Tritium Target at JLab Roy J. Holt Tritium Target Task Force: E. J. Beise (Univ. of Maryland), R. J. Holt (ANL), W. Korsch (Univ. of Kentucky), T. O’Connor.

Slides:



Advertisements
Similar presentations
Extraction of G E n at Q 2 =1 (GeV/c) 2 by Measurements of May 1, 2011 Ge Jin University of Virginia.
Advertisements

Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
Tritium Target 9 December Overview Design and major subsystems Thermal/structural analysis Cell filling Vent and stack T2 detection and monitoring.
The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
MeAsurement of F 2 n /F 2 p, d/u RAtios and A=3 EMC Effect in Deep Inelastic Electron Scattering Off the Tritium and Helium MirrOr Nuclei J. Gomez for.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
Progress and Plan for Superconducting RF Cavity RF Group.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
Progress on the MICE Cooling Channel Solenoid Magnet System
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
DESY PRC May 10, Beyond the One Photon Approximation in Lepton Scattering: A Definitive Experiment at DESY for J. Arrington (Argonne) D. Hasell,
MICE AFCSWG Safety Review Summary Mary Anne Cummings Dec. 17, 2003 MICE Video Conference.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
BONUS (Barely Off-Shell Nucleon Structure) Experiment Update Thia Keppel CTEQ Meeting November 2007.
Richard MilnerDESY April 6, OLYMPUS Overview Motivation for the experiment Progress to date on the experiment The path forward.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
ALPHA Project Safety Assessment Document Vladimir Anferov.
African Summer School 2012 Connecting the SRC & EMC Effects by.
Patrick Thornton, SNS/FPE June 9, 2008
Vacuum windows at JPARC Contents Introduction Vacuum windows at hadron beam line Helium gas cooling Vacuum windows at neutrino beam line primitive discussion.
The Physical Environment Tracers How Should I Prepare for the Physical Environment Tracers? Healthcare Engineering Consultants  Will limit.
Radiological Aspects of ILC Hee-Seock Lee Pohang Accelerator Laboratory 2 nd Workshop of Korean ILC at PAL.
1 11/11/2003 NBI Decay Tube and Windows Presentation by Ans Pardons 1 Decay Tube & Windows Introduction (Location, Planning) Decay Tube Entrance.
Page 1 Jean Delayen HyeKyoung Park Center for Accelerator Science Department of Physics, Old Dominion University and Thomas Jefferson National Accelerator.
09/13/20111 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
Overview of unpolarized structure function measurements at high x Roy J. Holt Jefferson Lab 13 October 2010.
From the nucleus to the quarks Roy J. Holt Achievements and Future Directions in Subatomic Physics: A Workshop in honor of Tony Thomas’ 60 th birthday.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
The Hall A Tritium target program John Arrington Argonne National Lab Joint Hall A & C Summer Collaboration Meeting Newport News, VA July 17,2015.
Eli Piasetzky Tel Aviv University, Israel Free neutron structure function Work done in collaboration with: L. B. Weinstein (ODU) D. Higinbotham, J. Gomez.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
ANL Bubble Chamber Superheated Active Target System B. DiGiovine N 2 O and C 2 F 6 as Active Fluids.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Nuclear Thermal Hydraulic System Experiment
MeAsurement of F 2 n /F 2 p, d/u RAtios and A=3 EMC Effect in Deep Inelastic Electron Scattering Off the Tritium and Helium MirrOr Nuclei Roy Holt for.
Safety Requirements and Regulations 10/3/20121Safety Requirements & Regulations James Sears.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
STEAM POWER PLANTS.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
LH2 Safety Issues for MICE 1.O2/LH2 separation 2.No Ignition sources near LH2 3.Adequate ventilation 4.Affects: Windows: absorbers and vacuum Primary and.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
1 Vacuum chambers for LHC LSS TS Workshop 2004 Pedro Costa Pinto TS department, MME group Surface Characterization & Coatings Section.
Overview of the Safety and Tritium Applied Research (STAR) Facility Phil Sharpe Fusion Safety Program Idaho National Laboratory, USA HAPL Program Meeting.
Hall A Tritium Target Status Dave Meekins 7 December 2015.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
1 Cryogenic Design and the 4 He Evaporative Purifier David G. Haase, et al., North Carolina State University.
Mike Scharfenstein LUSI DOE Review August 19, 2008 ES&H Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) M. Scharfenstein.
Double spin asymmetry measurement from SANE-HMS data at Jefferson Lab Hoyoung Kang For SANE collaboration Seoul National University DIS /04/23.
Long-Baseline Neutrino Facility LBNF Beamline optimization schedule Vaia Papadimitriou LBNF Beamline Manager Accelerator and Beam Interface Group Meeting.
MI Shielding Machine Protection Credit D. Capista March 7,2010.
The EMC Effect and The Quest to High x Quark Distributions Patricia Solvignon Argonne National Laboratory Hall C seminar Jefferson Lab April
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
SRF Operating Experience at JLab
Prospects for electron scattering from the triton Roy J. Holt
Polarized WACS Experiment (E ) Using Compact Photon Source (CPS)
Hall A Tritium Target Status
Lithium lens and window tests
Introduction to the tritium target design Roy J. Holt
Extraction Michael Bevins May 17, 2007
RSFs & categorisation 20 May, 2019.
Cryogenic behavior of the magnet
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

