University Of Vermont Central Plant Control Systems Upgrade Sal Chiarelli Director of Physical Plant Director of Physical Plant Michael Wells Central Plant.

Slides:



Advertisements
Similar presentations
PPC4000 COMBUSTION EFFICIENCY SYSTEM
Advertisements

UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Energy Efficient Steam Systems
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Tom Johanson – DNV KEMA Senior Engineer Building Automation Systems.
It can be as easy as patching a hose. TEAM UP! FOR COMPRESSED AIR SAVINGS.
MAGNA3 – “built on a proven foundation”
Horticulture Science Lesson 43 Controlling the Greenhouse Climate
Lighting and Wastewater Controls Smithfield Foods Engineering.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
MIS 2000 Class 20 System Development Process Updated 2014.
The Value of DOD Installation Energy Management Control Systems (EMCS) and Command Centers for Improved Operations and Increased Energy Efficiency Moderator:
An- Najah National University Faculty of Engineering Electrical Engineering Department Graduation project 2 Building Management System(BMS) Prepared.
Welcome To Our 14 th Annual All Hands Meeting Sal Chiarelli, Director of Physical Plant, 9/16/2014.
Franklin County Technical School Performance Contract Project.
Objectives: Understand importance of utility and maintenance system in industry/plant.
April 2004 page 1 Confidential and propietary CentraLine Portfolio c l o s e t o y o u.
Team 2: Kelly Foster Chad Mills Lirjon Llusho Dave Rosso September 30, 2009.
What’s behind the amazing light show and the booming wall of sound? Energy. Energy is all around us but have you ever considered a career in energy?
Utility Planning For North Campus Upgrades Area in and around Cook Physical Science Building Sal Chiarelli, Director of Physical Plant November 15, 2007.
44 th Annual Conference & Technical Exhibition By Thomas Hartman, P.E. The Hartman Company Georgetown, Texas Sustainable Chilled Water.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Department of Facilities Management Maintenance & Operations.
© 2010 McQuay International 1 McQuay Delivered VAV System Product Overview October 2010.
Deep retrofits: You get what you pay for Leslie Kramer, Stanford University and Jonathan Schoenfeld, kW Engineering June 17, 2014.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Oklahoma City Community College Strategic Planning Approach Cuts Cost….Improves the Learning Environment Smart and Sustainable Campuses Conference Monday,
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
ENTERPRISE ENERGY MANAGEMENT SYSTEM Jason Kutch, P.E. Malcolm Drane, P.E. UTILITY METERING AT PURDUE.
JADE™ Economizer Efficiency is simply a breeze Use the player controls to advance.
VISUAL SET POINT VERIFICATION METHODS USED AT SEABROOK STATION on the DEWETRON DEWE-5000 Bob Thomas Seabrook Station Grant Smith Dewetron, Inc PRDUG MEETING,
ENVIROTRAC: A Premier Chamber Monitoring and Data Acquisition System Envirotrac A Guided Tour.
Green Building Demonstration Project Adam Saling City of San Diego.
Smart Buildings Srirangarajan Kadaba National Manager – Energy Edge Buildings Business Schneider Electric 21June 2010.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
Presented by: Sal Chiarelli, Director of Physical Plant Panel: Terry Robbins, Facilities Zone Manager, Davis Zone Andy Galaczy, Senior Plumber, Davis.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
The Future of gps technology
MCS’S MAGNUM DIAGNOSTICS PACKAGE Visit us at
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Lindab Solus - Simply the natural choice.... lindab | comfort Chilled beam revolution! + Save up to 45 % cooling energy!* + Installation and investment.
Hospitality Management. The Big Problem in Hospitality Poor task and event execution of corporate strategy costs – 2% – 5% of Annual Revenues Analysts.
A First Look at WirelessHART ® An e-book by Pepperl+Fuchs.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Name of Building(s) or Project Speaker(s) Organization(s)
Re-Commissioning of the Water Cooling System at Université de Sherbrooke Department of Buildings June 2008.
Learning, our way Daikin Europe, Consulting sales section1 Understanding Client’s Needs and best Daikin solution.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Briefing Chilled Water and Temperature Stability Chris Channing Sr. Project.
Introduction to Energy Management. Week/Lesson 12 Advanced Technology for Effective Facility Control.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Evolution of PI in an Expanding Utility’s Strategy John L. Ragone KeySpan.
"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators,
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Chilled Water Plant Overview From Project Concept To Operation July 26, 2007.
Ross Parkman PE Ryan Wester PE Central Chiller Plant Experience Big Ten and Friends Mechanical and Energy Engineering Conference October 1, 2013.
Energy Conservation Building Upgrades Alma School District.
A Simple Path to Sustainability Presented by:. Steven P. Driver, Ph.D. Genzyme Energy Program Manager February
The key to comfort and reduced fuel use for all heating and cooling The key to comfort and reduced fuel use for all heating and cooling.
The South Texas Association of School Maintenance Officials By Climatec Providing safe, comfortable and energy efficient buildings for over 40 years.
IC3 GS3 Standard COMPUTING FUNDAMENTALS Module
Energy Savings Projects
UMCP Learning Objectives
Implementing Effective Energy O&M Strategies on a Limited Budget
Presentation transcript:

