Presentation by: Rosanne (Beth) Green, consultant and Tara Miller, Program Manager, ReDe/Critique 2012 1.

Slides:



Advertisements
Similar presentations
Risk Management and the Contractor’s Property Management System
Advertisements

Checking & Corrective Action
OMB Circular A133 Audits of States, Local Governments, and Non-Profit Organizations 1 Departmental Research Administrators Training Track.
Transition from Q1- 8th to Q1- 9th edition
Review Questions Business 205
Software Quality Assurance Plan
Requisition Process. Requisitioning Procedures Words to live by: Massachusetts Uniform Procurement Act, M.G.L. c.30B requires the following on all purchases.
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
Circular A-110 Everything You Didn’t Want to Know.
ISO General Awareness Training
ISO 9001 Interpretation : Exclusions
SAP R/3 Materials Management Module
Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
The New FAR Property Plan Collaboration is Key 2007 Eastern Region Seminar Pat Jacklets, CPPM, CF.
ZHRC/HTI Financial Management Training Session 8: Annual Procurement Plans, Procurement Contracts, and Contract Management.
Project co- financed by Asean European Committee for Standardization Implementing Agency Project co-financed by European Union Module 7 GMP Workshop Kuala.
Please use the following two slides as a template for your presentation at NES. Completing the DD Form 1149: — A Basic Perspective Walt Clark, CPPM Property.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
1 FAR -- Part 51 Use of Government Sources by Contractors This part prescribes policies and procedures for the use by contractors of Government supply.
CONTRACTUAL FLOW DOWN OF DPAS PRIORITY RATINGS
Leaders in Asset Management Doing More with your Property Management System How Government Agencies are maturing processes through their PMIS Systems.
FAR PART 45 – Government Property
Audit objectives, Planning The Audit
Asset Management Lifecycle Steve Ekin, CPPA GA Department of Administrative Services.
Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.
Procurement Card Presented By: Denise Matias, CAH February 1, 2012.
FIND IT BEFORE THE AUDITOR DOES! Marlene Lynn, CPPM Manager of Asset Management, BAE Systems Electronic Solutions July 25, 2011.
2011 NPMA Conference Series III National Capital Area Conference Leaders in Asset Management Application of Standards into Policy Bill Franklin - Moderator.
FCS - AAO - DM COMPE/SE/ISE 492 Senior Project 2 System/Software Test Documentation (STD) System/Software Test Documentation (STD)
2011 NPMA Conference Series III National Capital Area Conference Leaders in Asset Management National Capitol Area Conference Charles L. Robinson, Director.
New Form Approval Process. Background New Process is effective April 1, 2014 Changes Chapter 4 in the Library Manual (the reissued 2014 manual will be.
2011 NPMA Conference Series III National Capital Area Conference Leaders in Asset Management National Capitol Area Conference Rick D. Parker,CPPM November.
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
ZHRC/HTI Financial Management Training Session 9: Stores and Supplies Management.
Generic GFE Implementation Toolset for Prime Contractors -IUID Guidance- –Initial population of Government Furnished Equipment Data into the IUID Registry.
KUALI CAPITAL ASSET MANAGEMENT (CAM) Business and Financial Services, Property Management.
2013 NPMA Fall Conference Value Through Professional Asset Management You’re Having a Property Management System Analysis (PMSA)…Now What??? Terri L. Snook,
Necessary and Desired Attribute Fields for a Good Asset System Gary Quinn, CPPM.
Managing Government and Contractor Owned Assets at an OCONUS Location Ron C. Lobo, CPPM CF.
Audit and Audit Resolution Presented by Wendy Spivey ADECA Audit Manager.
OH 5-1 Agenda Chapter 8 – Purchasing Follow-Up Tour of receiving area Physical Receiving Inventory Book Set-Up Unit of Measures Worksheet Project: Standardized.
11 Basic Property Management- Government Part II Meeting the needs of all our “customers” while implementing effective processes….. Two of the biggest.
Barcodes and MDS Easy ways to speed up and increase accuracy using barcodes in MDS Monday June 14, 2010.
2014 NPMA Spring Seminar Value Through Professional Asset Management Property 101 Basic Property Tara Miller PMP, CPPM, CF Beth Green CPPM, CF Consultant.
2013 NPMA Fall Conference Value Through Professional Asset Management Property 101 Basic Property Tara Miller PMP, CPPM, CF Beth Green CPPM, CF Consultant.
National Property Management Association Lost Reports Barbara A. Finnegan, CPPM CF 1.
New Form Approval Process. Background New Process is effective April 1, 2014 Published in the March 2014 Cities and Towns Bulletin, pages 7 and 8 Changes.
11 Basic Property Management-Government Part II Meeting the needs of all our “customers” while implementing effective processes….. Two of the biggest challenges.
ISO Registration Common Areas of Nonconformances.
"Are Your Records Complete? Tips, Reports and Suggestions for Ensuring Completeness of Records" Pat Jacklets CPPM, CF.
Sponsored Project Administration Fall 2012 CERTIFICATION PROGRAM Sponsored Project Lifecycle Introduction Overview Creating a Project Budget Compliance.
Workshop on Accreditation of Bodies Certifying Medical Devices Kiev, November 2014.
Scheduled Government-Furnished Property Attachment: Step-by-Step Tutorial Updated 11 Jan 2016.
Copyright © Texas Education Agency Accounting for Grant Funds, including Documentation for Expenditures.
Linking Assertions and Evidence Essential elements of Chapters 6 and 7 combined.
1 Requisitioned Government- Furnished Property Attachment: Step-by-Step Tutorial Updated 11 Jan 2016.
GFP Attachment Fields Mandatory/Optional Updated 11 Jan 2016.
Scheduled Government-Furnished Property Attachment: Step-by-Step Tutorial Updated 17 May 2016.
Juanita Syljuberget Alabama Cooperative Extension System May 23, 2012.
Information Exchange under the DLMS SDR Transformation Initiative, DoD WebSDR, & Item Unique Identification (IUID) SDR Committee Meeting, Dec 6, 2006.
UW Whitewater Procurement Card Program. Overview The purpose of UW-Whitewater Procurement Card Program is to establish a more efficient, cost- effective.
UW Whitewater Procurement Card Program
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – Cowes Date: 13/5/16.
IUID and Government Furnished Property Basics
Administration of a FIDIC Contract - Project Control
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Presented By: Denise Matias, CAH February 1, 2012
Internal Control Internal control is the process designed and affected by owners, management, and other personnel. It is implemented to address business.
Accounting Information Systems and Business Processes - Part I
Presentation transcript:

Presentation by: Rosanne (Beth) Green, consultant and Tara Miller, Program Manager, ReDe/Critique

2 Receipt of Government Property

FAR (f) Contractor plans and systems (1) (ii) Receipt of Government Property ◦ (ii) Receipt of Government Property. The Contractor shall receive Government property and document the receipt, record the information necessary to meet the record requirement of paragraph (f)(1)(iii)(A)(1) through(5) of this clause.

FAR (f) Contractor Plans and Systems (1)(ii) Receipt of Government Property (A) Government Furnished Property ◦ The Contractor shall furnish a written statement to the Property Administrator containing all relevant facts, such as cause or condition and a recommended course(s) of action, if overages, shortages, or damages and/or other discrepancies are discovered upon receipt of Government-furnished property.

FAR (f) Contractor Plans and systems (1)(ii) Receipt of Government Property (B) Contractor-acquired property ◦ The Contractor shall take all actions necessary to adjust for overages, shortages, damage and/or other discrepancies discovered upon receipt, in shipment of Contractor-acquired property from a vendor or supplier, so as to ensure the proper allocability and allowability of associated costs.

 ASTM E – Receiving Property ◦ Covers the process of verifying, recording and reporting receipt of tangible personal property ◦ This Standard details the fundamental concepts of the receiving process

 Receipt of Government Property (Outcome #2) ◦ The process of accepting property into an organization ◦ Property screened against procurement documentation ◦ Confirmation the order ◦ Condition ◦ Discrepancies noted and acted upon ◦ Securing of the property ◦ Timely completion of documentation

 Receipt of Government Property (Outcome #2), continued ◦ Receiving documentation may include  Carrier’s Freight Bill: A form originated by the trucking company, railroad or airlines  Supplier’s Packing List: A listing of the items shipped

 Receipt of Government Property (Outcome #2), continued  Receiving Report: An internally- generated document that lists the items and quantities being acquired on a PO  Receiving Voucher Log: Provides receiving activity information and a way to trace lost or misappropriated items

 Receipt of Government Property (Outcome #2), continued ◦ Obvious damage of shipments should be noted on the Receiving documents ◦ Before a discrepant shipment is accepted, the signature of the carrier’s representative (most often the driver) should be obtained, acknowledging the discrepancies

 Receipt of Government Property (Outcome #2), continued ◦ If an item is delivered directly to the end user or requires unusual receiving accommodations due to size or other conditions, the recipient of the item must immediately notify the receiving department of the delivery. ◦ Once property has been received, inspected, and accepted, it may be assigned an identification number if it meets your tagging criteria.

