DOE and the Savannah River Site The View from South Carolina Ernest Chaput May 23, 2007.

Slides:



Advertisements
Similar presentations
Strengthening National Metrology Institutes (NMIs) in the Hemisphere, an essential element in the development of National Quality Infrastructure (NQI)
Advertisements

Public Private Partnerships and Development Razvojni program ujedinjenih nacija.
Industrial Footprint Project
4-H Administrative Update 2006 Youth Development Institutes March 2006.
Office of Nuclear Energy 1May 20, 2013 Property Management Workshop Office of Nuclear Energy Program Perspective Delivering Nuclear Solutions for America's.
Steve Griffitts, President Joe Dunlap, Ed.D., President.
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
| 1 The Municipal Farm Sustainable Reuse Plan Project funded through a Brownfields Area-Wide Planning Pilot Grant from the United States Environmental.
From – A Report of the Connecticut Regional Institute for the 21 st Century by Michael Gallis & Associates, 1999 (known as the “Gallis Report”) Knowledge.
UPDATE: “Military & Defense Sector” OEA Grant and Defense Industry Adjustment Program Presentation to the Washington Economic Development Association 4.
South Carolina Finance Workshop for Small Water Systems June 4, 2013 Water Partnerships: Financial Advantages and Challenges SC Case Study: Lowcountry.
MINISTRY OF OF ENERGY AND MINERALS DRAFT NATURAL GAS POLICY Presented By: Norbert. A. Kahyoza Assistant Commissioner for Natural Gas.
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
Lesley Gasperow Office of Health, Safety and Security (HSS) U.S. Department of Energy Program Overview, Challenges, and Opportunities.
Fermilab Environmental Management System (EMS)
1 Strategic Planning: An Update March 13, Outline What we have done so far? Where do we stand now? Next steps?
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
NASA Real Property Program August 20, 2014 Scott Robinson Director, Facilities Engineering Division Acting Director, Integrated Asset Management Division.
Ecotourism Virginia State Parks. What is Ecotourism Defining "Ecotourism" a has proven to be a difficult task given all the different players attempting.
BUILDING SUSTAINABILITY: PARTNERSHIPS AND FINANCE by S. Adrian Ross Senior Programme Officer PEMSEA.
2013 Annual Strategic Action Plan Evaluation. Overview Background Role of SAP Implementation Evaluation process Council feedback Enhancement of SAP.
Facility Lead Corrective Action Opportunities with Union Carbide RCRA National Meeting May, 2005 Bob Greaves EPA Region 3.
CAPTURING ECONOMIC DEVELOPMENT GRANT MONEY FOR CITIES & COUNTIES A Presentation to: Utah Alliance For Economic Development Presentation By: Logistic Specialties,
1 Robert S. Webb and Roger S. Pulwarty NOAA Climate Service.
Legacy Management Strategic Plan 2010 David Geiser Director, U.S. Department of Energy (DOE or Department) Office of Legacy Management (LM) November 2010.
1 presented to National Governors Association Federal Facilities Task Force National Transportation Program: A Policy Perspective J. Kent Hancock, Director.
Compact for a Sustainable Ventura County A project of the Ventura County Civic Alliance and the Ventura Council of Governments.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
COAST OPPORTUNITY FUNDS: 2007—2012 MAKING A DIFFERENCE.
PBNC- 1 Overview of US Nuclear Energy Initiatives /06- 1 Harold McFarlane President American Nuclear Society.
1 The U.S. NRC’s Reactor Certification and Licensing Process – Meeting the Challenge? Commissioner Peter B. Lyons U.S. Nuclear Regulatory Commission 15.
Engaging Communities in Developing a Sustainable Wood Products and Biomass Energy Industry By Gerry Gray Vice President for Policy American Forests.
Delivery System Reform Incentive Payment Program (DSRIP), Transforming the Medicaid Health Care System.
