1 ITER Test Blanket Module (TBM) Current U.S. Designs, Plans, Issues, and Material R&D Needs Prepared by: Presented at the MASCO meeting Washington DC,

Slides:



Advertisements
Similar presentations
1 Summary Slides on FNST Top-level Technical Issues and on FNSF objectives, requirements and R&D Presented at FNST Meeting, UCLA August 18-20, 2009 Mohamed.
Advertisements

Frame design Status TB-SWG May 2005 Presented by K. Ioki Prepared by M. Morimoto VV and Blanket Division, ITER Garching ITER.
First Wall Heat Loads Mike Ulrickson November 15, 2014.
What is Dual Coolant Blanket? Siegfried Malang 2 nd EU-US DCLL Workshop2 nd EU-US DCLL Workshop University of California,University of California, Los.
Presented by: S. Suzuki, Blanket Engineering Lab., Japan Atomic Energy Research Institute, JAERI Contents 1.Outline of blanket development in JAERI 2.Design.
September 15-16, 2005/ARR 1 Status of ARIES-CS Power Core and Divertor Design and Structural Analysis A. René Raffray University of California, San Diego.
US TBM Activities Update 1- Quick background 2- Recent Activities Mohamed Abdou FNST Meeting held at UCLA, August 2-4,
FNSF Blanket Testing Mission and Strategy Summary of previous workshops 1 Conclusions Derived Primarily from Previous FNST Workshop, August 12-14, 2008.
First Wall Thermal Hydraulics Analysis El-Sayed Mogahed Fusion Technology Institute The University of Wisconsin With input from S. Malang, M. Sawan, I.
June 14-15, 2005/ARR 1 Status of ARIES-CS Power Core Engineering A. René Raffray University of California, San Diego ARIES Meeting UW June 14-15, 2005.
January 11-13, 2005/ARR 1 Ceramic Breeder Blanket Coupled with Brayton Cycle Presented by: A. R. Raffray (University of California, San Diego) With contributions.
Suggested US Plans and Strategy for ITER Test Blanket Mohamed Abdou Presented at APEX/TBM Meeting, UCLA, November 3-5, 2003.
Summary of Current Test Plan for US DCLL TBM in ITER Neil Morley and the US TBM Participants INL, August
November 4-5, 2004/ARR 1 ARIES-CS Power Core Options for Phase II and Focus of Engineering Effort A. René Raffray University of California, San Diego ARIES.
November 8-9, Blanket Design for Large Chamber A. René Raffray UCSD With contributions from M. Sawan (UW), I. Sviatoslavsky (UW) and X. Wang (UCSD)
THERMOFLUID MHD for ITER TBM. CURRENT STATUS By UCLA Thermofluid MHD GROUP Presented by Sergey Smolentsev US ITER TBM Meeting UCLA May 10-11, 2006.
June19-21, 2000Finalizing the ARIES-AT Blanket and Divertor Designs, ARIES Project Meeting/ARR ARIES-AT Blanket and Divertor Design (The Final Stretch)
A design for the DCLL inboard blanket S. Smolentsev, M. Abdou, M. Dagher - UCLA S. Malang – Consultant, Germany 2d EU-US DCLL Workshop University of California,
US ITER TBM Meeting Idaho Fall, Idaho, Aug M Dagher P Fogarty 1.TBM/ITER General Arrangement 2.Equatorial Test port Configuration 3.Test Port.
Status of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray ARIES Meeting PPPL, NJ Sept.
Thermofluid MHD issues for liquid breeder blankets and first walls Neil B. Morley and Sergey Smolentsev MAE Dept., UCLA APEX/TBM Meeting November 3, 2003.
March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented.
The effect of the orientations of pebble bed in Indian HCSB Module Paritosh Chaudhuri Institute for Plasma Research Gandhinagar, INDIA CBBI-16, Sept.
2 nd EU-US DCLL Workshop University of California, Los Angeles, Nov th, 2014.
Power Extraction Research Using a Full Fusion Nuclear Environment G. L. Yoder, Jr. Y. K. M. Peng Oak Ridge National Laboratory Oak Ridge, TN Presentation.
Strawman R&D Tasks and R&D Costs Neil Morley and Alice Ying INL, August
ITER Test Blanket Module and the Need for Coordination Outline What ITER means for the World Technology / Chamber / Blanket Community ITER Plans for TBM.
Overview of LLCB TBM for ITER Paritosh Chaudhuri Institute for Plasma Research Gandhinagar, INDIA CBBI-16, Sept. 2011, Portland, USA.
1 Recent Progress in Helium-Cooled Ceramic Breeder (HCCB) Blanket Module R&D and Design Analysis Ying, Alice With contributions from M. Narula, H. Zhang,
Briefings to the Materials Community on ITER Test Blanket Module (TBM) Mohamed Abdou August 11, 2003 Outline 1.What is going on with ITER and TBWG 2.Other.