Tritium Target at JLab Roy J. Holt Tritium Target Task Force: E. J. Beise (Univ. of Maryland), R. J. Holt (ANL), W. Korsch (Univ. of Kentucky), T. O’Connor (ANL), G. Petratos (Kent State Univ.), R. Ransome (Rutgers Univ.), P. Solvignon (ANL), and B. Wojtsekhowski (JLab) 12 June 2009

2 Deep Inelastic Scattering and Structure Functions Proton structure function: Neutron structure function (isospin symmetry): Ratio: Nachtmann inequality: Focus on high x: leptonic hadronic Parton model:

3 The Neutron Structure Function at high x SU(6) symmetry pQCD Scalar di-quark Reviews: N. Isgur, PRD 59 (1999), S Brodsky et al NP B441 (1995), W. Melnitchouk and A. Thomas PL B377 (1996) 11.

4 E Projected Results JLab E , G. Petratos, J. Gomez, R. J. Holt, R. Ransome et al

5 Experiment requirement 12 GeV experiment: E , conditionally approved d/u ratio EMC effect in 3 H “… the PAC considers the physics goals of this experiment as highlights of the 12 GeV physics program.” Condition: “A special JLab Management review of the safety aspects of the tritium target is the condition for approval.”

6 Tritium Targets at Electron Accelerators LabYearQuantity (kCi) Thickness (g/cm 2 ) Current (  A) Current x thickness (  A-g/cm 2 ) Safe FOM (  A- g/cm 2 /kCi) Stanford HEPL MIT-Bates Saclay JLab201? JLab also has a huge spectrometer acceptance advantage, eg. SBS

7 Primary and secondary containment Passive cooling – helium gas + heat sinks helium gas -> early warning of containment breach helium gas -> pressure relief on tritium cell Target cell design Swagelok 316L bellows sealed valve 403 mm 450 mm 12.5 mm 0.004” (0.008”) s.s. inner (outer) tubes with 0.004” s.s. windows 32 mm 5 atm 4 He gas (STP) 10 atm 3 H gas (STP)

8 Safety and Tritium Applications Research (STAR) Facility Idaho National Laboratory STAR Facility at Idaho National Lab –Test s.s. materials through radiography,… –Fabricate target cells –Radiograph e-beam welds –Pressure test target cells up to 80 atm –Fill target cells with gases –Seal target cells –Ship target cells to JLab –Receive target cells shipped from JLab and recover tritium gas STAR has shipped up to 2500 Ci of tritium gas. Director, Phil Sharpe

9 Limit beam current to 30  A – >70  A problem for Fe targets (C. Cochran, Ph.D. Dissertation, UVa 2000) –<20  A, correction = 0.1%/  A (K. Dow, Ph.D Dissertation, MIT 1982) –Threshold in gas: 10 mW/mm -> 24  A electron beam -> 1.7  A for Bates target!? Beam current considerations H. Yamaguchi et al. Nucl. Instrum. Meth. Phys. Res. A 589, 156 (2008). 10 mW/mm RIKEN cooled gas 2 H target

10 Target heating Tritium decay heat: 53 mW (324 mW/g) Beam heating (30  A): – 3.5 W per window -> 14 W – 5 W in gas – Total heating = 19 W