A centre of expertise in digital information management UKOLN is supported by: University of Bath Roadmap for EPSRC Catherine Pink Institutional.
M E Environmental Management safety  performance  cleanup  closure The U.S. Department of Energy Environmental Management Intergovernmental Meeting.
Transforming the Tech Valley Workforce Region A Blueprint From Traditional Manufacturing to Globally Competitive Advanced Manufacturing and Technology.
Public-Public Partnerships February 27, ADC WINTER FORUM | PAGE 2 Public – Public Partnerships Boot camp for Defense Communities Craig Zgabay.
Integrated Used Nuclear Fuel Management Regulatory Information Conference U.S. Nuclear Regulatory Commission March 11, 2009 Steven P. Kraft Senior Director.
Office of National Transportation Update Presented to: Spent Fuel Project Office Presented by: Gary Lanthrum, Director Office of National Transportation.
Christo van Niekerk, M.D. Senior Director, Clinical Development Pretoria, South Africa Innovating TB Treatment: Opportunities for Private Sector Engagement.
EM Budget--- Past/Present/Future Mark W. Frei U.S. Department of Energy October 14, 2005.
Long-Term Spent Fuel Management in Canada International Conference on Management of Spent Fuel from Nuclear Power Reactors Vienna, Austria May 31, 2010.
Environmental Management Review of Corporate Projects.
H 2 Opportunities, Collaborative Asset Management A Dual Approach to Cost Savings J ohn P. McCulloch H 2 Opportunities, Collaborative Asset Management.
Rappahannock-Rapidan Regional Visioning Process Counties and Towns of Culpeper, Fauquier, Madison, Orange and Rappahannock Bruce Dotson Tanya Denckla Institute.
Business Retention and Expansion What it is Why it is important How it works What makes it successful Business Retention and Expansion.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Country Partnership Strategy FY12-16 Consultations with Civil Society The World Bank Group June 2, 2011.
 closure E M Environmental Management  cleanup  performance safety STRATEGY MEETING NATIONAL SPENT NUCLEAR FUEL PROGRAM Bringing Innovation to Spent.
1 EM Update Presented to the National Governors Association Federal Facilities Task Force Dr. Inés Triay Principal Deputy Assistant Secretary for Environmental.
The Yucca Mountain Repository for Nuclear Waste June Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
Request for Information & Capability Statements Richland Acquisitions Post-FY 2018 November 17-19, 2015.
Strategic Plan Proposal The Challenge This strategic plan identifies what must be done, pre- school through grade 12, over the next three.
Federal Facilities Task Force Meeting, June 21-22, 2005 EM BUDGET UPDATE Mark Frei, DAS Business Operations Safe for the Workers, Protective of.
Office of Major Project Development (OMPD) Overview November 2015.
V Global Forum on Fighting Corruption and Safeguarding Integrity – South Africa Trade and Customs Partnership to fight against corruption and safeguard.
THE ROLE OF ENERGY COMMUNITIES IN A CONSENT-BASED SITING PROCESS Chuck Smith Councilmember, Aiken County, SC Chair, Energy Communities Alliance NEI Used.
South Carolina Nuclear Advisory Council SRS Update and FY 2017 Budget Service ● Safety ● Security ● Stewardship ● SRNL ● Sustainability April 14, 2016.
Welcome Carol Berrigan Nuclear Energy Institute July 13, 2015.
Budget Study Sessions Strategic Support Proposed Operating Budget OUTCOMES: - A High Performing Workforce that is Committed to Exceeding.
Partnering with Local Institutional Stakeholders.
American Recovery & Reinvestment Act Office of Environmental Management Presentation to Regulators March 6, 2009 Cynthia V. Anderson, EM Recovery Act Program.
Savannah River Site Watch Columbia, South Carolina
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
Purchase Order Records and Information Document Management
Oak Ridge Office of Environmental Management Update
Presentation transcript:

