Ventura County Specific Field Fumigation Conditions Chloropicrin and Chloropicrin Containing Products.

Slides:



Advertisements
Similar presentations
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Advertisements

Chapter 18.  Challenges & rewards of greenhouse plants  Materials used for rooting media  Formulating & pasteurizing rooting media  Timing & methods.
Greater Chicago Damage Prevention Council REQUESTING PERMITS Excavator Responsibilities (Contractual and Municipal) A permit is required for any excavation.
DESCRIPTIONDESCRIPTION PROCEDURESPROCEDURES CUT- THROUGH RESTRICTION TRAFFIC- CALMING $200 FINE FOR SPEEDING SIGNS MULTI-WAY STOP (“MWS”) SIGNS THROUGH.
Agricultural Programs and Resources Division New Mexico Department of Agriculture Soil and Water Conservation District Supervisor Election Rules.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
David K. Paylor Director, Department of Environmental Quality May 27, 2014 VEDP Lunch & Learn Environmental Permitting 101.
Buffer Zones Distances, Credits & Posting (2011) Module 7 Soil Fumigant RED Requirements.
Soil Fumigation In Idaho
Springs Protection Options Septic System Evaluation Program Board of County Commissioners Meeting November 13 th 2012.
Alabama Dept of Public Health New Onsite Regulations Overview of Permitting Requirements.
Missouri CAFO Regulations & Nutrient Management Requirements Randy Kixmiller, P.E. October 20, 2005 Jefferson City, MO.
Volatile Organic Compound Regulations Randy Segawa and Pam Wofford September 2014.
Overview of Risk: The Need for New Requirements Module 3 Soil Fumigant RED Requirements.
Module Three Chapters 7, 8, & 9. Chapter 7 Site Assessment and Weather.
Indiana Confined Feeding Operations Permit Program Indiana Department of Environmental Management.
Site Specific Fumigant Management Plan And Post Application Summary Joel Kangiser WSDA.
Western Regions Pesticide Meeting May 2010 Tools, Calculators And Mapping Tools.
2010 Fumigant Handler and Worker Protection Measures Western Regions Pesticide Meeting May 2010.
Norton, 2010 E. Randall Norton, Ph.D. The University of Arizona Safford Agricultural Center.
Buffer Zones and Credits
Overview and Implementation Schedules Richard Keigwin, Director EPA Pesticide Re-evaluation Division.
Western Regions Pesticide Meeting May 2010 Buffer Overlap Limitations & Exceptions.
SB 490 Amendments to the Kansas Underground Utility Damage Prevention Act Effective January 1, 2003.
Fumigant Management Plans and Post Application Summary Reports Module 6 Soil Fumigant RED Requirements.
Good Agricultural Practices (GAPs) Module 4 Soil Fumigant RED Requirements.
1 ST. LOUIS REGION AIR QUALITY REPORT EWGCOG Staff Report July 7, 2006.
Fumigant Application Technologies and Compliance with Current Regulations Methyl Bromide 1,3-Dichloropropene Chloropicrin Mike Stanghellini TriCal, Inc.
Chemistry in Biology.
35 th Annual Assistant Commissioners and Sealers Conference DPR Update Joey Marade 35 th Annual Assistant Commissioners and Sealers Conference.
Module 1 Chapter 1, 2, and 3. Chapter 1 Overview of Soil Fumigants and Soil Fumigation.
Maricopa County Air Quality Department Performance Test Specifics Rob Arpino Environmental Engineering Specialist.
Solutions and Suspensions
Pest Control in Strawberry with IRF135, Pic and Metham K