11 Target cooling Window cooling: –Conduction to edge: W/K –Radiative cooling: 0.6 W 465 C –Helium conduction: W/K –Helium convection: W/K Target cell cooling in vacuum chamber –Radiative cooling alone:  T = 283 C –Heat sinks: < 100 C Target temperature < 100 C. Finite element heat transfer analysis Bran Brajuskovic (ANL) + summer student T. O’Connor

12 Scattering chamber and vent hood T. O’Connor Vacuum chamber: Tertiary containment NEG and ion pumps, no exhaust continuous helium leak detection isolated from accelerator

13 Special issues for tritium Tritium diffusion through stainless steel –Entire cell at 400C -> 0.5 mCi/hr -> 1.2 Ci in 100 days X-rays from the target cell –18.6 keV beta endpoint -> << 0.3 mrem/hr Radiation damage of target cell – orders of magnitude – no problem Hydrogen embrittlement of the target cell –Problem above 2000 psi, target at 150 psi ST Energy stored in pressurized gas cell (JLab ESH 6151 Appendix T4) –75 and 250 J ~ to polarized 3 He target Chemical energy in the gas cell –~0.4 liters STP, 22 kJ, strongly diluted in scatt. chamber or Hall, 15 ppb Activation of the s.s. target cell –Target windows: 4.3 mrem/hr, after one month: m

14 Summary of key engineered controls Small amount of tritium gas (1563 Ci) – MIT-Bates: 110 x larger sample –Small diameter cell with beam collimator –Super Big Bite Spectrometer All tritium handling performed offsite at Idaho National Lab Target cell completely sealed –Secondary containment with helium gas, completely sealed –Passive cooling –Tertiary containment is sealed, evacuated scattering chamber with ion and NEG pumps, continuous helium and tritium leak detection –Scattering chamber isolated from accelerator Raster failure risk mitigation –Probability from Hall A experience ~ 3x10 -4 –Independent raster monitor with battery backup –Independent FSS on raster Independent vent hood and task fan in target area –High velocity task fan interlocked to tritium or helium detection

15 Proposed administrative controls Beam current should be limited to 30  A Overhead crane locked out after target installation Trained tritium target operator(s) on shift at all times Beam condition, raster pattern and target parameters monitored Accelerator operators given special instructions –Independent operator check on beam current, raster, interlocks Full written and approved procedures for all operations with target –Target installation and removal –Target storage –Target motion –Beam on target

16 Worst case accidents Tritium containment breached – with task fan –1563 Ci of tritium lost up 5-m stack in 1 hour –Person at site boundary: 0.3 mrem* Tritium containment breached – without task fan –1563 Ci lost into Hall A (38,000 m 3 ) –Worker receives <0.33 mrem/hr –Hall A exhaust fans (36,000 cfm capacity) –After 2 20,000 cfm, ~ 1 Ci level *GENII v. 2 NESHAPS code for EPA, Bruce Napier, PNNL

17 Unrelated fire, natural disaster and other incidents Fire –Target containment is thermally well insulated –Normal evacuation of room –Access by fire department permissible after check for radiological hazards including tritium Massive scale earthquakes and tornadoes unprecedented Hurricanes cause power outages and flooding –Sealed, passive target with NEG pump not affected

18 Summary Scientific stage being set at JLab for d/u ratio and EMC measurements Totally sealed, passively-cooled target, triple containment, exhaust fan, interlocks All tritium gas handling performed at STAR Facility at INL Additional independent interlock on beam raster Target concept is ready for engineering design Conclusion: A safe tritium target is possible at JLab.

19 The EMC Effect in 3 He and 3 H I. R. Afnan et al, PRC 68 (2003)

20 Ratio of 3 He, 3 H JLab E Measure F 2 ’s and form ratios: Form “super-ratio”, r, then where Theoretically, I. Afnan et al, PRC 68 (2003)

21 Safety considerations Small diameter gas cell + SBS -> minimize amount of tritium Target filled, sealed, and decommissioned at Idaho Nat’l Lab Reduced beam current (< 30  A) Secondary and tertiary containment Target system isolated from accelerator Passive cooling of target cell Special ventilation system in target area Independent interlock on beam raster Target temperature monitor and interlock Helium and tritium detection with interlock Special procedures

22 Window weld designs Stanford target T. O’Connor Finite element stress analysis in progress

23 Extractions with modern deuteron wave functions Courtesy of J. Arrington J. Arrington et al, J. Phys. G 36 (2009) The ratio at high x has a strong dependence on deuteron structure.