Fusion: Bringing star power to earth Farrokh Najmabadi Prof. of Electrical Engineering Director of Center for Energy Research UC San Diego NES Grand Challenges.
MHD Modeling and Experiments at UCLA for the ITER Test Blanket Program N. Morley, M. Abdou, A. Ying, S. Smolentsev, M-J. Ni, T. Sketchley, J. Burris, M.
October 27-28, 2004 HAPL meeting, PPPL 1 Thermal-Hydraulic Analysis of Ceramic Breeder Blanket and Plan for Future Effort A. René Raffray UCSD With contributions.
1 Solid Breeder Blanket Design Concepts for HAPL Igor. N. Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI With contributions.
1 U.S. Presentation in TBWG-16 Beijing, China November 15 – 17, Overview of R&D, Time Schedule, and Cost Estimation M. Abdou (25 min.) 2.Possible.
1 VLT Research Highlights ITER Test Blanket Module (TBM) M. Abdou and the ITER-TBM Team Outline 1.Introduction and TBWG activities 2.Technical planning.
February 5-6, 2004 HAPL meeting, G.Tech. 1 HAPL Blanket Strategy A. René Raffray UCSD With contributions from M. Sawan and I. Sviatoslavsky UW HAPL Meeting.
MHD/Heat Transfer considerations for SiC FCI in DEMO and ITER Sergey Smolentsev DCLL Special Meeting at UCLA April 23-24, 2007.
ITER test plan for the solid breeder TBM Presented by P. Calderoni March 3, 2004 UCLA.
Tritium Extraction from a DCLL Blanket Prepared by: Scott Willms (LANL) Collaborators: Brad Merrill (INL), Siegfried Malang (Consultant), Clement Wong.
Conference Call, June 23, 2005 Remarks on US Costing Activities for the US ITER-TBM Mohamed Abdou.
US Test Blanket Module Partially Integrated Testing Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for.
Base Breeding Blanket and Testing Strategy In FNF Conclusions Derived from Previous FNST Workshop, August 12-14, 2008.
Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,
An ITER-TBM Experimental Thrust for ReNeW Themes III and IV Neil B. Morley, Mohamed Abdou, Alice Ying (UCLA); Mohamed Sawan, Jake Blanchard (UW); Clement.
Status of MHD/Heat Transfer Analysis for DCLL US-ITER TBM Meeting February 14-15, 2007 Rice Room, Boelter Hall 6764, UCLA Thermofluid / MHD group Presented.
Materials Integration by Fission Reactor Irradiation and Essential Basic Studies for Overall Evaluation Presented by N.Yoshida and K.Abe At the J-US Meeting,
Various Strategies for DCLL in the US Technology Program Poor ITER utilization (Lowest Cost Scenario) - Support EU HCLL effort, no independent DCLL TBM.
Review of Thermofluid / MHD activities for DCLL Sergey Smolentsev & US TBM Thermofluid/MHD Group 2006 US-Japan Workshop on FUSION HIGH POWER DENSITY COMPONENTS.
UCLA - March 8, 2006 US TBM Cost Estimate Status March 8, 2006 Tom Mann.
DCLL Thermofluid/MHD R&D Sergey Smolentsev, Neil Morley and the ITER- TBM thermofluid group US ITER-TBM Meeting August 10-12, 2005 INEL.
March 3-4, 2005 HAPL meeting, NRL 1 Assessment of Blanket Options for Magnetic Diversion Concept A. René Raffray UCSD With contributions from M. Sawan.
1 Discussion with Drs. Kwon and Cho UCLA-NFRC Collaboration Mohamed Abdou March 27, 2006.
Overview of the US ITER Test Blanket Module (TBM) Technical Plan
1 A Self-Cooled Lithium Blanket Concept for HAPL I. N. Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI With contributions.
HAPL June 20-21, Overview of Chamber/Blanket Work Presented by A.R. Raffray UCSD With contributions from CTC Group and MWG Blanket contributions:
Highlights of US ITER TBM Technical Plan and Cost Estimates (and Impact of International Collaboration) Mohamed Abdou and the U.S. Team TBWG-17 Presented.
Thermal-hydraulic analysis of unit cell for solid breeder TBM
US Participation in the
Material Issues for the US ITER-TBM Program
DCLL TBM Reference Design
ITER Test Blanket Module (TBM)
Integrated Design: APEX-Solid Wall FW-Blanket
University of California, San Diego
U.S. Presentation in TBWG-16 Beijing, China November 15 – 17, 2005
Overview and Meeting Objectives
Status of ARIES-CS Power Core Engineering
VLT Meeting, Washington DC, August 25, 2005
Mohamed A. Abdou Summary, Approach and Strategy (M. Abdou)
University of California, San Diego
Presentation transcript:

1 ITER Test Blanket Module (TBM) Current U.S. Designs, Plans, Issues, and Material R&D Needs Prepared by: Presented at the MASCO meeting Washington DC, August 23-24, 2005 M. Abdou, A. Ying, N. Morley, C. Wong D. Sze, S. Malang, S. Smolentsev M. Sawan, M. Dagher, P. Calderoni, B. Merrill

2 Outline I. ITER Plans ITER basic device components for TBM and support systems and ITER/TBM interface. What the International Partners (TBWG), including US, agreed to. II. U.S. Current Plans (as they have evolved during the past year) TBM options and strategy. Description of designs of TBM test articles. External loops and ancillary equipment (piping, heat exchangers, tritium extraction, etc.). III. TBM key requirements related to materials IV. What is needed from the Materials Program R&D for TBM. R&D for higher performance TBM and Power Plants.

3 What is the ITER TBM Program? Integrated testing of breeding blanket and first wall components and materials in a Fusion Environment Breeding Blankets/FWs will be tested in ITER, starting on Day One, by inserting Test Blanket Modules (TBMs) in specially designed ports. Each TBM will have its own dedicated systems for tritium recovery and processing, heat extraction, etc. Each TBM will also need new diagnostics for the nuclear-electromagnetic environment. Each ITER Party is allocated limited space for testing two TBMs. (Number of Ports reduced to 3. Number of Parties increased to 6). ITER’s construction plan includes specifications for TBMs because of impacts on space (port, port area, hot cell, TCWS), shielding, vacuum vessel, remote maintenance, ancillary equipment, safety, availability, etc. The ITER Test Program is managed by the ITER Test Blanket Working Group (TBWG) with participants from the ITER International Team and representatives of the Parties. (However, this entity may change under the new international agreement being negotiated.)

