Readout Status and Plans

Slides:



Advertisements
Similar presentations
The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
Advertisements

1 iTOP Electronics Effort LYNN WOOD PACIFIC NORTHWEST NATIONAL LABORATORY JULY 17, 2013.
G. Visser, IU, 4/10/2014 Single-photon signals from PMT through front board and pogo pins to 30 Ω load on carrier (mockup) board 4 independent events,
SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
ESODAC Study for a new ESO Detector Array Controller.
ITOP LEPS Beam Test Analysis LYNN WOOD JULY 17, 2013 PACIFIC NORTHWEST NATIONAL LABORATORY.
Fabrication Process Options Gary Varner Specification Details are often Application Specific Is IBM 130nm always the best choice? 1 6-OCT-2010 Electronics.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
Development of a 20 GS/s Sampling Chip in 130nm CMOS Technology Jean-Francois Genat On behalf of Mircea Bogdan 1, Henry J. Frisch 1, Herve Grabas 3, Mary.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Belle-II iTOP readout: production HV board and front board iTOP Electro-opto-mechanical working group Virginia Tech, 7/3/2013 Gerard Visser Indiana.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
Update on Electronics for the SSL 8” Ceramic Detector Matt Andrew, Kurtis Nishimura, Gary S. Varner University of Hawai’i 28-MAR-2012 Discussion 1.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Two-stage amplifier status test buffer – to be replaced with IRSX i signal recent / final (hopefully) design uses load resistor and voltage gain stage.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
1 iTOP readout firmware development K. Nishimura and G. Varner 25-MAR-2011 lDAQ meeting Not shown: Joshua Sopher (firmware) Lili Zhang (DSP coding)
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Mar. 18, 2009 HAPD ASIC Status Super KEKB Meeting 1 S.Nishida (KEK) S. Nishida HAPD ASIC Status Super KEKB Meeting Mar. 18, 2009 KEK.
PMT gain check at Indiana University. Test setup inside dark box LED white paper PMT # JT0298 channel #2 (per HPK numbering) OTHER CHANNELS MASKED WITH.
ERC - Elementary Readout Cell Miguel Ferreira 18 th April 2012
ZPD Project Overview B A B AR L1 DCT Upgrade FDR Masahiro Morii Harvard University Design Overview Progress and Changes since CDR Current Status Plans.
KLM Trigger Status Barrel KLM RPC Front-End Brandon Kunkler, Gerard Visser Belle II Trigger and Data Acquistion Workshop January 17, 2012.
1 Status Report on ADC LPC Clermont-Ferrand Laurent ROYER, Samuel MANEN.
Barrel PID summary K.Inami (Nagoya) Summary of R&D at Hawaii, Cincinnati, Ljubljana and Nagoya.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
TPC electronics Status, Plans, Needs Marcus Larwill April
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
S. Bota – Calorimeter Electronics overview - July 2002 Status of SPD electronics Very Front End Review of ASIC runs What’s new: RUN 4 and 5 Next Actions.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
Project Overview James Fast Pacific Northwest National Laboratory.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
Calorimeter Digitizer Electronics Cheng-Yi Chi Columbia University Nov 9-10, 2015sPHENIX Cost and Schedule Review1.
J.Maalmi, D.Breton – SuperB Workshop – Frascati – September 2010 Electronics for the two-bar test. D.Breton & J.Maalmi (LAL Orsay)
TOP Electronics Status & Beam Test Experience Kurtis Nishimura January 16, 2012 University of Hawaii Belle II TRG/DAQ Workshop Belle II TRG/DAQ - January.
SKIROC status Calice meeting – Kobe – 10/05/2007.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Dmitri Kotchetkov University of Hawaii at Manoa
Discussion on the preamp and calibration circuit and layout
Jim Fast Pacific Northwest National Laboratory
WBS 1.03 Readout Systems Specifications, Design and Acceptance
14-BIT Custom ADC Board Rev. B
Calorimeter Mu2e Development electronics Front-end Review
WBS 1.03 Readout Systems Scope, Cost and Schedule
ETD meeting Electronic design for the barrel : Front end chip and TDC
Update of time measurement results with the USB WaveCatcher board & Electronics for the DIRC-like TOF prototype at SLAC D.Breton , L.Burmistov,
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Verification Details US Belle II WBS 1.03 Readout Electronics
production boardstack
Intermediate Board Stack Intermediate Board Stack
boardstack status: schedule
ECAL Electronics Status
RPC Front End Electronics
PID meeting Mechanical implementation Electronics architecture
Baseline preamp (as in beam test) Test pulser to simulate MCP-PMT
Presentation transcript:

Readout Status and Plans M. Andrew, E. Choi, R. Conrad, S. Dubey, B. Kirby, B. Macek, H. Mehta, K. Nishimura, M. Rosen, X. Shi, L. Wood, G. Varner, G. Visser Feb. 6, 2014 B2GM Update

