Preconditions for operating at 5 TeV in 2010 Session 1 - 25 th January 2010 J. Wenninger BE/OP How to safely reach higher energies and intensities? Settings.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

DS Quench TEST 2  MOTIVATION and METHOD: 1. Achieve 500kW on beam 1 – TCP7 collimators.(so far 500kW with beam 2 and 235kW over 1s with beam 1 were reached.
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
LHC Beam Operation WorkshopM. ZerlauthDecember 2010 Thanks to : CERN Machine Protection Panel, EICs, et al 1v0 Do we understand everything about MP system.
Critical beam losses during Commissioning & Initial Operation Guillaume Robert-Demolaize (CERN and Univ. Joseph Fourier, Grenoble) with R. Assmann, S.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
The ATS MD part III (Achromatic Telescopic Squeezing scheme) Participants: Any (active) volunteers Goal: 1)MD1 (S. Fartoukh & R. Assmann  10h): “Pre-squeeze’’
* IP5 IP1 IP2 IP8 vertical crossing angle at IP8 R. Bruce, W. Herr, B. Holzer Acknowledgement: S. Fartoukh, M. Giovannozzi, S. Redaelli, J. Wenninger.
Beam Commissioning Workshop, 19th January Luminosity Optimization S. White, H. Burkhardt.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Overview of Machine Protection for the LHC
Injection test1 Injection test in 2006 The installation schedule version 1.7 recently approved includes a ‘possible injection test’ - foreseen in April.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
MP overview: experience and scaling to /29/2015JW - BC Workshop - Evian - Jan J. Wenninger Inspired by the discussions, commissioning shifts,
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
1 Beam Plans for Accelerator Systems: The Machine Protection System Jan Uythoven On behalf of the MPWG and the MPS Commissioning WG Special thanks to R.Schmidt,
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
PostMortem Workshop January LHC “Post Mortem” Workshop: Introduction Initiative by Robin Lauckner, Adriaan Rijllart and myself, helped by many other.
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
Running scenario 2009/10 Run through components – and then synthesis.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
1 Machine considerations and constraints for the Safe Injection Flag and Safe Beam Flag Jörg Wenninger AB-OP-SPS Introduction to ‘injection flags’ Machine.
Collimator settings for 2012 R. Bruce, R. Assmann for the collimation team
1 Commissioning and Operation of the machine protection system L. Ponce Acknowledgements: M. Zerlauth, J. Wenninger, D. Wollmann, V. Chetvertkova, G. Valentino,
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Β*-dependence on collimation R. Bruce, R.W. Assmann C. Alabau Pons, F. Burkart, M. Cauchi, D. Deboy, M. Giovannozzi, W. Herr, L. Lari, G. Muller, S. Redaelli,
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
Post LS1 operational envelope & MPS implications
The TV Beam Observation system - BTV
Wednesday
MD Planning Fri – Sat (26. – 27.8.)
LHC Commissioning with Beam
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
SPS extraction, transfer lines, injection
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
-9:00: Test IP transverse adjustment (CMS) and optics verification.
MD2036: UFO dynamics studies and UFO fast detection
Β*-reach in 2017 R. Bruce, S. Redaelli, R. De Maria, M. Giovannozzi, A. Mereghetti, D. Mirarchi Acknowledgement: collimation and optics teams, BE/ABP,
Initial Experience with the Machine Protection System for LHC
Intensity Evolution Estimate for LHC
Thursday morning – optics correction
Tuesday TOTEM and transverse loss map (1) OK
LHC Injection and Dump Protection
Week 35 – Technical Stop and Restart
LHC Beam Operations Past, Present and Future
Collimation margins and *
Machine Tolerances in Cleaning Insertions
Can operation put the MPS in a unsafe state?
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Beam Interlocks for Detectors and Movable Devices
The LHC Beam Interlock System
Interlocking strategy
Another Immortal Fill….
What systems request a beam dump? And when do we need them?
Presentation transcript:

Preconditions for operating at 5 TeV in 2010 Session th January 2010 J. Wenninger BE/OP How to safely reach higher energies and intensities? Settings and commissioning of MPS for 5 TeV operation

2 Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in 2010  The large majority of interlocks were tested and ACTIVATED ! o and we could still operate the LHC ! o and we did not quench with circulating beam – thank you collimation ! o the ‘with so many interlocks it will never work’ scenario did not occur !  But the beams were modest – compared to design: o the maximum stored energy was ~30 kJ – a factor 10’000 to go… o no beam made it above the SBF limit. 17 bunches – 30 kJ MPS in 2009 The 2010 plans imply World record stored energies ~10xTEVATRON to be reached on the time scale of a few months !