4 Blanket Testing in ITER is essential Achieve a key element of the “ITER Mission” “demonstrate the scientific and technological feasibility of fusion power for peaceful purposes” “test tritium breeding module concepts that would lead in a future reactor to tritium self-sufficiency, the extraction of high grade heat, and electricity production” Achieve the most critical milestone in fusion nuclear technology research: testing in the integrated fusion environment –This has been the focus of the US Technology Program for a long time. It is the first real opportunity to apply the results of R&D from the past 30 years on blankets, materials, PFC, etc. The ITER TBM project provides a driving force to bring Fusion Nuclear Technology R&D the first step toward reality Develop the technology necessary to install breeding capabilities to supply ITER with tritium for its extended phase of operation Resolve the critical “tritium supply” issue for fusion development - and at a fraction of the cost to buy tritium for large D-T burning plasma

5 “Test tritium breeding module concepts that would lead in a future reactor to tritium self-sufficiency, the extraction of high grade heat, and electricity production.” 1.validation of TBM structural integrity under combined and relevant thermal, mechanical and electromagnetic loads 2.validation of Tritium breeding predictions 3.validation of Tritium recovery process efficiency, tritium control and inventories 4.validation of thermal predictions for strongly heterogeneous breeding blanket concepts with volumetric heat sources 5.demonstration and understanding of the integral performance of the blanket components and material systems TBM Mission Specific TBM Test Objectives in ITER:

6 ITER Operation ITER operation starts in It has HH operation (~3yr), DD phase (~1yr), low duty cycle DT (~3yr), high duty DT (~3yr) The ITER schedule shows Test Blanket Module operating in the device from Day 1 The ITER International Partners agreed on a general strategy for each blanket concept: 4 sequential test articles corresponding to the 4 modes of ITER operation Average fluence: 0.09 MWy/m 2 after 10 years; 0.3 MWy/m 2 after 20 years

7 TBWG agreed to allocate the 3 test ports by blanket concept, not by party Port # 16: Helium-cooled Ceramic Breeder TBMs (all Parties) Port # 18: Helium-cooled Lithium Lead /Dual Function Lithium Lead TBMs (EU/China) Water-Cooled Ceramic Breeder TBM (Japan) Port # 2: Dual-Cooled Lithium Lead /Dual Function Lithium Lead TBMs (US/China) Li-Breeder TBMs (RF, KO) Helium-Cooled Ceramic Breeder TBM (only if a liquid breeder option does not make it) Note: The interface with ITER device & facilities has been fixed (7/2005)

8 VV Port Extension VV – Cryostat Duct Cryostat Bio-Shield TBM Frame Assy VV Closure Plate Pb-Li Concentric Pipe Transporter Port Cell Area Bio-Shield Port Opening Pb-Li Primary Coolant Loop Ancillary system TBM Plasma ITER test port configuration has been fixed (by ITER & TBWG) (U.S. DCLL TBM is shown for illustration of how a TBM fits into this configuration)

9 Port plug = Frame + TBMs Frame = FW structure + Box structure + Backside shields Cut-view Vertical cross-section of Frame (at the center of flexible supports) TBM Frame Assembly Vertical Port Frame Opening space for TBM Backside Shield 20 Test Blanket Module 20 mm gap all around inside frame openings Unit: mm Port can be divided vertically or horizontally The maximum size of a test module (half vertical port) is 1.66m x 0.484m (TBM maximum first wall area is 0.8m 2 ) Configuration (and size) of TBM within ITER Test Port

10 II. Current U.S. TBM Plans TBM selected concepts and strategy. Description of designs of TBM test articles. External loops and ancillary equipment (piping, heat exchangers, tritium extraction, etc.) US TBM plans evolved during the past year through technical studies, interactions with the community, VLT and DOE, as well as interactions with the international ITER partners and our work within TBWG.

