July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test1 WBS 1.1.1.5 (& W.B.S. 1.1.1.6.2 & Services) Pixel Module Assembly & Test 1.Technical Status.

Slides:



Advertisements
Similar presentations
M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
Advertisements

L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Interconnection in IC Assembly
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
M. Gilchriese Mechanics Labor and Disk Sectors US Pixel Meeting November 2001.
Status and outlook of the Medipix3 TSV project
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
From Research Prototype to Production
13 Dec. 2007Switched Capacitor DCDC Update --- M. Garcia-Sciveres1 Pixel integrated stave concepts Valencia 2007 SLHC workshop.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
M. Gilchriese -February 1999 X-Ray Inspection of Flip Chip Assemblies K. Einsweiler, M. Gilchriese and J. Richardson LBNL.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN CERN hybrid production experience (or how to stay out of trouble)
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
Update on module mounting on staves and stavelets 13/6/11 1 1) Status of clean room for next assembly kit 2) DC to DC stave.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
BNL Role In ITK 1.Current R&D Roles 2.Proposed Production Role 3.Activities now until TDR (early 2017) 4.Resources and Infrastructure 5.Personnel 1 D.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
M. Gilchriese Disk Sector Production Pixel Local Supports Production Readiness Review.
FVTX Wedge Assembly WBS , , , , , David Winter Columbia University FVTX Wedge Manager.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 25, 2004.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
M. Gilchriese Items from Talks U.S. Pixel Meeting Santa Cruz July 2003.
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
M. Gilchriese Work Plan W. Miller iTi M. Cepeda, S. Dardin, M. Gilchriese, C. Haber, R. Post LBNL February 6, 2007.
Strip Tracker Costing Analysis Status Carl Haber July 25, 2011.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
Loading stave 4000  Receiving test of modules : No problem despite some damages at one edge of few modules (AMS) One MCC failure in one module, reworked.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
PACKAGE FABRICATION TECHNOLOGY Submitted By: Prashant singh.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
Module mounting possibilities (FDR and module task force proposals) & Module mounting status at Dortmund Daniel Dobos, University of Dortmund
A few points that need discussion today (Gerard) UH needs golden front boards (2?), golden HVB (1), and HV cabling to PS with the correct connectors. IU.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
1 Status of RPC Construction & Cassette Assembly Qingmin Zhang Argonne National Laboratory
Berkeley status Aug 10th, 2012.
ATLAS pixel module assembly flow
Detector building Notes of our discussion
GLAST Large Area Telescope:
Constructional requirements from ITk-Strips
FNAL Production Experience
GLAST Large Area Telescope:
US Module Testing Progress Report
Presentation transcript:

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test1 WBS (& W.B.S & Services) Pixel Module Assembly & Test 1.Technical Status 2.Goals for Service Panels

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test2 Technical Status Thinning and dicing Module Assembly Pigtails are gone Adhesives Sector loading Production testing Burn-in setup

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test3 Technical Status: Thinning and Dicing This is going very well. Great work by Amanda, Aldo, & Al Clark. Vendor GDSI has been very reliable. Cost under control. Only issue with FE-I1 was suspected silicon particle contamination leading to shorts during flip chip. This may not be an issue for FE-I1 (or it may be worse). Chip squashing tests are under way.

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test4 Technical Status: Module Assembly 1/2 FE-I1 used to “shake down” the module assembly process. Yield of all steps has steadily improved. Not quite at planned levels yet, but plateau probably not yet reached.

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test5 Technical Status: Module Assembly 2/2 Fixturing is very simple and works well. What we have is good enough for production. Assembly time with new adhesive tape is literally less than 1 hour per module Wire bonding with new machine is a breeze. But we need to buy such a machine! (availability assumed in cost and schedule) Only outstanding issue is how exactly to pot the bonds to avoid magnetic field resonance. Work in progress.

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test6 Technical Status: Pigtails Gone 1/3 Original design had cable soldered to flex pigtail, in turn wire-bonded to module In fixing a defective pigtail bypassing it with wires, we realized that the pigtail was hurting more than helping. Now cable soldered directly to flex. Fewer things to test, fail and assemble. No wire bonded connections to module All modules for a given disk are identical (before needed 2 flavors)

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test7 Technical Status: Pigtails Gone 2/3 implications for US assembly flow Flex + SMT LBL for cable Albany for HV test OU for MCC

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test8 Technical Status: Adhesives Flex Hybrid To module Attachment –Original scheme of no glue under flex bond pads did not work due to flex bow –Switched to silicone tape adhesive under bond pads. –Allows for excellent wire bonding and instant assembly. –Radiation tested OK. Some further qualification needed (thermal cycling, etc.) Module to Sector Attachment –SE-4445 Silicone accepted as new universal baseline –Modules on sector being loaded with this glue now (used to be CGL). Very good initial experience.