3 Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in 2010 A pilot bunch (5E9 p) is the only beam that can be used for commissioning (and for most MD) activities at ≥ 3.5 TeV ! LHC ½ Inom For TCTs the limit can be lower !! L ~ 2  cm -2 s 3.5 TeV,  * 2 m MP footprint

4 Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in 2010 Status of LHC MPS – end 2009  MPS tests without beam. o Almost completed (some test were not required for low intensities). o Only a few need to be repeated (equipment changes or upgrades).  MPS tests with beam. o ~2/3 of individual system beam tests completed. o Global setup and tests were performed for injection energy. o Setting up of collimators and absorbers (some only partially). o To be repeated at all energies and  * values. o A major item missing in 2009 was abort gap cleaning. o Tested, but operational (one undulator missing !) and not interlocked. o Critical at high(er) intensity and small  * (aperture limited by triplet).

5 Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in 2010 The more tricky issues from 2009  Safe Machine Parameters (SMP). o Reliability issues on ‘Safe Energy’ before startup with beam. o ‘Setup Beam Flag’ and ‘Beam Presence Flag’ issues related to BCT.  Solutions are (will be) in place to address safety issues – to be evaluated.  SMP system specification and design to be reviewed in  BLM signal ‘cross-talk’ and saturation (see previous talk). o Remarkable performance of the (very complex) BLM system. o BLMs at injection dumps saturated for short time scales. o Losses on transfer line collimators induce large signals on ring BLMs. o Scrapping in SPS mandatory – reliability issue (ISR scrappers !). o Over-injection not possible on ring2 due to similar effect from injection dump losses.  Solutions should be available for the startup…

6 Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in TeV, 5 TeV … For MPS operation at 3.5, 5 or 7 TeV is essentially equivalent. (splices not considered here…)  Emittance, minimum  * and collimator settings are different. o Collimators and absorbers must be setup again at every energy.  Quench level decreases with energy. o Collimator setup more critical at 5 TeV.

7 Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in 2010 Moving towards unsafe beams To operate with unsafe beam:  All MPS system test steps must be completed (with/without beam).  Global protection tests must be completed.  Collimators and absorbers must be in place. o Injection protection only required when unsafe beams are injected directly.  Beam diagnostics must be working.  Post-mortem diagnostics must be adequate. o In place, more online analysis to be developed.  Operational cycle must be established.

8 Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in 2010 The systems that are part of the MPS monitor equipment and beam parameters and aim to safely extract the stored energy in case of failure.  Safety levels are either unknown or estimated from reliability analysis. o ‘Dry’ operation to verify reliability estimates (LBDS and BIS reliability runs).  Critical point: common cause and correlated failures leaving the machine unprotected in some situations! o Protection redundancy based on a diversity of systems reduces likelihood of correlated failures – but we do not always have redundancy. o Careful performance monitoring during operation may reveal issues before they are the cause of incidents. Confidence in the safety is mostly obtained by running the system and monitoring it carefully >> this takes time ! Trust your systems

9 Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in 2010 For unsafe beams, we need a careful machine setup, a well established operational cycle, good diagnostics and a reliable control system.  Machine must be under control. o Optics, orbit, aperture.  Protection by collimators and absorbers at all times.  Appropriate interlock settings (BLMs, PCs…).  No (if possible!!) operational mistakes.  Good sequences, state machines, clear UIs…  Avoid dangerous failure coincidences (OP error + other failure). A good and stable setup

10 Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in 2010 The beam is a complex variable in the MP game.  Must control and know shape and position.  Tail populations and distributions are an issue.  The tails of a high intensity LHC beam constitute an unsafe beam.  Available reaction time to certain failures depends strongly on tail properties. And tails can vary a lot (beam-beam…). We must build up experience step by step: Intensity increase Stable running Careful monitoring And there is the beam

11 Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in 2010 The ‘safe’ part:  proposal from Evian Workshop ( )  Initial operation with setup (‘safe’) beams (I < SBF limit). o Up to 4 pilot bunches/beam are ~ at SBF limit (3E10) – limited risk.  Step 1: establish STABLE 3.5 TeV,  * = 11 m.  Step 2: establish STABLE 3.5 TeV,  * = 2-3 m. o Commissioning of  * squeeze in parallel to physics with  * =11 m. o No intensity increase wrt Step 1.  No more ‘Quiet beams’ periods. Startup 2010

