Loads in SCED Comments submitted by Luminant Energy Company, LLC.

Slides:



Advertisements
Similar presentations
NAESB Measurement and Verification Model Business Practice Retail Electric Demand Response 5/29/09 update.
Advertisements

Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
NPRR 532 Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin David Kee CPS Energy Energy Supply & Market.
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Enhancing Interruptible Rates Through MISO Demand Response: WIEG Annual Meeting June 19, 2008 Presented by: Kavita Maini, Principal KM Energy Consulting,
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
April 23, 2014 DSWG Loads in SCEDv1 Load Participation in SCED v1 Overview & Refresher ERCOT Staff.
Floyd Trefny Director of Product Development Future of Demand Response In ERCOT A Presentation to the Workshop – September 15, 2006 Project Number
Load Resource Inputs to the Multi-Interval Real-Time Market ERCOT is requesting input from LRs and QSEs to enable running meaningful MIRTM simulations.
Market Based Solutions for Demand Response Providers Today and the Future Alice Jackson Occidental Energy Ventures Corp.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
ERCOT Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Section 5.9 – added export language Each ERS Generator site must have an interconnection agreement with its TDSP prior to submitting an ERS offer and must.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Nodal Protocol Revision Request (NPRR) TITLE: Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin March.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Co-ordination of Power Balance Penalty Curve, VOLL, SWOC for AS Demand Curves.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
August 8, 2013 Loads in SCED Workshop II Load Participation in SCED NPRR 555 ERCOT Staff Presentation.
MIRTM Temporal Constraints Discussion Loads in SCEDv2 Subgroup Jan. 8, 2016.
ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
SAWG Update to WMS September 2 nd, 2015 Brandon Whittle.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Future Ancillary Services Team (FAST) Update April 24, 2014 TAC Meeting 1.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
Analysis of August 13, 2015: ORDC, RRS & PRC Changes Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) November 13, 2015.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
A Broad Review of August 13, 2015 and Similar Historical Situations Luminant Energy January 22, 2016.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
Third Party DR Self-Deployment Loads in SCEDv2 Subgroup Sept. 18, 2015.
Analysis for the Determination of X, Y, and Z for Compliance Monitoring NATF.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Current FRRS Language & Explanation of Posted Data
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Congestion Management and Ramp Rate for Delivering Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Load Participation in SCED v1 Overview & Refresher
Presentation transcript:

Loads in SCED Comments submitted by Luminant Energy Company, LLC

Objective: Maximize opportunities for load participation from eligible existing and future load resources Create an economically efficient method for price formation associated with Load Real-time (RTM) energy bids

Key Issues: The proposed five-minute response time to SCED instruction may discourage participation from existing load control programs All load resources should be treated equitability and comparable to traditional resources (where practical)

Key Issues: Performance metrics should be reasonable, repeatable, verifiable, and benchmarked at least seasonally. Program design should, to the extent practicable, accommodate price sensitive loads that would otherwise engage in passive response.

Equitable Treatment: Response expectations consistent with achievable current program standards All Load Resources must submit or accept a proxy RTM Energy Bid and be dispatched by SCED Restoration time should be consistent with current requirements for loads Performance Stds, M&V No punishment for “over- performance” from energy products Capacity values should be tested and verified no less than seasonally Tested and qualified LRs should be benchmarked against metered or calculated capacity EFFICIENT AND INCLUSIVE MARKET DESIGN FOR LOADS For improved participation and price formation, focus on equitable treatment and achievable standards

Detailed Approach: Response Expectations Issue: Existing load response programs (e.g. interruptible thermostats, pool pumps, water heaters, etc) may take longer than 5-minutes to provide response. Proposed Solution: Allow loads to submit their five-minute ramp rate to be achievable over ten-minutes. Consequence of no action: Existing load control programs will likely not participate in Loads in SCED v.1

Detailed Approach: Equitable Treatment RTM Energy Bids Issue: Current protocols allow certain loads to be dispatched by out- of-market instructions, potentially dampening prices during times of scarcity. Proposed Solution: All load resources should be required to submit or accept an ERCOT proxy assigned a Real-time Energy Bid. Consequence of no action: Loads dispatched by an out of market instruction will continue to lower prices, potentially when the marginal benefit of an additional MW is approaching VOLL

Load Resources providing RRS RRS by High-set UFR Offline/Online Non-Spin Must submit or accept proxy RTM Energy Bids consistent with existing floors and ceilings for generators, and retain dispatcher control / frequency response of ancillary services Detailed Approach: Equitable Treatment RTM Energy Bids

Example: Deployment of RRS with RTM Energy Bids, SCED Dispatch Upon EEA Level 2, Release RRS to SCED. RTM Energy Bids for RRS capacity released to SCED shall be consistent with the appropriate ceilings and floors RTM Energy Bids will be slightly above SWOC, randomly separated by a penny, to ensure timely deployment of loads, as needed, by SCED, before RRS provided by generation resources

Retaining Reliability Tools The ERCOT dispatcher will retain control of the release of RRS Capacity to SCED, and Loads providing RRS via high-set under- frequency relays will still deploy to a drop in system frequency, until such capacity is dispatched in an Energy Emergency Alert Level II.