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test9 Technical Status: Sector Loading Major development here First and only real sector was loaded “by hand” with makeshift fixtures Original tooling, now 2 years old, had many problems. –Pickup of real modules built with Dyconex flex was a problem –Sector tubing design evolved and no longer fit. –No provision for survey of module position New concept introduced for sector safe handling, storage, survey, testing. “Sector frame”. Similar concept to flex frame. Entirely new tooling designed around frame. All parts have need built and are almost ready for first use (build second real sector). (aside: Fred charges all this to SCT account)new tooling

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test10 Technical Status: Production Testing Have been pushing for a documented module, sector and stave QA plan. Collaboration has been slow to respond. Nevertheless, a fairly clear picture is emerging of the resources needed. Basically: –Characterize each module with PC test setup –Burn-in and thermal cycle each module (new burn-in setup needed) –Burn-in, survey, thermal cycle, and IR image each sector (same burn-in setup as module) –Undecided: test each sector with ROD.

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test11 Technical Status: Burn-in Setup Finally started development at LBL Students + Eng. Div. drafter. Design “specs” –Keep it simple –Add-on to existing single module test setup –Cheap and easy to replicate (we expect everyone will want one). New burn-in board USB port or USB hub ISEG supplies for HV, bulk supply for LV power

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test12 Goals For 2004 Start Production! Finish production in early FY05! Try to get collaboration to buy into this “5 th disk” –Gain time on ramp-up –If it ends up working more or less it becomes half of a 3 rd hit

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test Goals: Type 0 Cable Production There is no flex pigtail fabrication ( > 0) Copper clad wire and other materials ($5K) PCB for PP0 connector end of cable ($1.7K) Cables attached to flex hybrid at LBL (600hrs tech.) Total: –$6.7Kthis is part of –600 hours labor ($40K)module assy. in WBS

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test Goals: Wafer Thinning, Dicing, Die- probing Production 100x Bumped FE-I wafer thin ($15K) Cleaning & re-coating in Microlab (100hrs student) Inspection (25hrs student) Dicing ($20K) Cleaning resist in Microlab (100hrs student) Single Die Probing & inspection (1760hrs student) Supplies (gel packs, etc) ($12K) Totals: –$47K ETC03 prod. total –2000 hours student ($30K) 29K+28K +20K

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test Goals: Production Module Assembly Shipping Covers & supplies ($8K) Equipment maintenance ($5K) Technician Assembly Labor (600hrs) Technician tests (bond pulls, etc.) (300hrs) Shops (100hrs) Totals –$ = $20K ETC03 prod. total – hours ($60K) 24K+176K (type 0 cable) -120K

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test Goals: Burn-in System Development Being developed by students + eng. Div. Drafter. First prototype by end of summer => Much of this cost is in FY03! At that point will need a lot of software help (new postdoc to jump in…) Same system to be used for sector burn in. See Module QA for operation of burn-in system Copies of system likely to be requested by collaborators –$20K board fabrications and purchases –440 hours drafter ($20K) –880 hours student ($12K) –80 hours shop ($6K) ETC03 –Total: $58K 46K +12K

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test Goals: Production Module QA Still hard to estimate how long it will take per module for 1 person + TDaq setup. Optimistically assume 4 hours per module. Need dedicated setup and a lot of disk space. Note this is different setup than burn-in. That’s a second dedicated setup. => Do we need one more TDaq setup? Yes. –New Tdaq setup & pwr supplies ($15K) –1760 hrs student ($25K) Burn-in setup operation –Operating supplies ($5K) –880 hrs student ($12K)ETC03 Prod. Total Total QA: $20K + $37K $45K + $75K -63K

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test Goals: Production Sector Loading This should not be a very labor intensive operation Ideally will be done by an engineering tech. now F/T on mechanics, to be trained by FRED. Important cost is frame holders for production modules and possibly additional tooling. –Misc. tooling, & supplies ($7K) –20 frames, 16shop hours each ($16K)ETC03 Prod. Total –440hrs. Mech. tech. ($16K) $7K + $24K +8K

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test Goals: Production Sector QA Involves IR, Metrology, Thermal cycling, and electrical burn-in Assume 1 sector/week => 1 FTE for this job (student OK) –Fixtures, storage ($25K)ETC03 Prod. Total –1760 hrs student ($25K) $36K + $12K What about database? ETC03 has $11K +2K

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test20 Module Production Summary Adding up the labor we need 4.1FTE students in FY04. –We have ~1. –New postdocs can pick up some of the work –Probably still need to hire at least 2 temps (eg. finishing undergrads) or find visitors or other help. Technicians needed: 1.6FTE. Seems OK. Assuming we can find this many students, looks like significant reduction compared to ETC03. (about 140K). But, part of these savings are not real because we are spending “production” money on continued prototype work in FY03. I have not tried to add up FY03 standing army cost and subtract it from production budget.

July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test21 Service Panel Production (2004) For 3-Hit System (everything up to PP1 tapes) 57Kg Cu-Clad Al Wire (+overage) $81K Flex fabs, connectors, vendor assy. $66K LBNL Tech. Labor 3648Hrs Total for Electrical component of Service panel production: $293K (2 hit total is $226K) This is the slide from last year. New estimate looks a tiny bit less (10-20%), but uncertainty is still too large to reduce this.