Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.

Slides:



Advertisements
Similar presentations
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Advertisements

FD support status N.Geffroy, G.Gaillard, B.Bolzon, A.Jeremie (and discussion with T.Kume)
1 LAViSta Laboratories in Annecy working on Vibration and Stabilisation Impact of random and determinist acoustic noise on vibrations at high frequencies.
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
Pre-isolator Update 18 th MDI Meeting F. Ramos, A. Gaddi, H. Gerwig, N. Siegrist December 17, 2010.
Simulations and measurements of the pre-isolator test set-up WG5 Meeting F. Ramos, A. Gaddi, H. Gerwig, N. Siegrist November 9, 2010.
Benoit BOLZON Nanobeam 2005 – Kyoto Active mechanical stabilisation LAViSta Laboratories in Annecy working on Vibration Stabilisation Catherine ADLOFF.
Stabilization of the FF quads A.Jeremie B.Bolzon, L.Brunetti, G.Deleglise, N.Geffroy A.Badel, B.Caron, R.Lebreton, J.Lottin Together with colleagues from.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
1 LAViSta Laboratories in Annecy working on Vibration and Stabilisation Catherine ADLOFF Andrea JEREMIE Jacques LOTTIN Benoît BOLZON Yannis KARYOTAKIS.
1 ATF2 project: Investigation on the honeycomb table vibrations Benoit BOLZON 33rd ATF2 meeting, 24th January 2007 Laboratories in Annecy working on Vibration.
ATF2 week meeting: Impact of cooling water on the final doublets vibrations Benoît BOLZON Laboratories in Annecy working on Vibration Stabilization 15/10/08.
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
1 ATF2 - IP Chamber Design and manufacturing of Chamber with high precision piezo actuators for high resolution BPMs Status / progress report – 26 June.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
IN2P3 Les deux infinis G. Balik, B. Caron, L. Brunetti (LAViSta Team) LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry,
IPBSM status and plan ATF project meeting M.Oroku.
A.Jeremie LAViSta: Laboratories in Annecy working on Vibration Stabilization Some information on the Stacis 2000 Table from CERN, currently in Annecy B.Bolzon,
Supports and Movers for ATF2 Magnets R. Sugahara KEK France and Japan Collaboration Meeting Feb , 2006.
ATF2 Magnets ATF2 Magnets KEK, 19 Dec 2006Cherrill Spencer, SLAC ATF2 Mag Design & Production 1 Design and Production Status of New ATF2 Magnets Cherrill.
QD0 stabilization L. Brunetti 1, N. Allemandou 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, C. Hernandez 2, (LAViSta.
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
1 ILC Push-Pull : Platform Marco Oriunno, SLAC ILD Workshop, Paris May 24, 2011.
CLIC QD0 Stabilization J. Allibe 1, L. Brunetti 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2,C.Hernandez 2 1 : LAPP-IN2P3-CNRS,
Vibration Measurement on the Shintake Monitor and Final Doublet Takashi Yamanaka (Univ. of Tokyo) Benoît Bolzon (LAPP) ATF2 weekly meeting 26 November,
CLIC MDI stabilization update A.Jeremie G.Balik, B.Bolzon, L.Brunetti, G.Deleglise A.Badel, B.Caron, R.Lebreton, J.Lottin Together with colleagues from.
BPM support and beam pipe length FD support status A.Jeremie.
SiD MDI Marco Oriunno, SLAC ALCPG11 Eugene- Oregon, March 2011.
ATF2 Magnets ATF2 Magnets 27/28 Feb 2007Cherrill Spencer, SLAC. Info for QC3 machining discussion 1 Information for discussion about how to enlarge the.
Update of a ground motion generator to study the stabilisation usefulness of ATF2 final focus quadrupoles 1 Benoît BOLZON B. Bolzon, A. Jeremie (LAPP)
QF1 vibration status A.Jeremie A.Jeremie, N.Geffroy, drawings by Araki-san.
1 SiD Push-pull Plans Marco Oriunno, SLAC International Workshop on Linear Colliders 2010 Geneva, October 2010 M.Oriunno, IWLC10 – Geneva, Oct.2010.
FD support Andrea JEREMIE N.Geffroy, B.Bolzon, G.Gaillard.
How high frequency we care if we need the stabilization of 1nm level?
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
1 ATF2 Project Meeting December 2006 Ground Stabilisation with the CERN STACIS 2000 Stable Active Control Isolation System LAViSta Laboratories in.
GM sensor tests and installation A.Jeremie K.Artoos, D. Kudryavtsev, Y.Renier, R.Tomas-Garcia, D.Schulte.
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 1 Status Report on the ATF2 “Final Doublet” magnets: 2.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
Vibrations studies for the nominal optics and the ultra-low beta optics Benoît BOLZON 1 B. Bolzon, A. Jeremie (LAPP) P. Bambade, Y. Renier (LAL) A. Seryi.
STATIC AND MODAL BEHAVIOUR OF THE CLIC MAIN BEAM BPM SUPPORT M. Esposito, EN-MME The research leading to these results has received funding from the European.
ATF2 Meeting December Andrea JEREMIE1 France/ATF2 kick-off meeting in Annecy October participants from 3 regions! LAPP/Annecy in.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
Progress of Shintake Monitor (ATF2 IP-BSM) KEK site meeting 2008/10/31 Takashi Yamanaka.
Vibration measurements with and without Monalisa 15/07/09 Benoît BOLZON (LAPP) David Urner (Oxford) Paul Coe (Oxford) 1 Benoît BOLZON.
A_RD_2 The ATF2 KEK Final Focus prototype of the linear electron machine May 16 th 2008 Marc Verderi (LLR) for KEK, Saga Uni., Tohoku Univ.,
1 A_RD_2A_RD_2 Design of the linear collider machine-detector interface and ATF-2 at KEK Ph.Bambade, J.Brossard, O.Dadoun, C.Rimbault, M.Alabau Pons, A.Jeremie,
FF Stabilisation A.Jeremie (Summary of things learned and work done at LAPP, CERN, SYMME, Oxford, SLAC)
QD0 Stabilisation L. Brunetti 1, J. Allibe 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, A. Badel 2, R. Le Breton.
Alignment and stability session
S-BPM Support Issues to be discussed with LAPP and KNU
Summary FD Support System
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Active isolation Target : a low cost dedicated table
A.Jeremie, B.Bolzon, N.Geffroy, C.Girard, (G.Gaillard)
Laboratories in Annecy working on Vibration Stabilization
ATF2: final doublet support
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Status of ATF2 FD Magnets and Info on their FFTB supports & mover
A.Jeremie Some drawings from different CLIC’08 presentations
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
A.Jeremie, B.Bolzon, N.Geffroy
FD supports A.Jeremie.
IP configuration session
Fixed Support Design & Testing
Presentation transcript:

Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For measurement details: see Benoit Bolzon’s presentation tomorrow

Outline FD support specifications Initial active support study Rigid support on intermediate feet Final rigid support Installation photos Conclusion

SBPM QC3 SBPM FFTB 2.13 S3.00 SF1QF SBPM QC3 SBPM FFTB 2.13 S3.00 SD0QD IP 1940 mm 1225 What is needed to support all these components? Shintake Monitor: information on the beam size Final doublets FD layout Not the latest drawing!

For QD0 at ATF2: 6-7nm tolerance Two solutions possible: 1.Isolate/cut vibrations in the desired frequency range 2.Push the first resonance peaks at higher frequencies where ground motion is lower 0.1Hz ~100Hz Repetition rate 1Hz=> need a “mechanical” stabilisation from 0.1Hz (below, the beam based alignment works) 6-7nm ATF2 specifications ATF ground motion

FD support specifications Desired frequency range : 0.1Hz-100Hz Support that can evolve as Final Focus design evolves (should be able to change support) 6-7nm jitter tolerance 1.2m beam height Honeycomb table Isolator: Passive => turned OFF Active => turned ON Initial suggestion: CERN wanted to contribute by sending the commercial TMC table

Vibrations of the passive TMC table Vertical direction: Integrated RMS Above 0.5Hz: Amplification Above 30Hz: damping begins Below 0.5Hz: No amplification or damping on the table 27 Amplification 0.5 ~Same response Amplification Damping 30