DOE and the Savannah River Site The View from South Carolina Ernest Chaput May 23, 2007

Topics to be Covered The Current Situation Community Priorities Highlights Issues and Concerns Thoughts on pending DOE initiatives

Disclaimer I talk to a lot of people This presentation is the synthesis of many viewpoints I am solely responsible for this presentation

General Public’s Attitude Savannah River Site is an important local employer providing quality jobs. Most are “comfortable” with SRS as a neighbor Recognized for strong safety and environmental protection programs. This ‘trust’ goes back over 40 years Most detractors are remote from SRS, and are more often concerned with DOE programs conducted at SRS, not SRS performance

Elements of a Community Vision SRS is a long-term part of our regional economic base Its importance/impact is reduced because of (1) downsizing and (2) significant diversification of local economy We support the assignment of new compatible core missions to SRS SRS physical assets and intellectual talent are used to leverage new private sector jobs and investment We are not a closure site

Consensus Guiding Principle No waste or excess nuclear materials shall be brought into South Carolina unless an approved and funded pathway exists for its processing and shipment to either a ‘customer’ or an out-of-state waste disposal facility DOE obligations to South Carolina shall be legally enforceable

We are a Involved Community SRS public support is legendary – large numbers, broad based and two states This is only half the story. Community participation and support at many levels: Actively support adequate budgets Comment on matters affecting site efficiency and long-term viability Sec 3116 Waste Determination: Actively supported regulatory approval of Saltstone Permit Modification Participated in M&O contractor selection draft RPF comment process Home to Citizens for Nuclear Technology Awareness Aiken County funding of Center for Hydrogen Research – modern laboratory facility for SRNL, technical transfer for the community Nurturing of SRS spin-off businesses

Community Priorities - Programmatic Expedited removal of high level waste from underground tanks and preparation for disposal in national repository Expedited stabilization for safe storage of plutonium from SRS and other locations Expedited preparation of plutonium received from out-of-state locations into forms suitable for shipment to users or out-of-state waste disposal facilities Regulatory milestones are met National laboratory and infrastructure programs are sufficient to attract new DOE missions and have beneficial impact on private sector Sufficient funding for timely support of program needs Early availability of Yucca Mountain

Community Priorities - Institutional Some common elements in the DOE and Community long-term visions Open, continuing and timely communication Locally and with Washington Timely follow-through on commitments An effective Community Relations Program Working with the Communities to leverage SRS activities for off-site jobs and investment

Recent Positive Highlights DOE support for Mixed Oxide Fuel Fabrication Facility (MOX) construction DOE’s aggressive program to deal with WIR lawsuit Community appreciates DOE efforts to protect high level waste and DWPF programs Focus on risk reduction D&D programs placed in lower priority A recognition of SRS’s ability to assist in addressing DOE-wide needs

Current Areas of Concern Delayed Construction of MOX Facility resulted in Aiken County lawsuit Congress is the current holdup Delay in Salt Waste Processing Facility facility redesign not in overall best interest Lack of Disposition Pathway for excess plutonium not suitable for MOX – plan de jour Research Reactor SNF remains without an approved disposition pathway Regional capabilities not always considered in contracting programs Eliminates opportunity for local economic development No DOE vision for long-term SRS viability (recapture of DOE investment) Individual near-term program interests appear to transcend DOE long-term corporate requirements Savannah River Ecology Laboratory is one example Improved communications could have minimized some of these concerns

Thoughts on DOE Initiatives Initiatives involving SRS Complex 2030 Global Nuclear Energy Partnership Plutonium Vitrification Facility Plutonium and HEU consolidation initiative Energy Initiatives

Complex 2030 Community supports DOE plans Modernize, right-size and cost effective We believe SRS is well suited for plutonium mission and will actively support that assignment Receipt of plutonium from other locations will not be an issue if (1) part of production mission and (2) non-suitable plutonium prepared for disposition.

Global Nuclear Energy Partnership An Energy Park on SRS is a location being considered in draft PEIS. We propose that all three facilities can be located on SRS GNEP fits community vision for DOE and commercial nuclear energy missions High level of local support but many questions Several Regulatory Challenges Licensing a new reactor type – NRC “Decay storage” and ultimate disposal of Sr and Cs – considerable state input may be required Community concerns include: SNF shipped to SRS, facilities are cancelled (defacto regional storage) Lack of Congressional understanding and support

Plutonium Vitrification Facility This facility is five years overdue. Has a strongly defined role in Surplus Plutonium Disposition Pathway for safe disposition of excess plutonium not suitable for MOX Facility Not a substitute for MOX Does not meet programmatic objective Does not have adequate capacity

Plutonium and HEU Consolidation Initiative DOE correctly identified SRS facilities as best able to dispose of surplus/waste plutonium and HEU currently at multiple DOE locations. Billions of Dollars can be saved. We want to help but we will protect against repeat of Rocky Flats debacle. Legally binding commitments Must be viewed as beneficial for total state (not just area surrounding SRS)

Energy Initiatives Nuclear Energy (in addition to GNEP) We want to be a greater player (partner with Idaho) in Gen IV and Nuclear Hydrogen Initiative. We are an active player in Nuclear Power We were a NuStart finalist. Also reviewed as alternate site in North Anna EIS Hydrogen and Fuel Cells SRS has largest staff of hydrogen scientists and engineers (Capability based on 50 years of tritium work) South Carolina’s many assets have been organized Good reception from industry – many cooperative programs Have been unable to become part of DOE core program. Nation will benefit from increased SRNL participation in DOE programs

In Summary South Carolina and SRS served the nation well during the cold war Events over the last ten years have tested the relationship between DOE and the community SRS is not a closure site There are many important challenges facing DOE and the nation which can benefit greatly from SRS participation. SRNL and basic SRS infrastructure should be supported based on potential future contributions DOE and the community need to redouble efforts to align our visions for the future of SRS. We will both be stronger.