is different from dedicated reinsurance capital and different still from reinsurance capacity. Excludes capital markets, catastrophe funds and internal reinsurance capital. *Represents a JLT Re proprietary list of leading global reinsurers. Sources: SNL Financial, JLT Re.

ICAR EVOLUTION OF THIRD PARTY CAPITAL: A BRIEF HISTORY 9 Source: JLT Towers Re ‘ NON TRADITIONAL’ % OF PROPERTY-CAT LIMIT SINCE 2000

ICAR 2014 PENSION FUNDS VS INSURANCE VS REINSURANCE VS RETRO PUTTING IT IN PERSPECTIVE 10 Pension Fund Capital Under Management $30 trillion Global reinsurance market dedicated sector capital ca. $300 billion Global retrocession capital <$30 billion Global insurance sector capital (including life) $2.5 - $3 trillion Source: JP Morgan, JLT Re estimates

ICAR $30 TRILLION? $900 BILLION? $675? $300? HOW MUCH CAPITAL COULD REALLY COME IN? Pension Fund Capital Under Management $30 trillion Global reinsurance market dedicated sector capital ca. $300 billion Global retrocession capital <$30 billion Global insurance sector capital (including life) $2.5 - $3 trillion $300 billion ($30 trillion x.1 x.1)? Source: JP Morgan, JLT Towers Re estimates

ICAR DON’T BE FOOLED BY THE STERILE LANGUAGE! AND WHAT DO RATING AGENCIES THINK OF ALL THIS?  Despite being well capitalized the P&C (Re) Insurance Industry faces ongoing pressure, particularly in the commercial lines sector  Record low investment returns continue to weigh on earnings  Alternative capacity starting to creep into casualty lines of business  Underwriting accuracy/discipline becoming even more important (cycle management) SectorS&PA.M. BestMoody’sFitch U.S. Personal LinesStable U.S. Commercial LinesNegative Stable Global ReinsuranceNegativeStableNegative Rating Outlooks by Agency

LOSS TRENDS AND LOWER REINSURANCE PRICING – A PARADOX OF SORTS? ARE PRICES DECREASING JUST AS RISK IS INCREASING? IT WOULDN’T BE THE FIRST TIME

ICAR UNDERWRITING GAINS EVERY YEAR EXCEPT 2011 HOW HAS THE REINSURANCE INDUSTRY FARED? JLT Re Global RE Market Index*: Combined Ratio Trends Combined Ratio *Represents a JLT Towers Re proprietary list of leading global reinsurers. Sources: SNL Financial, JLT Towers Re 100

ICAR PROPERTY-CAT LOSSES ARE NOT DECREASING DON’T BE FOOLED BY 2013 Deepwater oil rig, Washington hanger collapse Air France 447 KRW Tohoku, Thailand, Christchurch Sandy Potential to affect capital Potential to affect earnings Cyber Sector specialty loss range Sector natural catastrophe loss range Next time?

ICAR INSURED CATASTROPHE LOSSES $20.7 BN ANNUAL AVGE – GEOGRAPHIC DISTRIBUTION Insured cat losses are traditionally determined by North American hurricane losses Source: Swiss Re

ICAR INSURED CATASTROPHE LOSSES 2011 >$125 BN – GEOGRAPHIC DISTRIBUTION Shift in perils and regions Source: Swiss Re 2011: earthquake losses were the highest ever 2011: flood losses were the highest ever 2011: Other weather-related natural catastrophes were the 3rd highest ever (after 2005 and 2004)

REINSURANCE RENEWAL PRICING RECENT LOW LOSSES + EXCESS SUPPLY = NEAR UNIVERSALLY LOWER PRICING

 The major driver for 2013 was lack of catastrophes coupled with continued favorable loss reserve development from prior accident years  Four issues are now placing pressure on traditional reinsurers  Alternative capacity (capital market transactions, alternative/hedge fund backed Re)  Continued low interest rate environment  Primaries holding more retention  Favorable reserve development has to come to an end at some point  Potential reinsurer reactions  Additional M&A pressure?  Formation of alternative side car type vehicles to compete (e.g., Watford Re - PaCRe)  Use of the alternative market to reinsurers’ advantage for example, lowering PML’s by buying retro in the alternative markets ICAR RECENT RENEWALS SUMMARY

ICAR SO WHAT MIGHT HAPPEN TO REINSURANCE RATES FOR THE REGION? Increase loss activity in 2014 Lack of Historical statistics Lack of Geo-coding or partial Geo-Coding Increasing Exposures Increasing Hazards Lack of Independent Cat Models Some losses Flash Floods not Riverine Increased Capital Effect of Alternative Capacity Need for diversification Income requirements Single territory covers Pressures Downwards Pressures Upwards

 Lodgement and recording of claims - worked well at CHCH - contracted to firm operating from a broad (Australia), and untouched by the disaster  Give claimants information about progress. Very bad, with both EQC and companies. EQC processes not at all transparent - see Ombudsman's report with link on page  Claim settlement hindered at first by lack of clarity as to boundaries between EQC and companies covers  Claim adjustment made hard by multiple events  The decisions of EQC and companies not clear throughout as to what sort of claims would be settled in cash and which repaired  Technical skills such as builders in short supply  Shortage of skilled adjusters a problem. Shortage of qualified engineers - structural and geotech  Companies were reluctant to put enough resources in from abroad to expedite adjustment ICAR CHRISTCHURCH EQ CLAIMS HANDLING AFTER MAJOR EVENT

THANK YOU