ERL Maintenance Support Sdn Bhd Environmental Achievements
REDUCE REDUCE REUSE REUSE RECYCLE RECYCLE E-MAS continues its 3R Philosphy as part of its commitment to environmental protection.
Modified existing installations to reduce building facilities power supply consumption Reduced operation time for lighting and air- conditioning system; timer-controlled Switched to energy saving lighting Building Energy Saving Programme
Lower building energy consumption RM800,000 less electricity used per year
Building Energy Saving Programme – Main Workshop
Trains are switched off during stabling As much driving as possible in coasting mode Brake early, with not more that 40% braking force Use the electrical regenerative brake Traction effort not more than 80% Train Operations Energy Saving
Lower energy cost per trip – 5.3% reduction RM487,000 less electricity used per year
Note : kWh increased after introduction of speed restrictions & additional train trips
Introduced environmental friendly train washing system 70-90% less chemicals, water & electricity used Looking into rain water collection from building roofs Train Washing Plant
Comparison between Kärcher & Britannia Train Washing System Train Washing System
Replacement of wheel from 200,000 kilometres to 2 million kilometres Purchase of new wheels reduced from 480 wheels to 50 per year Wheel Life Extension
Extending wheel life Savings of 120 tonnes of steel per year
Replacement of dampers from 1 million kilometres to 1.4 million kilometres, resulting in annual saving of RM80,000 Replacement of primary suspension from 600,000 kilometres to 1.4 million kilometres, giving annual saving of RM560,000 Dampers & Primary Suspension Life Extension
Overhaul exercise from 1.5 million kilometres to 3.0 million kilometres, resulting in saving of RM1.3 million per overhaul Gearbox Life Extension