 Receiving ◦ FAR (f) Contractor Plans and Systems (1)(ii) Receipt of Government Property ◦ FAR (f) Contractor Plans and Systems (1)(ii) Receipt of Government Property FAC April 2, 2012 ◦ FAR (f) Contractor Plans and Systems (1)(ii) Receipt of Government Property (A) Government Furnished Property ◦ FAR (f) Contractor Plans and systems (1)(ii) Receipt of Government Property (B) Contractor-acquired property ◦ ASTM E – Receiving Property

Identification of Government Property

FAR (f) Contractor plans and systems (continued) ◦ (ii) Identify as Government owned in a manner appropriate to the type of property (e.g., stamp, tag, mark, or other identification); and manage any discrepancies incident to shipment

ASTM E Physical Placement of an Entity–Controlled Supplement Identification Label  Significance and Use ◦ When identification of equipment is needed for purposes of control, management, or determining ownership, or a combination  Scope ◦ This practice is for supplemental identification labels assigned by an entity and affixed to equipment to permit control

 The marking of property by which one or more of the following can be ascertained: ◦ Ownership ◦ Part number ◦ Serial number ◦ Model number ◦ Description ◦ Contract number

 Tagging Process ◦ Property ID should be affixed to the item, if possible  Examples of items that may be NOT have tags affixed to it  Hardware that has special features – Flight  Too Small  Environmental Conditions ◦ ID process should be incorporated in the receiving process

 Types of property generally requiring serialized tags are: ◦ Capital equipment ◦ Special requirement items such as those needing recurring maintenance or calibration ◦ Rented, leased, or loaned equipment ◦ Sensitive or controlled property ◦ Government property that will not be expended, be consumed, or become part of a deliverable end-item

 Types of property generally requiring non-serialized tags are: ◦ Components and accessories to capital equipment, where the main component is identified according to the system definition ◦ Components and accessories of low-value government property that will not be expended or consumed, nor become part of a deliverable end-item

 Identification methods are numerous, from a simple tag or mark on the item, to a barcode, to more elaborate tagging by electronic transmitters. The optimum method can be determined by the following criteria: ◦ Type of asset to be controlled ◦ Data collection method to be used (scanning or pinging, etc.) ◦ Environment in which the property item must reside (climate, humidity, etc.)

2012 Identification  Identification methods criteria: (continued) ◦ Ease of reading (whether visually or electronically) ◦ Size of the decal or tag ◦ Surface onto which the tag(s) will be applied ◦ The total cost per decal, tag, or mark, including (where applicable) any readers ◦ Availability 21

 There are several methods of identification ◦ Bar coding, stamping, marking, etching, network pinging, and Radio Frequency Identification (RFID)  What ever the methods your activity chooses, it must be outlined in procedures for audit purposes!

 For audit purposes your procedures must show how your organization will handle property located at a different locations other than what is considered to be the main business address.  All assets should be identified using the same methods as those used for assets at the main address unless your contract dictates otherwise.

 Identification ◦ FAR (f) Contractor Plans and Systems (1)(ii) Receipt of Government Property ◦ ASTM E Physical Placement of an Entity–Controlled Supplement Identification Label

Records Of Government Property

FAR (f) Contractor plans and systems (iii) Records of Government Property ◦ Records of Government property. The Contractor shall create and maintain records of all Government property accountable to the contract, including Government furnished and Contractor- acquired property.

FAR (f) Contractor plans and systems (iii) Records of Government Property (continued) – (A) Property records shall enable a complete, current, auditable record of all transactions and shall, unless otherwise approved by the Property Administrator, contain the following:

FAR (f) Contractor plans and systems (iii) Records of Government Property (continued) (A) (1) The name, part number and description, manufacturer, model number, National Stock Number (if needed for additional item identification tracking and/or disposition).

FAR (f) Contractor plans and systems (iii) Records of Government Property (A) (continued) ◦ (2) Quantity received (or fabricated), issued, and balance on hand. ◦ (3) Unit acquisition cost. ◦ (4) Unique-item identifier or equivalent (if available and necessary for individual item tracking). ◦ (5) Unit of measure.

FAR (f) Contractor plans and systems (iii) Records of Government Property (A) (continued) ◦ (6) Accountable contract number or equivalent code designation. ◦ (7) Location. ◦ (8) Disposition. ◦ (9) Posting reference and date of transaction. ◦ (10) Date placed in service (if required in accordance with the terms and conditions of the contract).