Section 5.2 The Modern Periodic Table
STATE WATER EFFICIENCY AND ENHANCEMENT PROGRAM Jenny Lester Moffitt Deputy Secretary.
Chemistry of Life A Brief … Overview. Matter Matter occupies space and has weight. It can exist as a solid, liquid, or gas. It may be possible to break.
The Nature of Molecules Chapter 2. 2 Atomic Structure All matter is composed of atoms. Understanding the structure of atoms is critical to understanding.
CHAPTER 2 ATOMS AND ELEMENTS LESSON 1 WHAT ARE ATOMS AND ELEMENTS?
Utility Ordinance Water Conservation Policy Amended for SJRWMD Compliance 2009.
Proposed Regulation for the Measurement of Agricultural Water Deliveries Department of Water Resources Water Use and Efficiency PUBLIC.
The Periodic Table After this slide, everything in this power point must be in your notes… you may abbreviate, as long as you will understand it as you.
CALIFORNIA Golden State of Emergency By: Allyson Camitta.
Protections for Handlers & Workers (2010) Module 5 Soil Fumigant RED Requirements.
-Emergency Preparedness and Response - Difficult to Evacuate Sites - Notice to State Lead Agencies (2011) Module 8 Soil Fumigant RED Requirements.
Methyl Bromide Update: Reregistration and Montreal Protocol April 23, 2009 Reddick Fumigants.
New Requirements For Soil Fumigant Pesticide Products EPA - August 2010 Soil Fumigant RED Requirements Training Program Module 1: The EPA Regulatory Process.
Practice: 1. The electronic structure of an atom of an element in Group 6 of the Periodic Table could be: A 1s 2 2s 2 2p 2 B 1s 2 2s 2 2p 4 C 1s 2 2s 2.
California Department of Pesticide Regulation 1001 I Street, Sacramento CA October Application Phase Module 1.1: Document Review Structural.
Ionic and Metallic Bonding. Why do elements bond with other elements? Elements combine chemically to increase the stability of their electrons Electrons.
Applicator Training April 2011 Elise Doucette. Legal Decisions 2008 The Nat’l Cotton Council of Am, et al. v. EPA. As a result, a NPDES permit is required.
Volatile Organic Compounds in Pesticides Randy Segawa February 13, 2003.
Volatile Organic Compound Emissions from Pesticides March 2005 Randy Segawa.
West Pinal PM 10 Nonattainment Area Construction Dust Rule DECEMBER 9, 2015 JOSH DEZEEUW ENVIRONMENTAL PROGRAM MANAGER 1.
Legislative Overview  This quick module outlines in more detail the background of the legal requirements.
Water is a Polar Molecule! What is the molecular formula of water? Draw water and label it. Place a negative sign by oxygen and a positive sign by the.
Applicant:Derek and Erica Hokkanen Site Address: th Street Property #s: A Computer #s: Location:Section 33, T30N, R16W,
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
The Nature of Molecules Chapter 2. 2 Do Now Complete Vocab pre-quiz for Ch 2.
The Nature of Molecules
Update on Special Event Facilities Butte County Code Section
Jefferson County Planning Commission Hearing April 10, 2013
Fumigation Updates Presented by: Blanca Enriquez-Pratt
Regulation to Address Pesticide Use Near Schools and Child Day Care Facilities December 2017.
Implementing MB Alternatives in GA
Tribal/EPA Conference Region 9
Chemical Changes.
Classification of Matter Notes
Field Fumigation & Regulatory Update
Presentation transcript:

Ventura County Specific Field Fumigation Conditions Chloropicrin and Chloropicrin Containing Products

Outline Chloropicrin Quick Background and Facts New Chloropicrin Conditions Announced by DPR Larger Buffer Zones Buffer Zones -Methyl Bromide and Chloropicrin Minimum Buffer Zones Limiting Acreage 40/60 Notice of Intent Requirements Notification Fumigation Time Restrictions Buffer Zone Credits Allowed Ventura County Approved TIF Tarps for Buffer Zone Credits / Chloropicrin Interim TIF Tarp List Ventura County Micro Sprinklers “Sprinklers in Place ” Fumigating glasshouses with chloropicrin using an injection rig mounted on a Ransomes MG6 tractor 1960.

Background Chloropicrin, or trichloronitromethane, is a dense, pale yellow liquid that decomposes when heated to ≥112 ºC. Its property as a lachrymator prompted Germany to use it as a tear gas against the Allied forces during World War I—one of the first uses of a chemical weapon. In 1848, Scottish chemist J. Stenhouse prepared chloropicrin by treating picric acid with sodium hypochlorite. Nitro groups were the only parts of the picric acid molecule to be used in chloropicrin, but the “picrin” name stuck. Today, chloropicrin is manufactured by the reaction between nitromethane and sodium hypochlorite.

Chloropicrin Quick Facts: In 2012 chloropicrin was used on about 67,000 acres in California The Golden State has more than 9 million acres of irrigated land for farming according to the California Department of Conservation

Chloropicrin Use Ventura County 2012 Chloropicrin 1,889,235 LBS 9,607 Acres 2013 Chloropicrin 1,532,282 LBS 7,926 Acres 2014 Chloropicrin 1,764,243 LBS 8,441 Acres 2012 Methyl Bromide (Combination) 652,598 LBS 2,373 Acres 2013 Methyl Bromide (Combination) 393,486 LBS 1,251 Acres 2014 Methyl Bromide (Combination) 561,645 LBS 2,036 Acres

New Chloropicrin Conditions Announced by DPR Larger buffer zones Buffer Zones (BZ) for chloropicrin have been developed by DPR which are often larger than current labels. Use DPR’s BZ look-up tables (appendix K) in combination with the label to determine the most restrictive buffer zone distances at:

New Chloropicrin Conditions Announced by DPR Buffer Zone Credits Buffer zone reduction credits are allowed for approved tarp usage only. In contrast, label buffer zone reduction credits are not allowed for symmetry application systems, post-application water treatments, potassium thiosulfate, soil organic matter or clay content, or soil temperature.

New Chloropicrin Conditions Announced by DPR Buffer Zones for Methyl Bromide and Chloropicrin Combination For products containing methyl bromide and chloropicrin, determine the methyl bromide and chloropicrin buffer zones separately. Determine the methyl bromide outer and inner buffer zones distances following the procedure described in “Methyl Bromide Soil Fumigation Buffer Zone Determination” at:

Determine the chloropicrin buffer zone using the appropriate label or DPR buffer zone table. These determinations will result in three possible scenarios for buffer zone restrictions: If:Then: the chloropicrin buffer zone is smaller than both the methyl bromide inner and outer buffer zones… only the methyl bromide inner and outer buffer zone distances and permit conditions apply Scenario 1:

Scenario 2: If:Then: the chloropicrin buffer zone is larger than the methyl bromide inner buffer zone, but smaller than the methyl bromide outer buffer zone… there are two buffer zones – a chloropicrin buffer zone and a methyl bromide outer buffer zone. The chloropicrin buffer zone distance also functions as the methyl bromide inner buffer zone distance. Both the chloropicrin buffer zone and methyl bromide inner buffer zone restrictions apply. All of the methyl bromide outer buffer zone restrictions also apply

Scenario 3: If:Then: the chloropicrin buffer zone is larger than the outer methyl bromide buffer zone… there are two buffer zones – a chloropicrin buffer zone and a methyl bromide inner buffer zone. All of the methyl bromide inner buffer zone restrictions apply. The chloropicrin buffer zone distance also functions as the methyl bromide outer buffer zone distance. Both the chloropicrin buffer zone and methyl bromide outer buffer zone restrictions apply, except, no persons are allowed within the buffer zone except to perform fumigation-handling activities or transit by vehicle or bicycle

Minimum buffer zone distance: Tarps that qualify for a reduction credit of 60% Tarps that do not qualify for a reduction credit of 60% Untarped applications Application block Less than or equal to 6 acres Application block Greater than 6 acres, up to 40 acres 25 feet 60 feet 100 feet 100 feet Minimum buffer zone distances regardless of credits:

DPR Notice of Intent Requirements: at least 48 hours before the scheduled application Agricultural Commissioner’s Office at least 3 business days prior to the start of the fumigation applicator must obtain written approval of the NOI from the Agricultural Commissioner’s Office If the fumigation does not begin within 12 hours of the scheduled start time, a new NOI must be submitted and approved New Chloropicrin Conditions Announced by DPR