11 US TBM Selected Concepts 1. The Dual-Coolant Pb-17Li Liquid Breeder Blanket concept with self- cooled Pb-Li breeding zone and flow channel inserts (FCIs) as MHD and thermal insulator -- Innovative concept that provides “pathway” to higher outlet temperature/higher thermal efficiency while using ferritic steel. -- US lead role in collaboration with other parties (most parties are interested in Pb-Li as a liquid breeder, especially EU and China). -- Plan an independent TBM that will occupy half an ITER test port with corresponding ancillary equipment. 2. The Helium-Cooled Solid Breeder Blanket concept with ferritic steel structure and beryllium neutron multiplier, but without an independent TBM -- Support EU and Japan efforts using their TBM structure & ancillary equipment -- Contribute only unit cell /submodule test articles that focus on particular technical issues

12 Dual Coolant Lead-Lithium (DCLL) FW/Blanket Concept Idea of “Dual Coolant” concept – Push towards higher performance with present generation materials (FS)  Ferritic steel first wall and structure cooled with helium  Breeding zone is self-cooled Pb-17Li  Structure and Breeding zone separated by SiCf/SiC composite flow channel inserts (FCIs) that Self-cooled Pb-17Li Breeding Zone He-cooled steel structure SiC FCI DCLL Typical Unit Cell  Provide thermal insulation to decouple Pb-17Li bulk flow temperature from ferritic steel wall  Provide electrical insulation to reduce MHD pressure drop in the flowing liquid metal Pb-17Li exit temperature can be significantly higher than the operating temperature of the steel structure  High Efficiency

13 US DCLL TBM module SS frame Front Back Be front face FS structure FCI is the Thermal and MHD Insulator lining all PbLi channels He out He in PbLi in PbLi out All structures are 8MPa self-cooled PbLi flows in poloidal direction PbLi in PbLi out FW He counter flow

14 FW He Coolant Manifolds FW He Coolant Channels Pb-Li Outlet Pipe Pb-Li Inlet Pipe Pb-Li Inlet Manifold Plasma Facing First Wall Pb-Li Flow Separation Plate with He coolant Channels FCI Pb-Li Inlet Flow Channel Pb-Li Return Flow Channel Bottom Plate He Coolant Channels

15 DCLL TBM Calculated Temperatures Nominal (reference) operation (350  C<He<450  C;370  C<PbLi<470  C) FS/PbLi=462  C SiC/PbLi=470  C Calculations performed at k=15 W/m-K (not so important),  =20 S/m High performance (example) (350  C<He<450  C;450  C<PbLi<620  C) FS/PbLi=482  C SiC/PbLi=607  C Calculations performed at k=3 W/m-K (reduced to minimize heat losses into He,  =20 S/m He/FS FS/PbLi PbLi/SiC SiC/PbLi

16 DCLL Design Temperatures For both TBM and power reactor design, the following temperature limits were designed to and can be achieved: TBM Reference operation Higher performance operation FS T max ≤ 550° C ≤ 550° C FS/PbLi < 500° C < 500° C SiC/PbLi < 500° C < 700° C SiC T max < 500° C < 700° C 350° C < He < 450° C 350° C < He < 450° C 370° C < PbLi ≤ 470° C 450° C < PbLi ≤ 650° C For the DCLL TBM higher PbLi exit temperature ~650° C can be achieved via the bypass loop without requiring high-temperature materials for external piping/HX/TX. High-temperature materials (compatible with Pb-17Li up to 700° C) will be needed for the external lead lithium loop (HX/TX tubes) ONLY for the high performance power plant (NOT for TBM, and NOT for moderate performance power plants)

17 DCLL TBM Bypass Loop Schematic DCLL TBM PbLi mixing tank Pump Valve off bypass line 8 MPa Helium loop PbLi loop 400 C 470 C 400 C 30.3 kg/s 0 kg/s 0.4 MW Tritium extraction tank PbLi/He Heat Exchanger 180 C 300 C Concentric pipe with FCI Higher PbLi exit temperature can be achieved without requiring high- temperature materials for external piping/HX/TX. This can be achieved by turning the bypass valve “on” to allow mixing a lower temperature stream with the high-temperature stream in the PbLi mixing tank