E ASTM Standard Practice for Data Characteristics of Equipment Records ◦ Acknowledges the FAR required information but also provides guidance leading to the recording of optional data ◦ If a contractor utilizes the information from this Standard, the contractor should identify in their procedures what “optional data elements” they will be utilizing as well as the essential data elements

E ASTM Standard Practice for Uniform Data Management in Asset Management Records Systems ◦ Provides entities with a guideline for establishing and maintaining a level of data consistency in asset management records systems that will result in useful information for decision makers ◦ Have you every had to run a report and discovered your records are not consistently entered?

E ASTM Standard Practice for Data Characteristics of Equipment Records ◦ Acknowledges the FAR required information but also provides guidance leading to the recording of optional data ◦ If a contractor utilizes the information from this Standard, the contractor should identify in their procedures what “optional data elements” they will be utilizing as well as the essential data elements

E ASTM Standard Practice for Uniform Data Management in Asset Management Records Systems ◦ Provides entities with a guideline for establishing and maintaining a level of data consistency in asset management records systems that will result in useful information for decision makers ◦ Have you every had to run a report and discovered your records are not consistently entered?

 Records (Outcome #3) ◦ A record system that shows all the required basic information ◦ Establishing a Record  Timeframe required  System of record  Mandatory fields  Optional, useful fields  Financial data and related accuracy  What happens with support documents The soul of your property Control System

 Records (Outcome #3) ◦ Once these decisions are made, the specific decision-making processes as to how, when, and by whom the property will be controlled- is further defined in the contract, policies, procedures, and operational guidelines ◦ The Auditor will be measuring your procedures against your processes and if they do not see a risk to the Government during the audit your Property Management System will be considered acceptable.

 If the Property Management System does not comply, these are just a few potential consequences  Increased surveillance and findings  Need to implement corrective action plans  Increased liability and financial risk  Damaged credibility with customers  Increased borrowing costs

FAR (f) Contractor plans and systems (iii) Records of Government Property (B) Use of Receipts and Issue System for Government Material.  When approved by the Property Administrator, the Contractor may maintain, in lieu of formal property records, a file of appropriately cross- referenced documents evidencing receipt, issue, and use of material that is issued for immediate consumption.

 Material Records ◦ If you use Receipt and Issue, your plan must stipulate that you are going to use this type of record. Also, your procedures must show this process.  To Avoid Record Errors – ◦ Educate ◦ Analyze ◦ Self Audits ◦ Establish Goals of Higher Accuracy (take corrective action

 Record Retention – ◦ FAR Subpart 4.7—Contractor Records Retention  Most are 3 years after final payment for certain records. ◦ This could be different for each agency, it could be more stringent.  Check requirements in your contract

ASTM E2499–06 Classification of Equipment Physical Location Information ◦ Covers standardizing practices and terminology related to information conveying the physical location of equipment. ◦ Describes ten increasingly specific levels of equipment physical location information, assigning a standard name and level number to each.

ASTM E2499–06 Classification of Equipment Physical Location Information, continued ◦ Covers the process for verifying, recording, and reporting receipt of tangible personal property (that is, equipment, supplies, and material) ◦ Details the fundamental concepts of the receiving process

 Records ◦ FAR (f) Contractor Plans and Systems (iii) Records of Government Property ◦ FAR (f) Contractor Plans and Systems (iii) Records of Government Property (A) (1) and (10) ◦ FAR (f) Contractor Plans and Systems (iii)(B) Use of Receipts & Issue System for Government Material

 Records ◦ E ASTM Standard Practice for Data Characteristics of Equipment Records  Brockman, Cinda, White Paper on E Standard Practice for Data Characteristics for Equipment Records, 11/11/11 ◦ E ASTM Standard Practice for Uniform Data Management in Asset Management Records Systems ◦ Kriner, Brandon, White Paper E Standard Practice for Uniform Data Management in Asset Management Records Systems, 11/10/2011

 Records ◦ ASTM E2499–06 Classification of Equipment Physical Location Information ◦ NPMA Fundamentals of Property Management

If you utilize the information provided, you should be able to establish procedures and records for Receiving and Identification in support of a government contract and Pass The Audit!

 Rosanne (Beth) Green, CPPM, CF ◦ ◦ Cell ◦  Tara S. Miller, CPPM, CF, PMP Program Manager for ReDe/Critique ◦ ◦