Equitable Treatment of Loads: Recovery after deployment Current Nodal Protocols * allow loads providing Non- Spin and RRS up to three hours to resume consumption. Luminant’s proposal retains this restoration time, but further stipulates that the deployed load should contribute to price formation as if it were any other deployed resource in the RT offer stack. (Deployed load added back to GTDB) * Section Paragraph (1) (d) & Section Paragraph (3) (e)

Update to Generation to be Dispatched (GTBD) A decrease in load associated with a successful deployment of a load resource (analogous to a decrease in system demand) will decrease GTDB, and move the System Lambda down the system incremental cost curve. Luminant proposes adding back deployed load resources to the GTBD calculation to ensure efficient price formation.

Performance Standards / M&V For Loads submitting Energy Bids(with no A/S responsibility) and/or providing Non-Spin Luminant proposes Base Point Deviation Charges for failure to respond to SCED curtailment. Multiple instances of failing performance metrics (CLREDP) should result in a disqualification of that Controllable Load Resource.

Performance Standards / M&V For RRS Ancillary Service Resource Responsibilities: Luminant maintains that the current penalties are sufficient to ensure adequate response. These include: Disqualification for repeated non-performance Potential report to TRE for non-compliance / potential administrative penalties.

Performance Standards / M&V However, to accommodate “blocky” loads and Controllable Load Resources not independently metered from passive load on the same meter, Luminant suggests eliminating penalties for “over- performance” for all Controllable Load Resources.

Total Metered Load = Net Power Flow = Powertelem, = C Total Available Load Resource Capacity, = MPC-LPC, determined by algorithm Passive, non- curtailable load, calculated as C-B A B LPC Total Metered Load, = Net Power Flow, = Powertelem, = C MPC LPC B A Passive Load Decreases Performance Standards: Example 1 In this example, if passive load curtails consumption coincident with a deployment of a Controllable Load Resource (CLR), the metered response may suggest that the CLR “over-performed” to a SCED instruction. MPC

Total Metered Load, = Net Power Flow, = Powertelem, = C Total Available Load Resource Capacity, = MPC-LPC, determined by algorithm Passive, non- controllable load, calculated as C-B A B LPC Base Point MPC Performance Standards: Example 2 In this example, if a load over-performs to its Base Point, Luminant suggests that this load is not subject to Base Point Deviation Charges. Luminant believes that absent this change, “blocky” loads will be discouraged from participating in Loads in SCED. A B MPC LPC Curtailment achieved

Measurement and Verification Numerous existing aggregations of residential controllable load are not independently metered. Interruptible thermostats, pool pumps, and other aggregated residential loads depend on a time of day / seasonal algorithm to determine available and achieved capacity in real-time.

Measurement and Verification To attract participation from existing load control programs, Luminant suggests that: – Controllable loads providing Ancillary Services not independently metered from passive loads behind the same meter qualify based upon a seasonal demonstration of the efficacy of the calculated capacity values. – Qualified controllable loads providing Ancillary Services are accountable for satisfying Controllable Load Resource Energy Deployment Performance (CLREDP * ). Multiple failures to meet CLREDP standards shall disqualify a CLR. * Consistent with the recommendations in this presentation, Luminant proposed modifying the CLREDP standards to only penalize under-response

Summary: Luminant’s proposal, as presented, is designed to Maximize participation of existing load aggregations, while Actively contributing to efficient price formation.

Summary Specifically, to create an equitable market for loads, Luminant suggests: – Establish performance expectations and verification requirements such that existing programs can participate Allow M&V by algorithm, and seasonal verification Remove penalties for over-performance for all loads Maintain current penalty structure for non- performance by loads with an RRS Ancillary Service Resource Responsibility

Summary Specifically, to create an equitable market for loads, Luminant suggests: – Require all controllable load resources either submit or accept by proxy a RTM Energy bid and be dispatched by SCED. Allow dispatcher deployment, and SCED dispatch of all Loads providing Ancillary Services Retain restoration time for CLRs providing RRS, while counting that deployed load as a dispatched resource in GTDB

Questions?