18

19 Helium-Cooled Ceramic Breeder (HCCB) Blanket/First Wall Concept for TBM Idea of “Ceramic Breeder” concepts – Tritium produced in immobile lithium ceramic and removed by diffusion into purge gas flow  First wall / structure / multiplier /breeder all cooled with helium  Beryllium multiplier and lithium ceramic breeder in separate particle beds separated by cooling plates  Temperature window of the ceramic breeder and beryllium for the release of tritium is a key issue for solid breeder blanket. Schematic view of an example ITER HCCB test blanket submodule showing typical configuration layout of ceramic breeder, beryllium multiplier and cooling structures and manifolds  Thermomechanical behavior of breeder and beryllium particle beds under temperature and stress (and irradiation) loading affects the thermal contact with cooled structure and impacts blanket performance  Nuclear performance and geometry is highly coupled and must be balanced for tritium production and temperature control Side Wall

20 Ceramic Breeder TBM Inserting “US” unit cells into the EU HCPB structural box Unit (mm) Electromagnetics/Neutronics unit cell design

21 Example: DCLL TBM Testing Schedule in ITER (4 sequential test articles) ITER Year ITER Operation Phase Magnet testing & vacuum HH- First Plasma HH DD Low Duty DT Low Duty DT Low Duty DT High Duty DT High Duty DT High Duty DT Progressive ITER Testing Conditions Toroidal B field Vacuum Heat flux B Field Disrup- tions Small neutron flux NWL Full disruption energy Fluence Accumula -tion Electromagnetic/ Structural (EM/S) TBM Install RH System check- out Transient EM Loading on structure and FCIs FW heat flux loading ITER field perturbation LM-MHD tests Nuclear Field/ Tritium Prod. (NF/TP) TBM  Finalize Design Nuclear field Tritium production Nuclear heating Structure and FW heating Thermofluid/ MHD (T/M) TBM  Finalize Design Thermal and electrical insulation Tritium permeation Velocity profiles Integrated (I) TBM  Finalize Design High temperature effects Tritium permeation/recovery Integrated function, reliability

22 DCLL TBM Pre-ITER Schedule to deliver test module one year before ITER Day One of operation

23 HCCB TBM Pre-ITER Schedule to deliver test submodule one year before ITER Day One of operation

24 III. TBM Key Requirements Related to Materials

25 TBM Materials and Key Parameters Materials: Maximum fluence < 0.09 MWy/m2 (< 1 dpa) Neutron wall load: ~ 0.8 MW/m 2 Ferritic Steel: maximum temperature < 550 ° C Surface heat flux:maximum 0.5 MW/ m 2 (local) design average 0.3 MW/m 2 maximum number of pulses: < 30,000 cycles FS/PbLi interface < 500 ° C SiC/PbLi < 600 ° C (~500 ° C also o.k.) -- DCLL: Ferritic Steel, PbLi, He, FCI (SiC or Sandwich type) -- HCCB: Ferritic Steel, Be, Ceramic Breeder (Li 2 TiO 3 or Li 4 SiO 4 ), He coolant, He purge

26 Relevant MHD issues for US DCLL that impact material requirements and performance  MHD Pressure drop is a serious concern for inboard LM blankets in high field, high power density reactors. Even moderate, but non-uniform, MHD pressure drops (arising from flaws for example) can seriously affect flow balance between parallel channels leading to hot channels  MHD velocities profiles can exhibit strong jets next to regions of stagnation and even reversed flow  Non-uniform volumetric heating can cause natural convection flows that MHD effects do not damp – can swamp forced flow velocity in slow moving breeder zone regions  Turbulence/stability modification and suppression by MHD forces and joule dissipation will likely affect performance Ha and Re numbers ~1-3 x 10 4 All of these MHD issues strongly influence heat transfer, corrosion, tritium permeation, material requirements, and ultimate design.

