Lessons Learned from Site Transition Presented by:Co-Contributor: Susan L. Smiley Frazer R. Lockhart, PMP Site Transition CoordinatorFederal Project Director.

Slides:



Advertisements
Similar presentations
Not to be Considered as a Regulatory Submittal Pre-Decisional DRAFT 19438_1 Preferred Alternative Recommended by Core Team Environmental Impact Statement.
Advertisements

Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
How to commence the IT Modernization Process?
Office of Science Experience with Surveillance and Maintenance (S&M) of Environmental Remediation David Michlewicz – DOE Office of Science, Office of Safety,
Oregon Cleanup Program Top Priorities. Goal: cleanup contaminated property so human health and the environment are protected and contaminated properties.
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
1 Terry Tyborowski Deputy Assistant Secretary, Program Planning and Budget for Environmental Management February 27, 2014 Budget Update.
Institutional Controls Pamela Elkow and Richard Fil.
THE NSF BUDGET Overview of Agency Funding Processes Presented by Beth Blue National Science Foundation Office of Budget, Finance, and Award Management.
Remediation Challenges and Stakeholder Engagement: A Canadian Perspective Michael Binder President Canadian Nuclear Safety Commission Presentation to the.
BRAC: GETTING THE NEXT ROUND RIGHT BASE REDEVELOPMENT FORUM NOVEMBER 2014.
National Governors Association Meeting LM: Ensuring a Smooth Transition – Procedures and Examples June 21-22, 2005 Dave Geiser Office of Legacy Management.
Reorganization of APHIS Veterinary Services U.S. Department of Agriculture Animal and Plant Health Inspection Service Veterinary Services November 2013.
1 Presented By: Matthew Duchesne Office of Environmental Compliance Office of Environmental Management Department of Energy 2010 Long-Term Surveillance.
Small Projects & Tailoring Using the PPA 1:15 – 2:15 Teresa Kinley, OPHPR With Panelists: Susan Wilkin, NCCDPHP Andy Autry, NCBDDD Carol Waller, NCEH/ATSDR.
Making a Difference American Recovery and Reinvestment Act Thursday, February 25, 2010 Thomas Johnson, Jr. Deputy Director, EM Recovery Act Office of Environmental.
Gary W. Baughman, Division Director 2010 Long-Term Surveillance and Maintenance Conference November 17, 2010.
Hanford Site: Long-term Stewardship Boyd Hathaway Realty Officer Department of Energy – Richland Operations Office Hanford Long-Term Stewardship (LTS)
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e Dr. Stephen TerMaath Chief, BRAC Program Management Division 22.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Challenges in developing a Safety Case WG5. How to Develop a Safety Case SC can be a tool for providing information to stakeholders other than regulators.
National Governors Association Federal Facilities Task Force States-Only Session Intergovernmental Meeting with DOE December 8, 2004 Arlington, VA Prepared.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
Legacy Management Strategic Plan 2010 David Geiser Director, U.S. Department of Energy (DOE or Department) Office of Legacy Management (LM) November 2010.
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
1 Los Alamos Legacy Cleanup Completion Project (LCCP) Post Fiscal Year 2016 Contract(s) Industry Day Request For Information & Capability.
U.S. Department of Energy Office of Science Office of Biological & Environmental Research Biological and Environmental Research Advisory Committee Roland.
1 Project Management, Support Functions, and Integration David S. Rhodes Acquisition Integrated Project Team Chair Environmental Management.
UNRESTRICTED / ILLIMITÉ LLRWMO’s Legacy Sites in Canada IAEA RSLS Elliot Lake Workshop Mark Gardiner 2014 May 2.
NGA Federal Facilities Task Force Brief Update & Key Topics for Meeting May 16, 2002 Washington DC Jerry Boese Ross & Associates Environmental Consulting,
1 Roger Butler Deputy Assistant Secretary for Policy, Planning, and Budget August 25 & 27, 2003 Office of Environmental Management FY2004 Budget Office.
2010 Long-Term Surveillance and Maintenance Conference Institutional Controls Featuring the Pinellas Site Jack Craig U.S. Department of Energy Office of.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
PERT Overview Federal Perspective Annual PERT Workshop February 7-9, 2012 Nevada Site Office Evelyn Landini, Contracting Officer Brookhaven Site Office.
M E Environmental Management safety  performance  cleanup  closure The U.S. Department of Energy Environmental Management Intergovernmental Meeting.
1 Office of Legacy Management FY 2007 Budget U.S. Department of Energy February 6, 2006.
1 The Use of Institutional Controls Under the RCRA Corrective Action Program.
Clean-up of former nuclear sites and the role of the Planning regime Jim Cochrane.
EM-1 Office of Environmental Management Building the FY 2003 Budget u Transition budget to begin implementing the top-to-bottom review u Budget consists.
IAEA International Atomic Energy Agency Summary and Overview of TECDOC Russel Edge Decommissioning and Remediation Unit Division of Radiation,Transport.
Tier I: Module 5 CERCLA 128(a): Tribal Response Program Element 4: Verification & Certification.
EM Budget--- Past/Present/Future Mark W. Frei U.S. Department of Energy October 14, 2005.
1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.
State and Tribal Government Working Group November 12, 2008 FERNALD NATURAL RESOURCE DAMAGES SETTLEMENT.
Using an Environmental Management System for Managing DOE’s Legacy DOE Order Workshop 26 February, 2003.
Stewardship Planning & Local Governments: What’s Next? David M. Abelson Executive Director, Rocky Flats Stewardship Council Principal, Crescent Strategies,
Planning for FY08: Managing the Transition of the LM Organization December 2004.
2010 Long-Term Surveillance and Maintenance Conference Records Storage and Accessibility John Montgomery Team Lead, Archives and Information Management.
1 Base Realignment and Closure (BRAC) The Army’s Approach to Managing Resources 10 August 2005 Mr. Jeff Giangiuli Vice President CALIBRE.
1 West Valley Demonstration Project FY 2014 Budget Briefing Bryan C. Bower May 22, 2013.
Integrating Your Environmental Management System With Community Stakeholders Mr. Jimmy Parrish Defense Supply Center Richmond April 7, 2004 Presented To.
Reclamation of Abandoned Mine Lands: EPA Perspective.
1 EM Update Presented to the National Governors Association Federal Facilities Task Force Dr. Inés Triay Principal Deputy Assistant Secretary for Environmental.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF ORDER Larry Stirling
Request for Information & Capability Statements Richland Acquisitions Post-FY 2018 November 17-19, 2015.
Update to National Governors’ Association Patty Bubar Associate Deputy Assistant Secretary Office of Integration and Disposition May 16, 2002.
The Challenge of Getting What You Asked For Integrated Safety Management Summit Knoxville TN August 24-27, 2009 Presented By: Patrice McEahern HNF
February 26 – March 1, 2012 ♦ Phoenix, Arizona Session # 90 Long–Term Stewardship at DOE’s Hanford Site Abstract #12575 Authors & Affiliation : Rick Moren:
Federal Facilities Task Force Meeting, June 21-22, 2005 EM BUDGET UPDATE Mark Frei, DAS Business Operations Safe for the Workers, Protective of.
Office of Legacy Management Land Transfer and Reuse November 2006 Steven R. Schiesswohl Senior Realty Officer, Office of Legacy Management.
Global Warming – The Broad Legal Reach of Initiatives to Reduce Carbon Emissions Worldwide Legal Issues Associated with Carbon Capture and Geologic Storage.
Long-Term Stewardship: Institutional Controls on Department of Energy Sites Steve Schiesswohl, Senior Realty Officer November 2006.
American Recovery & Reinvestment Act Office of Environmental Management Presentation to Regulators March 6, 2009 Cynthia V. Anderson, EM Recovery Act Program.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Low-Level Radioactive Waste (LLW) Disposition at the
Bradley Smith February 28, 2017
The Path Forward for WIPP: A State and Local Perspective
Oak Ridge Office of Environmental Management Update
Presentation transcript:

Lessons Learned from Site Transition Presented by:Co-Contributor: Susan L. Smiley Frazer R. Lockhart, PMP Site Transition CoordinatorFederal Project Director EM Consolidated Business Center EM Recovery Act Program 2010 Long-Term Surveillance and Maintenance Conference Grand Junction, CO Grand Junction, CO November 17, 2010

2 EM Closure Sites created impetus for LM (circa 2003 to 2005) Complete demolition and remediation of five sites No clear structure or expertise in EM for LTS&M planning and execution EM intention to “go out of business” after Legacy cleanup Stakeholder desire to “close the book” on former sites and re-use property for other purposes Rocky Flats Cleanup Fernald Cleanup

3 Mission (Rocky Flats): Convert former nuclear weapons production facility to a wildlife refuge End State Goal: All plutonium and waste dispositioned off-site All buildings demolished All areas of environmental contamination cleaned up Surface water leaving the Site safe for any uses Long-term monitoring, institutional controls Post Closure:  Site Operations less than $5 million/year  Minimal employee presence A clear End-State assists Transition

4 Start planning for LTS&M well before transition Identify key players in all organizations Start regulatory discussions early –Agreements, Permits, O&M Plans, institutional controls Development of Site Transition Plan Budget formulation, transfer of Target Funding Initiate site transition activities early –“Staged transition” to DOE Recipient Office worked well –Easy things first –Visible things first –Subsequent Programmatic (final) transfer smoother Earlier is Better