3 Business Days-NOI’s May through October field fumigation NOI’s submitted Re-submittals or amendments 2-3 inspectors managing the process/evaluating NOI’s

Emergency Preparedness and Response Measures (EPRM) If Response Information for Neighbors is chosen, it shall be recorded on the Notification Log (form VCAC ) and included with the NOI. Acceptable Methods United States Postal Service hand deliver door hangers notifying homes which may be vacant All notifications shall be in English and Spanish

New Chloropicrin Conditions Announced by DPR Fumigation time restrictions – change from proposal Labels have no restrictions on fumigation time All other factors being equal, higher air concentrations occur at night due to inversions and more stable atmosphere To help avoid peak flux at night for non-TIF and untarped fumigations Applications must start no sooner than 1 hr after sunrise Applications must end no later than 3 hrs before sunset TIF fumigations have no time restrictions

New Chloropicrin Conditions Announced by DPR Maximum acreage Non-TIF/untarped: 40 ac County List -TIF: 60 ac – change from proposal

New Chloropicrin Conditions Announced by DPR Buffer zone distances: reduction credits Labels reduce buffer distances up to 80% using 11 possible “credits” for conditions and practices with lower emissions DPR recommends 1 credit: 60% credit for TIF tarps Tarps assigned 60% credit require EPA and DPR approval

Volatile Organic Compound Emission's (V.O.C.’s) 2012 May through October V.O.C.’s emission’s total for Ventura County 826,904 LBS 87.8 % of total allowance Allowance = 942,000 LBS 2014 May through October V.O.C.’s emission’s 324,913 LBS 34.3% of total allowance Allowance= 948,000 LBS

County approved TIF Tarps for Chloropicrin 60% Buffer zone reduction AEP-one, clear, EVOH barrier, 1.0 milRaven TIF VaporSafe™ ≥ 1 mil Berry EVOH-High Barrier, black, 1.25 milTRM Manufacturing Weather-all Power Film HB 125, custom, ≥ 1.25 mil Berry EVOH-Supreme Barrier, black, 1.25 mil* (Not approved for use with MBr)TRM Manufacturing Weather-all Power Film HB 125, clear, ≥ 1.25 mil Berry Plastics TOTAL BLOCKADE TIF, white/black, 1.25 milTRM Manufacturing Weather-all Power Film HB 125, black, ≥ 1.25 mil Berry Plastics TOTAL BLOCKADE TIF, white, 1.25 milTRM Manufacturing Weather-all Power Film HB 125, white, ≥ 1.25 mil Berry Plastics TOTAL BLOCKADE TIF, green, 1.25 milTRM Manufacturing Weather-all Power Film HB 125, green, ≥ 1.25 mil Berry Plastics TOTAL BLOCKADE TIF, brown, 1.25 milTRM Manufacturing Weather-all Power Film HB 125, brown, ≥ 1.25 mil Berry Plastics TOTAL BLOCKADE TIF, black, 1.25 milTRM Manufacturing Weather-all Power Film HB 125, black/white, ≥ 1.25 mil Berry Plastics TOTAL BLOCKADE TIF, silver/black, 1.25 milTRM Manufacturing Weather-all Power Film HB 125, black/silver, ≥ 1.25 mil Guardian TIF ≥ 1.1 mil, embossedTRM Manufacturing Weather-all Power Film HB 125, black/clear/black, ≥ 1.25 mil

Sprinklers in Place Meeting held on March 4 th 2015 discussing micro sprinklers Discussed odor suppression through the use of micro sprinklers Grower’s are using micro sprinklers more with drought situation Agricultural Commissioner- Henry Gonzales- confident in our TIF list and combination micro sprinklers for odor suppression The requirement of “Sprinklers in Place” – same as past years Outcome: ***Micro Sprinklers (if used with county approved TIF tarp list) MEET requirements of “sprinklers in place” for odor suppression***

Thank You! Ryan Casey Deputy Commissioner Ventura County Agricultural Commissioner’s Office X 7132