27 Optimization of FCI Properties  Properties of the FCI need to be optimized in order to address competing requirements:  reduce MHD pressure drop to acceptable levels  minimize heat losses from PbLi to helium coolant  minimize temperature drop across the FCI (thermal stress)  limit RAFS/PbLi interface temperature  minimize corrosion rate ▪ minimize tritium diffusion  Optimal mix of thermophysical & mechanical properties depends strongly on the thermofluid MHD and will be determined by R&D and design tradeoffs  Properties given on another slide give some approximate goals and requirements for SiC development for the FCI  =500 1/Ohm-m Effect of  on MHD jet formation Velocity normalized to v ave = 0.1 m/s B = 4 T

28 Pressure equalization opening makes the pressure on both sides of the FCI equal, resulting in almost no primary stresses. The opening is either a slot (PES) or a row of holes (PEH). Analysis shows significant MHD pressure drop reduction with FCI as compared to the case without insulation: a factor of 10 at  = 500 S/m (acceptable) a factor of at  = 5 S/m (desired) Effectiveness of SiC f /SiC FCI as Electric/Thermal Insulator depends on the Thermophysical properties And Design of FCI (e.g PES VS. PEH and location relative to magnetic field) B-field X (poloidal) He flows Pb-17Li bulk flow Pb-17Li gap flow PES Fe wall FCI

29 Desired Flow Channel Insert Properties  Low transverse electrical and thermal conductivity of the SiC/SiC  Goal ~1-10 S/m transverse electrical conductivity, Acceptable <500 S/m for TBM operation  Goal ~2-5 W/mK transverse thermal conductivity, Acceptable <15 W/mK for TBM operation  The inserts need to be compatible with flowing Pb-17Li  Goal ~800°C, Acceptable 500°C for initial TBM operation  Liquid metal must not “soak” into pores of the composite (or foam) in order to avoid increased electrical conductivity. In general, closed porosity and/or dense SiC layers are required on all surfaces of the inserts.  Secondary stresses and deformation caused by temperature gradients must not endanger the integrity of FCIs.  Goal 200°C temperature difference, Acceptable 100°C temperature difference for initial TBM operation  The insert shapes needed for various flow elements must be fabricable  Basic box-channel element  Cross sections up to 150 x 150 mm for TBM  Lengths mm for TBM

30 IV. What is needed from the Materials Program DCLL Solid Breeders A) R&D for TBM B) R&D for Power Plants B1) Moderate Performance B2) Higher Performance -- R&D for TBM

31 Material Application for FCI (and associated external piping, HX, and TX) for TBM and Power Plants TBMPower Plants ReferenceHigher Performance* Moderate Perfor- mance Higher Perfor- mance FCI SandwichYesN/AYesN/A FCI Mod. Temp SiC (500°C) (X) YesN/AYesN/A FCI High Temp SiCNoYesNoYes Advanced Materials for HX and TX tubes No (use bypass / mixing tank) NoYes (X) Requirements on σ and к for the moderate temp SiC FCI are less demanding than those for high-temperature, high performance SiC FCI * If development of high temperature SiC for power plants is available around , a higher performance TBM can be considered for later stages of ITER testing.

32 A. Needs for the DCLL TBM a)Development of flow channel inserts for thermal and electrical insulation inserts made of SiC-composite suitable for moderate temperature (< 500ºC) inserts made of sandwich-structure (i.e. steel-alumina-steel, welded at all edges), back-up solution in case the SiC inserts can not be developed in time, suitable for lead lithium exit temperatures up to 500ºC (defer this until after the first MHD tests around 2008) for higher performance TBM: SiC FCI for high temperature (up to 650°C) lead lithium at the exit b)Fabrication of the TBM structure from RAFS (F82H or EUROFER) including forming of the complicated structure (i.e. FW panel), welding (diffusion, TiG, Laser, electron beam), PWHT. Most of these steps are under development in the EU and Japan, and the alternative is therefore to either procure from their industry, or to develop the required technology in the US (Iteration with the detailed TBM design will be needed)

33 A. Needs for the DCLL TBM (cont’d) c)Code-qualification of the RAFS and the welds for ITER applications d)Development of suitable FE-codes for the analysis of the steel/Pb-17 Li compatibility tests and the extrapolation of these results to the conditions in a blanket ( flow conditions, impact of magnetic field, suitable criteria for determining temperature limits) e)Data base for the compatibility of Pb-17 Li with RAFS and SiC-composites (e.g. forced convection loop with temperature gradients in flow direction, measurement of depositions, impact of irradiation) f)Recommendations regarding suitable materials for the external lead-lithium loop including limits on the allowable interface temperatures (maximum lead lithium temperature 470ºC).

