ROADWAY DEVELOPMENT IMPROVEMENT PROJECT

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

Tips and Resources IASC Cluster/Sector Leadership Training
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
ACARP Australian Roadway Development Improvement Project OPERATORS’ WORKSHOPS March 2008.
Roadway Development Operators’ Workshop ACARP project C18023 CM2010 – Continuous Miner automation Dr David Hainsworth Dr David C. Reid 3-6 March, 2009.
Professionalism in IT - the UK perspective Susie Kay BCS Director of Professionalism.
Advancing Alternative Energy Technologies Glenn MacDonell Director, Energy Industry Canada Workshop on Alternatives to Conventional Generation Technologies.
Research Update Automated Bolting and Meshing Project - C17018.
Capacity Building Programme on the Economics of Adaptation Supporting National/Sub-National Adaptation Planning and Action Building Sustained Capacities.
Contract Certainty John Harvie 30 May Market Reform Page 2 How did this issue arise? –Global, historic practice and culture, a legacy of the past.
‘Feeder Blockage Removal Device’ Shane Phillips – Saraji Mine (BMA)
Back to Components High Capacity Underground Coal Mining (L15) A joint project (Scoping Study) between CSIRO Exploration & Mining and University.
ACARP KEY FINDINGS - DECEMBER 2006 BENCHMARKING STUDY Gary Gibson, ACARP.
Research, Science, Technology & Innovation Policy Framework in Namibia
ACARP Australian Roadway Development Improvement Project CM2010 IMPLEMENTATION STRATEGY August/September 2009 Guy Mitchell, BMA Coal Bob Miller, Centennial.
2. THE CIMA CHARTERED MANAGEMENT ACCOUNTING QUALIFICATION 2005
Do You Know ???.
APT APC 2015 LAUNCH. With APTitude The new SAICA APC has replaced the PPE and the Part II Finance Examination The APC is an assessment of professional.
Outburst Workshop A new operator’s perspective Scott Langley BHP Billiton Illawarra Coal.
Tech Indira IT Solutions Pvt Ltd
The Jordan Education Initiative started in January 2003 at Davos.
Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops March 2009 ACARP PROJECT C17004 TOUGH SKIN – A SPRAY-ON POLYMERIC.
Control of Airborne Respirable Dust Hazards: A Training Program for Underground Coal Miners The Penn State Miner Training Program University Park, PA
COMPETENCY CERTIFICATION WITHIN THE INDUSTRY Hazardous Area Standardisation - A case study from Australia 3 What is Competency Competency comprises the.
The Development of a Higher Level Apprenticeship in Construction Operations Management and an Integrated Foundation Degree.
16 Beltana Development ACARP Roadway Development Operators Workshop Sept
ACARP Australian Roadway Development Improvement Project OPERATORS’ WORKSHOPS September 2007.
Research Update Automated Bolting and Meshing Project.
ACARP Presentation Cutting A Smarter Metre Process optimisation techniques currently being utilised.
Improving Corporate Governance in Malaysian Capital Markets – The Role of the Audit Committee Role of the Audit Committee in Assessing Audit Quality.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
ACARP Roadway Development - Operators Workshop March 2008
Quality Assurance. Identified Benefits that the Core Skills Programme is expected to Deliver 1.Increased efficiency in the delivery of Core Skills Training.
Participatory research to enhance climate change policy and institutions in the Caribbean: ARIA toolkit pilot 27 th meeting of the CANARI Partnership January.
ACARP Australian Roadway Development Improvement Project ROADWAY DEVELOPMENT OPERATORS’ WORKSHOPS March 2009.
BASIC PRINCIPLES IN OCCUPATIONAL HYGIENE Day ASSESSMENT OF HEALTH RISKS.
Introduction to PSMO Process Safety Management for Operations.
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
DRAFT V1 National Vaccine Supply Chain Innovations: Country Commitment to Ownership, Sustainability & Impact GAVI Partners’ Forum WHO – UNICEF – GAVI -
Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops September 2009 ACARP PROJECT C17004 UPDATE: TOUGH SKIN – A SPRAY-ON.
ACARP Australian Roadway Development Improvement Project Strategy Workshop April 2007.
13/2/08 Fundamental Analysis of Development Cycles at Xstrata NSW Mines ACARP Roadway Development Operator Workshops March 2008.
Sectoral Initiatives Program CHBANETAC October 24, 2013.
1 ACARP Roadway Development Operator Workshops March 2009 Modelling of Gateroad Development Ernest Baafi – UOW Geoff Gray – SMS Ian Porter – UOW Osvaldo.
ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for.
ACARP Roadway Development Operator Workshop No 7 A Systems Approach to Roadway Development Mick Kelly, BMA Coal.
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
Quality Assuring Deliverers of Education and Training for the Nuclear Sector Jo Tipa Operations Director National Skills Academy for Nuclear.
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Evaluation and Review of Experience from UNEP Projects.
ACARP Australian Roadway Development Improvement Project OPERATORS’ WORKSHOPS March 2007.
Dr David C. Reid Dr Mark Dunn RDTG Operator’s Workshops Sept 2010 ACARP project C18023 CM2010 – Continuous Miner Automation.
CM2010 IMPLEMENTATION STRATEGY
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
ISO Registration Common Areas of Nonconformances.
1 Beltana Development. 2 Beltana Overview Process Control Continuous Improvement Summary.
Registration Process Environmental Management Systems Workshop Mobile, AL June 20-21, 2001 Beth Graves NC Division of Pollution Prevention and Environmental.
ASPEC Damaging Energies New Staff Induction What is this course about? This course is designed to talk through the major damaging energies on site. It.
MINE SAFETY MANAGEMENT PLAN. DIRECTORATE GENERAL OF MINES SAFETY DGMS n It is recommended that mines be required to put in place Mine Safety Management.
ACARP Australian Roadway Development Improvement Project OPERATORS’ WORKSHOPS August 2008.
WGCapD, CEOS and the UN Sustainable Development Goals (SDGs) Committee on Earth Observation Satellites Deputy CEOS Executive Officer / CSA Marie-Josée.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Scoping Study Process  Survey of mines currently using gas drainage and/or Outburst Management Plans  Outburst Research Needs Workshop attended by 20.
Economics of Policing Shared Forward Agenda Economics of Policing Shared Forward Agenda.
ดูแลด้วยความรับผิดชอบ
Implementing SMS in Civil Aviation: the Canadian Perspective
OHS Staff Introduction Training
Worcestershire Joint Services Review
Please read this before using presentation
Please read this before using presentation
Presentation transcript:

ROADWAY DEVELOPMENT IMPROVEMENT PROJECT CM2010 Update Greg Pawley, Xstrata Coal Bob Gordon, BHP Billiton Illawarra Coal Guy Mitchell, BMA Coal August/September 2010

CM2010 Update August/September 2010 CM2010 R&D Strategic Review Current Projects New Projects Under Consideration CM2010 Update August/September 2010

CM2010 R&D Strategic Review Strategic review conducted in July 2010 with objective of reconfirming and/or amending the CM2010 Vision, Goals, Measures and Strategies in the context of developments to date, and potential R&D achievements over the next 3 years CM2010 Update August/September 2010

CM2010 Update August/September 2010 Review Inputs Existing CM2010 Vision, Goals, Measures and Strategies Review of current research initiatives including both ACARP funded projects and direct industry funded initiatives (mines and OEMs) Fundamental Analysis of Roadway Development System – Richard Porteous’ excellent analysis of contributing factors to roadway development performance Roadway Development Technology Audit – report of the Audit completed earlier this year across mines, OEMs and suppliers CM2010 Technology Gap Analysis – as completed by RDTG CM2010 Update August/September 2010

Fundamental Analysis of Roadway Development Richard Porteous’ 2008 study across Xstrata’s 11 mines illustrated that adoption of current and emerging technologies has the potential to achieve significantly improved development rates Study based on standard bolting cycle of 6 roof and 4 rib bolts per metre, with base case of a miner-bolter and 1 SC (bolting constrained system) Study examines effect of various refinements to the system: Adoption of a bolter-miner with concurrent cutting and bolting Employment of a second shuttle car throughout pillar cycle Adoption of self drilling bolts Utilisation of a continuous haulage system Projected that a rate of 8.5MPOH could be achieved with these measures Fully details of report available at www.undergroundcoal.com.au CM2010 Update August/September 2010

CM2010 Update August/September 2010 2010 Technology Audit Recommended that the RDTG maintains general thrust of CM2010 and review R&D priorities in regards to: The development of remote bolting technologies including: Self drilling bolts Bolt, washer and mesh storage/handling Remotely controlled/automated bolting rigs and manipulators Associated sensing and monitoring systems The development of CM self steering technologies including: Remote sensing, seam profiling, and video monitoring Machine navigation and steering Communication protocols Machine supervisory/auto-reporting systems (including development of “black box” data logging system) CM2010 Update August/September 2010