5 Congress can help (or hurt) Need to build trust with local stakeholders, particularly at non- continuing mission sites (e.g. Rocky Flats, Mound) –LM visibility at Public meetings –LM visibility in Core Team meetings –LM visibility in issue resolution Large versus Small sites –Acreage is not a good indicator of complexity/difficulty Original Closure Sites (e.g., Fernald vs Ashtabula) Large (e.g., Richland) vs Small (e.g., ITL) sites –Number and diversity of stakeholders drives complexity/difficulty Stakeholder Relationships are Critical

The Less Obvious Part of Transition Site Transition guidance is generally good –Must be tailored to each site –No substitute for thought and discussion! Guidance of particular importance: –Definition of EM Completion (EM-1 memo: Feb. 12, 2003) EM Completion (long term response measures in place) Administrative Transfer (e.g., to DOE-LM, USFWS, private party) DOE Site Closure (real property transferred to non-DOE entity) –“Terms and Conditions” for Site Transition Between EM and LM (Feb. 15, 2005) Between EM and SC (Feb. 9, 2006) Between EM and NNSA (Sept. 5, 2006) 6

7 Surprising Challenges Identification and Disposition of RECORDS –Classified records (e.g., LM will not accept) –Electronic records (including GIS data) –Special records media (medical x-rays, 8 mm film, VCR tapes, audio cassettes, over-size drawings, vintage viewing equipment) –Court restrictions on release or storage of records –Database “systems” (e.g., home-grown applications) –“Orphan” records (identifying owners, uses) –Records Ownership clause (inconsistent interpretations and/or actual inclusion in contracts) –Seamless transfer of records necessary for EEOICPA

8 Surprising Challenges – cont’d. Development of Site Transition Plan (STP) invaluable to LTS&M scope definition and 5-year budget formulation Timely execution of Transfer Memo to CFO critical to Deputy Secretary’s issuance of Program Decision Memorandum (PDM) Real Property Management –Identification of historic real property instruments –Updates to real property instruments necessary for LTS&M –Turnover of records to Recipient Office Realty Officer Inconsistent jargon (LTS, LTRA, O&M, LTS&M) Physical Completion versus Regulatory Completion –Impact on timing for submission of Project Completion (Critical Decision 4) documentation

9 Transition process went well at original five Closure Sites EM goals were met Professional LM management Minimal old issues resurfacing Reduced cost post-closure LTS&M model works well EM Perspective on LM Performance

10 Along Came the Recovery Act Signed into law on Feb 17, 2009 Unprecedented Congressional action Priority at highest Federal levels –President –Congress –Secretary of Energy –Assistant Secretary for Environmental Management Unprecedented transparency and accountability $6 billion in additional funding for EM to be used by 2011 –FY10 budget was $6B –Recovery Act doubled EM’s FY10 budget execution

11 Recovery Act Project Priorities Scope that can most readily be accelerated to take advantage of Recovery Act funds –Soil and groundwater remediation –Radioactive waste disposition (e.g., TRU waste and Low Level Waste) –Facility decommissioning Site closure and EM completion –SPRU, BNL and SLAC –FY11 EM completions –FY12 transfers to DOE Recipient Offices Reduce the EM footprint –Across the country –Within a site

12 Footprint Reduction (e.g., Hanford Site) Recovery Act funded work that will contribute to Footprint Reduction goal: –Accelerate river corridor cleanup –Accelerate cleanup of areas for National Monument use Reduces environmental risk Results in 90% reduction of the site footprint

13 Definition of Footprint Reduction Applies to completion of environmental remediation and transfer of property (and LTS&M requirements, if any) to another organization (e.g., within the existing EM cleanup contractor, or to a separately funded mission-support type contractor) Above definition clearly appropriate for EM work funded by Recovery Act (i.e., near-term completion dates) Possible future (“Phase II”) definition of EM Footprint Reduction could include: –Administrative Transfer, as defined in EM-1 memo “Definition of EM Completion,” via: Programmatic responsibility transferred to LM, or returned to SC or NNSA Ownership transferred to another Federal agency Ownership transferred to State Government or Private entity

14 There are substantial contiguous tracts of land that may require LTS&M At non-continuing mission sites (at a minimum), there is a potential to transfer property “early” to LM for LTS&M –Proceeding with planned EM-internal transfers (in FY12) –“Final” transfers to LM soon after (no earlier than FY13) LM’s assumption of LTS&M management of “reduced footprint” gains share of DOE success for Recovery Act Same DOE benefits as original Closure sites –Better LTS&M management and mission alignment –Lower cost post-closure –“Closes the book” on EM Legacy scope Experienced personnel in both EM and LM Opportunity for Win-Win in EM and LM?

Summary EM transition experience has been positive …with many lessons learned. Early planning and discussion is critical …with broad stakeholder communication. Recovery Act may offer the next step in EM / LM cooperation for Footprint Reduction. 15