Executive Summary Production ASICs in fabrication (~April) Intermediate board stacks (IRS3C ASIC) almost complete  pulser, laser scans planned & then commission on CRT (March) [enough for 3x TOP modules] Pre-production board stack: Use same HV, Front board as Intermediate Master FPGA chosen, SCROD Rev. B in design Carrier Rev. E – basic layout/amplifier design Mechanics almost same (no Interconnect board) Passed Director’s Review, gearing up for CD-2/3

Preliminary answers to BPAC Quantifying effectiveness of timebase feedback (stability)

Preliminary answers to BPAC “Recovering” saturated pulse data and demonstration of the timing thus achieved

Preliminary answers to BPAC Codify a set of ASIC, Carrier, SCROD and full board-stack test/qualification procedures

Reminder: Subdetector Readout Module (a/k/a “the boardstack”) Example IRS Boardstack IRS ASIC reads out 8 channels Require 2 ASICs to read out 16 PMT channels 4 x ASICs per self-contained carrier board (32 channels) 4 x ASIC carrier boards arranged in compact boardstack (128 channels) Combined readout electronics, mechanical support and cooling 4 boardstacks per iTOP module (512 channels) 6

LEPS/SPring-8: 9 PCBs 7 distinct designs (6 UH; 1 IU) IRS3B/spartan6 boardstack versions LEPS/SPring-8: 9 PCBs 7 distinct designs (6 UH; 1 IU) IRS3B/spartan6 intermediate: 8 PCBs 6 distinct designs (4 UH; 2 IU) IRS3C/spartan6 pre-production prototype: 7 PCBs 4 distinct designs (2 UH; 2 IU) IRSX/zynq new stuff: thermal walls, AKA spacers SCROD revA3 SCROD “fake” revB (mockup)

Intermediate (IRS3C) 1) Assembled board stack 2) Alignment jig plate 3) Angle plates Transition to pogo-pins: need precise assembly jigs (being designed) 8

Intermediate Board Stack Pogo pins and HVB Pins: Mill-Max # 0926-1-15-20-75-14-11-0 Prototype in carriers (HVB & signal types) machined from PEEK Pin carrier flatness is an issue for assembly Considering injection-molded carriers, or perhaps mold pins in place (if Mill-Max can do this) Signal integrity tested for pogo pins: Equivalent to <1.8 nH inductor, which does not limit our signal bandwidth Basic active divider works very well, vetted in LEPS beam test Repackage for pogo-pin interconnect and more compact layout Compact layout requires encapsulation for HV insulation The encapsulation also provides thermal coupling to a new design cooling bracket compatible with spacer- block clamped boardstack New HVB board layout in progress. Will be assembled and encapsulated at IU for preliminary tests. Vendor identified for production encapsulation, quote received.

Intermediate Board Stack Front board (pogo-pin lands) Front board layout (99% final) Design reviewed 12/2013 To be submitted for fabrication this week PMT pins are fully buried inside a 4mm thick PCB Low insertion force pin receptacles contact PMT pins Pin receptacles are press-fitted to PCB (maximizes HV clearance and cleanliness, and simplifies assembly) 7-layer sequential lamination (2×), blind via PCB routes anode signals and HV bias to pogo-pin contact pads on rear side “Arbitrary” pitch and location adaptation between PMT’s and readout boardstack – a challenge, met Mechanical prototype front board (received 11/13/2013) (No routing, no internal layers)

Intermediate Board Stack Carrier Rev. D (c02, c13)

Intermediate Board Stack Pulser, laser test stand upgrade

Intermediate Board Stack Test schedule (gets to Fuji Hall and then onto CRT)

Toward Fuji Hall campaign Repackaged Sci-Fi (75x, 75y scint fiber – no ribbon cables) 3A @ 5V 1.7A @ -3.3V 9U KLM readout firmware development (same)

Readout ASIC status: Design completed/reviewed, in fabrication IRS3/X ASIC 50W term IRS2 ASIC ~8mm Timing Generator Die Photograph 8 channels per chip @ 2.7-4 GSa/s Samples stored, 12-bit digitized in groups of 64 32k samples per channel (8us at 4GSa/s) IRS3C* (April 2013) usable for Belle II Increased performance margin ASICs in fab: IRSX with high-speed serial interfaces IRS3D with enhanced dynamic range, same I/O * IRS3C = IRS3B with low power-on current, ext. dynamic range 15

IRSX Baseline ASIC for production (800 expected in pre-production run) High-speed, lower power/EMI LVDS outputs for fast, asynchronous signals Extended dynamic range comparator Lower-power Gray Code Counter and internal DLL demonstrated (TARGET7) IRS3D takes the internal improvements, but keeps IRS3C user I/O 2.6M transistors, 7.7k resistors (DACs)