CM2010 Update August/September 2010 2010 Technology Audit Recommendations regarding general thrust of CM2010 (cont): Addressing issues associated with on-board ventilation systems Development of SC guidance (automation) systems Addressing issues associated with management of face services, by either continuous haulage or monorail systems, including development of self advancing system in later instance Developing strategies to address equipment certification and regulatory issues, including adoption of EMERST design philosophies Also recommended that mines continue to undertake operational research to optimise face cycle times and engage change management expertise when introducing new development technologies and processes CM2010 Update August/September 2010

CM2010 Update August/September 2010 CM2010 Technology Gaps Technology gaps identified in CM2010 R&D strategy include: CM roof/floor horizon control Long tendon installation Monorail advancement systems (or alternatively, ventilation installation and extension systems) Higher capacity ventilation systems Remotely steered (automated) shuttle cars Collision avoidance systems – people and machinery Supply/logistics systems Conveyor advancement systems Services advancement systems Technology/systems integration Communications – both verbal and data CM2010 Update August/September 2010

CM2010 Phase II R&D Strategy Vision An integrated, remotely supervised high capacity roadway development mining system that enables 15 Mtpa longwall mines to be established and sustained with a single gateroad mining unit The system will also enable mining to be safely undertaken under adverse or extreme mining conditions, thus opening up access to reserves previously considered un-mineable Measures A sustained performance rate of 10 metres per operating hour (MPOH) for 20 hours per day, based on installing primary support of 6 roof and 2 rib bolts per metre advance together with roof and rib confinement measures (mesh) Improved health and safety through reduced exposure to hazards in the immediate face area CM2010 Update August/September 2010

CM2010 Phase II R&D Strategy Goals By end 2010, demonstrate key enabling component technologies that will form the basis of an integrated high capacity mining system, eg; remote operation of the continuous miner, automated self drilling bolts and mesh installation, continuous haulage, integrated panel services By end 2015, demonstrate all the elements of an integrated, remotely supervised high capacity roadway development system Progressively reduce the physical demands on personnel engaged in the development process and reduce their exposure to workplace hazards Encourage and support mines to develop the key organisational and technical competencies required to support a high capacity mining system eg; improved engineering availability, people behaviour and skills, and planning, organisation and process control CM2010 Update August/September 2010

CM2010 Update August/September 2010 Current Projects C16022 – undergroundcoalcom.au Recently gone live and can be accessed via web-site Continuing to develop site with industry support C17004 – ToughSkin Consolidating polymer chemistry research following departure of lead researcher March 2010 Recently identified an industry partner to continue development of polymer and coating formulation, including registration, certification and licensing of product Evaluating challenge posed by NSW Chief Inspector’s notification specifying that application or injection of polymeric materials for strata support is a licensable activity Stage III of the project to commence January 2011, subject to ACARP funding CM2010 Update August/September 2010

CM2010 Update August/September 2010 Current Projects C17017 – Automated Bolting and Meshing System Successfully demonstrated all components of system except rib bolt manipulation (now due October 2010) Stage II of the project has commenced and includes an underground trial and demonstration of system, and concept design of an integrated logistics system Initial focus is to fully animate proposed system and examine issues associated with full automation of system in underground environment RDTG member companies identifying suitable site and continuous miner to conduct underground trial C18023 – Continuous Miner Automation Successfully demonstrated components of navigation system Stage II recently commenced and includes an underground trial of navigation system on Phoenix CM2010 Update August/September 2010

CM2010 Update August/September 2010 Current Projects C17010 - CM2010 Project Support Development of Roadway Development Handbook temporarily suspended to allow focus on providing project management support toToughSkin Continuing project support role proposed across all CM2010 related projects, including continuation of Roadway Development Operators’ Workshops to end 2012 CM2010 Update August/September 2010

New Projects Under Consideration Rapid Advance Conveyor Oregate Pty Ltd Automated Monorail Extension System Macquarie Manufacturing and UOW Automation and Robotics Group Development of FRAS Rated Polymeric conveyor Idler for Underground Coal Mines Ellton Longwall/Dotmar Engineering Plastics/Intelligent Polymer Research Institute (UOW) CM2010 Update August/September 2010