University Of Vermont Central Plant Control Systems Upgrade Sal Chiarelli Director of Physical Plant Director of Physical Plant Michael Wells Central Plant Supervisor Central Plant Supervisor Ray Racine Senior Controls Engineer Hallam-ICS Senior Controls Engineer Hallam-ICS

Utilities Master Plan Main Schemes Document existing conditions Develop central chilled water plant Upgrade steam distribution system Minimize single point failure points Eliminate choke points on the distribution system Retire old inefficient equipment Upgrade Building Control Systems Co-generation possibilities Central chilled water plant Capacities/limitations Utility Corridors/ Plan the campus Reduce demand (all utilities) Spend now to save later/reduce excavation Upgrade Central Plant Control Systems *****

Westinghouse to DeltaV From the old to the New From Charts that required Nightly changing Felt tip pens Ink cartridges

The Amazing Conversion New Air Conditioning Upgraded Electrical Distribution New High Efficiency Lighting New Computer Terminals New Office Furniture Air Filtration System Increased Square Footage of Room Installed State-of-the-Art Delta-V Operating System

The Beginning of New The installation of the new Delta-V Controllers New Air Conditioning to maintain constant temperature to assure life expectancy and computer function

Each New Component’s Benefits New Air Conditioning Allows for higher quality air supply Allows for higher quality air supply Computers have a safe environment Computers have a safe environment Computers operate optimally Computers operate optimally Employees have a comfortable safer work environment which increases moral and productivity Employees have a comfortable safer work environment which increases moral and productivity

Each New Component’s Benefits Upgraded Electrical Distribution Allowed for more efficient VFD’s to be installed thus decreasing electrical demands Allowed for more efficient VFD’s to be installed thus decreasing electrical demands Decreased the possibility of single point failures Decreased the possibility of single point failures Made maintenance of the system more user friendly Made maintenance of the system more user friendly Centralized three panels Centralized three panels Afforded the opportunity for further expansion Afforded the opportunity for further expansion

Each New Component’s Benefits Computerization of Control System Computerization of Control System Allowed for more efficient Reading to be Compiled Allowed for more efficient Reading to be Compiled Decreased the possibility of single point failures Decreased the possibility of single point failures Made maintenance of the system more user friendly Made maintenance of the system more user friendly Centralized Control of the five Boilers Centralized Control of the five Boilers Afforded the opportunity for further expansion Afforded the opportunity for further expansion

Each New Component’s Benefits Computerization of Control System Allowing for custom Alarming on the new computer System Allowing for custom Alarming on the new computer System A better view of Plant Systems A better view of Plant Systems

Making way for the New First Panels To be removed were #’s 1 & 2 Boiler Controls that were installed in &2 3&4

The Old BMS Control Panels Not only the Pneumatics were being removed but the old Burner Management System was going to be Computerized

All of This Turned Into…..

THIS!!!!!!!!!!