12 Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in 2010  Monitor MPS performance and operation stability. o Losses (all machine phases), Post-mortem diagnostics,  Green light for intensity increase by MPx: o MPP for machine protection performance. o MP3 for magnet performance (quenches…).  Moderate intensity steps. o f ≤ 2-4 max, f decreasing function of intensity).  Maximize luminosity/stored energy. o Increase bunch intensity first, then increase number of bunches.  Plan a long(er) stable running period at ~0.5-1 MJ stored energy – that ‘s when we start drilling holes in the SPS! Increasing intensity

13 Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in 2010 (Recent) SPS incidents SPS dipole vacuum chamber GeV TT40 transfer line quadrupole vac. chamber GeV Uncontrolled beam loss in the SPS at GeV leads to severe damage for stored energies ≥ 1 MJ. (SBF limit = 70 kJ)

14 Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in 2010  Simulate failure scenarios, design the MPS to cope with the fastest failures. SPS ring is not fully protected against fastest failures. Detailed analysis at the LHC  Stop when you have doubts, make sure you have good diagnostics. o TT40 MD was continued despite some warning sign. o Insufficient diagnostics to evaluate situation.  Both incidents: direct impact on vacuum chamber. o Even imperfect dilution by collimators reduces strongly the local energy deposition and prevents damage. >> Respecting collimator/absorber hierarchy is essential ! A MJ-class beam in the LHC presents a much lower risk of damage than at the SPS if the collimators are properly setup ! Lessons from SPS incidents

15 Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in /10/2015JW - LHC Chamonix - Jan Global protection checks with beam Test that collimators intercept the (almost) all the beam.  Beam moved across tune resonance to induce large losses.  Mask BLMs for full loss of beam (low intensity). >> very successful : >99% of the beam intercepted by collimators IR7IR3IR6IR5 TCT !

16 Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in 2010  MPS setup and global MP tests must be repeated when: o  * is changed. o Crossing angles are switched on. o Energy is changed.  To gain efficiency, minimize the number of MP setups. o Choose 1-2  * values - stick to them (if possible).  At any given time there is a well defined operation envelope. o Total intensity o Injected intensity o Minimum  * o Crossing scheme MPS envelope To be respected

17 Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in 2010 Machine Development (MD) periods  During standard physics operation sequences and settings can be ‘nailed down’ for MP. o So far only orbit correctors are surveyed.  MD phases interleaved with standard OP are a potential threat. o Interlock masking. o Settings changes could break the collimator-absorber hierarchy.  One MD participant responsible to restore machine conditions.  Separation of settings for MD and for regular operation.  The scope of End-of-fill MDs will be severely limited because beams will be unsafe. o no squeeze, crossing angle, etc MDs that have not been tested before at low intensity.

18 Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in 2010 (Interlock) masking  BIS inputs: maskable channels are conditioned by the SBF. o SBF reliability depends on BCTs – more experience needed. o For regular fills we will force the SBF to FALSE (start ramp). o Beyond a certain intensity we could consider forcing permanently SBF to FALSE. Unforced by expert for MDs.  Software Interlock System: masking conditioned by RBAC. o Limited to EICs and SIS experts.  BLMs: approved procedure. o Strict rules for disabling a loss monitor.  PIC/PC: masking of circuits by expert possible. o Repairing a circuit may be more efficient that rechecking ramp & squeeze! o Faulty orbit correctors could be an (efficiency) issue – MCBX…

19 Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in 2010 Improvements & upgrades  Setting interlocks. o Protection against settings errors at injection is implicitly performed by the concept of beam presence for high intensity injection. o Circuits settings are only checked for RBs and orbit corrector (Software Interlock) – we may have to consider extending considerably, and performing interlocking PC currents at the level of the PC FECs.  Injection protection. o No protection by absorbers in horizontal plane.  Abort gap population. o Reliability and safety of synchrotron light monitor based protection.  Squeeze factor (= min.  *) o Additional ‘Safe Parameter’ to be distributed to collimators and absorbers. ……

20 Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in 2010 Conclusions In 2010 we will operate (highly) unsafe beam: we may reach sufficient stored energy to shutdown the LHC for some months in case of incident.  MPS commissioning to be finished, some part to be repeated (global tests). o Collimators and absorbers are critical.  Careful commissioning planning will avoid repetition of MP testing.  Operational cycle must be established to switch to unsafe beam.  Intensity increase must be gradual. o Careful analysis of losses and post-mortem data to validate safety.  Machine (MPP) and Magnet (MP3) Protection must work close(r) together. o In particular if we start to quench!  Great care must be used during MD periods not to jeopardize safety of regular operation.