34 B. DCLL Material R&D for Power Plants Two kinds of operation of the DCLL blankets in power plants can be considered: B1) Moderate Performance with lead lithium exit temperatures up to 500 C and a RANKINE cycle (steam turbine) power conversion system B1 can be realized with sandwich-type flow channel inserts and a primary loop build of well known ferritic steels B2) Higher Performance: high temperature operation with exit temperatures up to 700 ° C, allowing the use of a BRAYTON cycle (He turbines) power conversion system. For B2 SiC-composite FCI are required, and the materials used in the primary loop (tritium extraction system, intermediate HX) must be compatible with Pb-17 Li up to 700 ° C. Certainly, the high power operation is more attractive, but a DCLL blanket with lead-lithium exit temperatures of ~ 500 ° C has already a number of advantages compared to a HCLL blanket (simpler structure, no need for large internal heat transfer surfaces, less void space in tokamak inboard, smaller pumping power, tritium control easier).

35 B. DCLL Material R&D for Power Plants (cont’d) Common issues for both B1 and B2 cases For both kinds of power plants, the following issues have to be addressed by the material program: a)Qualification of the RAFS and its welds for high fluence irradiation, b)Development of suitable methods for the purification of Pb-17 Li (corrosion products, on-line Bi removal, Po control), c)Tritium extraction and control (e.g. tritium permeation barriers)

36 B. DCLL Material R&D for Power Plants (cont’d) B1) Issues to be addressed for moderate performance power plants d)Long time behavior of sandwich-type FCI, e)Suitable tritium extraction system (main candidate: vacuum permeator with ferritic steel tubes), f)Tritium control, especially the required reduction of permeation losses in the Pb-17Li/steam HX B2) Issues to be addressed for high performance power plants g)Qualification of the SiC flow channel inserts for high temperature applications (Interface temperature SiC/Pb-17 Li up to 800 C) h)Development of suitable tritium extraction methods from Pb-17 Li, leading to low tritium partial pressure (< 100 mPa), (candidate method: vacuum permeator with Nb or Ta tubes) operational limits on the impurities in Pb-17 Li, maintain extremely low impurity level in the vacuum chamber, impact of different materials in the primary Pb-17 Li loop : RAFS, SiC- composite, Nb-or Ta permeator tubes, HX tube material. i)Development of HX between primary (Pb-17Li) and secondary (He) loops, candidate material for the HX tubes include Nb or Ta, SiC- composites, Ni-base alloy with high Al content for forming protective coatings. Issues specific to the B1 and B2 cases

37 Materials Needs for Ceramic Breeder TBM Ferritic steel structure: needs are satisfied by those for the DCLL Pebble ceramics and beryllium: evaluate US strategy for procurement (Do we want to collaborate with EU, Japan and other parties on development or just purchase from EU/Japanese industry?) There is an active R&D program on ceramic breeder blankets worldwide. The US materials program may wish to explore making contributions to this area.

38 Additional Material Issues Common to All TBM Concepts and Parties Development of Be/FS joining capability Transition elements between FS in the TBM and the coolant access pipes (preferably austenitic steel for remote welding)

39 There are Immediate Needs for Human Resources from the Material Program to participate in the TBM activities and to work as part of the ITER TBM TEAM Those are in addition to performing the R&D described earlier For Example: to help the team perform design trade offs, more detailed design, and analysis for the TBM test articles and associated systems To provide advice on all aspects of materials limits and considerations To help the team decide on key areas of and strategy for international collaboration To assist in calculating costs for the TBM Program (including R&D, mockups, test articles, ancillary equipment, etc) (URGENT) Approximate for FY06: 1.5 – 2.5 FTE