Vibrations of the active TMC table Above 0.8Hz: Damping on the table  Factor 7 of damping above 1.5Hz Vertical direction: integrated RMS Below 0.8Hz: Amplification on the table Need to look for an alternative solution

Ground Shintake monitor Final doublets Beam Interference fringes We want the measurement to have a coherent behaviour with respect to the “beam” => Relative motion between Shintake monitor and final doublets: 6-7nm in the vertical axis above 0.1Hz 4m Good ground motion coherence: measured on KEK site  Separate stiff supports rigidly fixed to the floor Back to basics: Specifications Study the honeycomb block but without active feet If Shintake Monitor and FD on separate active supports, coherence is lost

 Empty: 56.2Hz  with FD weight: 26.2Hz Study of the block on 4 feet (free-free configuration: 1st peak at 230Hz) In the middle of : 0.1Hz-100Hz! Simple simulation (plain block) Measurements Empty: 74Hz With FD weight: 46Hz Do these peaks come from the block or the feet? Total relative motion ([0.17; 100]Hz): 6.7nm  Above tolerances (6nm)! Contribution of the peak alone: [10; 100]Hz: 5.7nm

Modal deformation measurements Block fixed on 4 feet Impact hammer on different points => Modal deformation for each resonance up to 150Hz in 3 axes 2 tri-axial accelerometers Michael GUINCHARD (CERN) Z X Y The block is rigid (no deformations), but the feet allow it to “jump” around

Modes1) T-X2) T-Y3) R-Z4) T-Z5) R-Y6) R-X Frequency (Hz) Damping (%) first modes: rigid body modes (6 degrees of freedom)  Keep the rigid block (no deformation in x,y nor z) but remove the 4 feet to cut these modes T: Translation R: Rotation  Empty: 526.1Hz  with FD weight: 135.2Hz Block fixed to the floor on its entire surface simulation Modal deformation results The peaks are outside the interval: 0.1Hz - 100Hz

IP QD0 SF1 QF1 SD0 Room for slings Final assembly Quads, sextupoles and movers :SLAC (from FFTB) From floor to mover: LAPP (new) BPM+support: KNU, LAPP 2.4m Adjustment possible in x, y, z with shims (0.05mm) and adjustment pushers for 1.2m beam height beeswax: good vibration transmission, easy to unglue, stable in time, rad hard

Block fixed on one entire face to the floor Experimental set-up 3 steel plates bolted to the floor Honeycomb table Bees wax  Good boundary conditions chosen for the block: Relative motion should be very low compared to tolerances No masses: no peak With masses: 92Hz

Impact of the resonance peak on the RMS ObjectPeak positionIntegrated RMS 4-feet table with weight 41Hz5.7nm Glued table with weight 92Hz0.3nm Sextupole on mover/support 100Hz0.26nm Quad on mover/support 76Hz1.1nm Adding up the integrated rms values keeps us under the 6- 7nm tolerances The honeycomb table fixed to the floor on whole surface, with adjusted movers validated for ATF2 Final Doublet support measured in Annecy

For the measurements at KEK see Benoit Bolzon’s presentation tomorrow

Installation at KEK from September 16 to September

Unpacking Check height at each step of installation Installing the steel plates Shims against floor inhomogeneities

Installing beeswax on plates bolted to the ground Table comes down Installing “feet” and movers Great team-work

QD0 comes down QD0 installed Everything installed, centered and aligned in x, y and z, Thursday September ; Next step: BPM installation

Adjustable in beam direction Adjustable in height with shims Adjustable longitudinally through the attachment screw Al SS S-BPM  20kg BPM supports S-BPM machined, tested and delivered by KNU

S-BPM installed October 15, 2008 We have to make sure everybody uses the same and correct/measured distances for the S- BPM readout point

FD mid-november 2008

ATF2 rigid Final Doublet support chosen (vs. active support) SLAC FFTB movers adjusted to meet beam height Vibration measurements validate the rigid support choice ATF2 Final Doublet support installed at KEK Conclusion

Thank you for the available, helpful and competent KEK team during our stay

Back-up

Integrated RMS of relative motion between table and floor to predict on the ATF site Calculation performed for these specific needs: Calculation to perform by integrating the vibratory behaviour of the table measured at LAPP and the data of ATF ground motion Relative motion between table and floor