TSMC Engineering Run Incremental cost ~zero (reduced risk) IRS3D IRSX TARGETX IRS3C Expect 836 of each (though yield near edge of wafer may be low) We will own the masks, can make rest of production fab with Engr Run Reticle Layout

Pre-production Board Stack SCROD Rev. B

Pre-production Board Stack Carrier Rev. E

Pre-production Board Stack Amplifier and calibration signal path Two-stage amplifier enables high speed response (600 ps risetime) with low gain operation of PMT Calibration signal summed (when enabled) with main signal – no switches in main signal path First stage is a load resistor and noninverting voltage amplifier, for better matching to characteristic impedance of the anode signal routing line Calibration signal bussed across 8 (or possibly 16) channels; switches chosen for minimal loading on disabled channels Second stage inverts the signal (necessary for IRSX readout polarity) 3.5V power supply limits output swing to protect the ASIC against latchup Simplified signal path schematic CAL switch – one possible scheme, now prototyping

Pre-production Board Stack Amplifier and calibration signal path Typical raw single-pe PMT pulse HVB @ −3200 V 25 Ohm load 20 GS/s (RTO1044) measured risetime: 140 ps 1 mV/div PMT gain ~ 5×105 1 ns/div Typ. amplified single-pe pulse HVB @ −3200 V Voltage on 10 pF load (IRSX eq.) 20 GS/s (RTO1044) Measured risetime: 565 ps [NOTE: different event & channel] 50 mV/div

Waveform sampling ASIC High Speed Link Board? 8 COPPER Waveform sampling ASIC 64 DAQ fiber transceivers 32 FINESSE 32 FINESSE 8 COPPER UT3 Trigger module 8k channels 1k 8-ch. ASICs 64 SRM “board stacks” Clock jitter cleaners 16 FTSW FTSW clock, trigger, programming 64 SRM 22

Calibration requirements Subtract storage cell pedestal (avg. ~2000 ADC +/- 100’s counts) Linearity correction (optional) Individual sample time offset correction 23

Data Analysis in Hardware Basic beam test analysis implemented in FPGA Fully pipelined architecture for maximum performance Initial measurements: 570k waveforms/sec Fiber, memory access will reduce max rate; studies underway now Testbench development for detailed performance analysis with replayed data underway Diagram is of planned system; blocks in blue are currently implemented and pink/orange is in progress. Currently 2000 events and corresponding pedestals read from FPGA block RAM; clock stability issues on ZC706 board prevent Aurora use (for now). Analysis architecture is pipelined; one clock per sample (T calculation technically not, but finishes within 256 clocks so it doesn’t add latency). Goal is to replay large portions of beam test data and compare FPGA results to offline software results, tuning FPGA implementation and replaying repeatedly. Next steps: - Move pedestal data to external DDR3 to measure memory access rates - Program jitter cleaner on ZC706 to support Aurora fiber interface - Add more advanced corrections to analysis steps. - Finish scoring system on ARM side for full testbench operation. 24

Schedule Intermediate BS readout of Fuji prototype

Schedule Pre-production board stack completion

Schedule Production test procedures and division of labor (@ S. Carolina & Pittsburgh)

Summary Into the end-game for production Remaining issues: Choice of SCROD FPGA (made) IRSX as baseline (IRS3D, IRS3C as backup) Confirming pogo-pin interface Confirming final amplifier configuration Final power cabling Intermediate board stacks for validating thermo-mechanics of pre-production designs Key milestones are: operation in CRT, completing pre-production board-stack, and establishing/validating production testing procedures 28

Insufficient time/laser scanning resources before LEPS beamtest – subsequent testing in Hawaii FTSW, COPPER, CAMAC Picosecond laser Inside Dark Box Dark box too small – being rebuilt Stage for x-y control of illumination fiber (picosecond laser) Module under test w/ reference SL-10 MCP 29

Recording in one set 64, transferring other (“ping-pong”) Event sampling Sampling: 128 (2x 64) separate transfer lanes Recording in one set 64, transferring other (“ping-pong”) Storage: 64 x 512 (32k per ch.) Wilkinson ADC (64 at once) 64 conv/channel (512 in parallel)

Belle II iTOP Counter A highly constrained cylinder 3-key elements (3) (1) (2) 31

Readout Electronics -- requirements Operate within Belle-II Trigger/DAQ environment >= 30kHz L1 trig Gbps fiber Tx/Rx COPPER backend Timing trigger iTOP: 8k channels 16 iTOP modules 4x 128-channel SRM/iTOP module (64x total) SuperKEKB RF clock 32

Belle II back-end Upgraded for Belle II 33 COPPER (COmmon Pipelined Platform for Electronics Readout) Used in Belle, J-PARC experiments FINESSE (Front-end Instrumentation Entity for Subdetector Specific Electronics) 33