Halfway There

Delta-V: The Life Line of Campus

Delta-V & Hallam-ICS UVM selected the technicians of Hallam- ICS to: Install & Calibrate Instruments Install & Calibrate Instruments Work with Programmer to start-up boilers Work with Programmer to start-up boilers Initial Controls Vendor Programmer did not have DeltaV experience Code was not clean or consistent Code was not clean or consistent Start-up went poorly Start-up went poorly Operation of Boilers unreliable Operation of Boilers unreliable Trips not recorded Trips not recorded UVM did not trust DeltaV system

UVM forges a partnership Technicians told Mike about their programmer with boiler experience UVM contracted programmer for some simple fixes, which were successful & built trust UVM contracted programmer for some simple fixes, which were successful & built trust Programmer had boiler experience on several platforms, but had never touched DeltaV Programmer had boiler experience on several platforms, but had never touched DeltaV Hallam-ICS had already committed to learning this system – now a real world chance Hallam-ICS had already committed to learning this system – now a real world chance UVM agreed to let programmer learn on-line for 1 week (Hallam-ICS expense) UVM agreed to let programmer learn on-line for 1 week (Hallam-ICS expense) Programmer attended custom 2-day training by Emerson (Hallam-ICS expense) Programmer attended custom 2-day training by Emerson (Hallam-ICS expense)

DeltaV Gets a Facelift UVM contracts Hallam-ICS to convert Boiler #1 New System – New Rules Work with Operators to set color standards Work with Operators to set color standards Work with burner vendor to customize (from scratch) BMS code to these burners - NFPA is only part of BMS Work with burner vendor to customize (from scratch) BMS code to these burners - NFPA is only part of BMS Rewrite (from scratch) Combustion Controls to give reliable and efficient cross-limiting (understand burner efficiency & Stoichiometry) Rewrite (from scratch) Combustion Controls to give reliable and efficient cross-limiting (understand burner efficiency & Stoichiometry) Design Graphics for easy understanding and simple command entry Design Graphics for easy understanding and simple command entry Start / Stop – Auto / Manual – Setpoints Accurate “First Out” reporting Accurate “First Out” reporting Sensible Alarm strategies (color, sound, flashing) Sensible Alarm strategies (color, sound, flashing) Custom Reports from Historical Trends & Events Custom Reports from Historical Trends & Events

Simple Graphics

Meaningful Help Always Available

DeltaV Redeemed Boiler #1 Started-Up on New Controls One Day Start-Up for Combustion & BMS Next 3 Boilers in 2 days – Boiler #5 / 2 days Boiler House Trusted the System Operators liked new interfaces Adopted Pop-Up for Controls Philosophy Adopted Pop-Up for Controls Philosophy Screen Colors match piping colors in field Screen Colors match piping colors in field Alarm and Warning set at sensible levels Alarm and Warning set at sensible levels BMS “Christmas Tree” provides troubleshooting for light-off issues BMS “Christmas Tree” provides troubleshooting for light-off issues Standard Screen Navigation for all displays Standard Screen Navigation for all displays Overviews for system status Overviews for system status

Conversions are Never Finished Winter Loads show gradual changes Summer was not as forgiving Two Steam Absorption Chillers came on-line Wanted 20 KPPH Steam – Right Now!! Wanted 20 KPPH Steam – Right Now!! Plant Master could not respond without occasionally dumping a boiler Plant Master could not respond without occasionally dumping a boiler Three days of work to re-tune Plant Master Re-Test for winter loads in December

Just one More Thing Then came the Central Cooling Plant Two Steam Driven Chillers Four Towers and Fans Pumps & Drives Comm. Interface to Chillers (Modbus Serial) Provide summer Load to Boiler House Used existing Control Philosophy Upgrade successfully integrated into DeltaV

More Equipment

Running Systems

UVM Central Utilities Success Formula Consider current and Future Needs Develop Standards and stick with them Develop Equipment Vendor Relationships and Technical Support Relationships Keep it Simple Meet code requirements Meet code requirements Make it as efficient as possible Make it as efficient as possible Don’t make it any more complicated than absolutely necessary Don’t make it any more complicated than absolutely necessary Train your whole Team to run the system