Status of LCLS A. Brachmann, SLAC National Accelerator Laboratory.

Slides:



Advertisements
Similar presentations
Soft X-ray Self-Seeding
Advertisements

LCLS-II Scientific Opportunities Workshops LCLS-II Status David Schultz 9-12 February 2015.
Necessity of Moving from Green Book to White Book M. Hadi Hadizadeh Yazdi International Scientific Meetings Office Iran October 26, 2002 Amman, Jordan.
SCUs for the LCLS-II HXR FEL SCUs for the LCLS-II HXR FEL P. Emma, et. al. July 9, 2014 Hard X-Ray (HXR) FEL for LCLS-II must cover 1-5 keV (4-GeV) SASE.
Research Opportunities at LCLS September 2011 Joachim Stöhr.
1 Enhancements to the Linac Coherent Light Source.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
The BESSY Soft X-Ray SASE FEL (Free Electron Laser)
James Welch October 30, FEL Commissioning Plans J. Welch, et. al. FEL Commissioning Plans J. Welch, et. al. Accelerator.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
Aymeric Robert XCS 11/12/2008 SLAC National Accelerator Laboratory 1 X -ray C orrelation S pectroscopy Instrument Aymeric.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
Opening Comments and Charge 19 January 2004 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
UCLA The X-ray Free-electron Laser: Exploring Matter at the angstrom- femtosecond Space and Time Scales C. Pellegrini UCLA/SLAC 2C. Pellegrini, August.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project Near term opportunities for LCLS 'upgrades' J. Hastings for the LCLS Experimental.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
1 Sébastien Boutet 1 Coherent X-ray Imaging Instrument FAC Meeting, June Coherent X-ray Imaging Instrument Sébastien Boutet.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
Latest Results on HXRSS at LCLS Franz-Josef Decker 4-Feb Seeding with 004, 220 and over-compression 2.Tuned beam with slotted foil cutting horns.
Slide 1 George R. Neil Associate Director Jefferson Lab Jefferson Avenue Newport News, Virginia VUV Program Directors Review Plans for a VUV.
Birth of the X-Ray Laser and a New Era of Science Joachim Stohr
Low Emittance RF Gun Developments for PAL-XFEL
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012.
Transverse Profiling of an Intense FEL X-Ray Beam Using a Probe Electron Beam Patrick Krejcik SLAC National Accelerator Laboratory.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
The Future of Photon Science and Free-Electron Lasers Ingolf Lindau Lund University and Stanford University MAX-Lab and Synchrotron Light Research KTH,
Option – 5m Undulators What is the optimum length for an LCLS undulator?  XFEL is using 5m undulator segments.  Is this optimum?  What are the advantages.
Brief Introduction to (VUV/)Soft X-ray FELs R. P. Walker Diamond Light Source, UK ICFA Workshop on Future Light Sources March 5 th -9 th, 2012 Thomas Jefferson.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
LCLS-II Capabilities & Overview LCLS-II Science Opportunities Workshop Tor Raubenheimer February 10 th, 2015.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
Basic Energy Sciences Advisory Committee MeetingLCLS February 26, 2001 J. Hastings Brookhaven National Laboratory LCLS Scientific Program X-Ray Laser Physics:
LCLS Facility Planning for LCLS-II. 2 LCLS vs. LCLS-II NowHXU - CuSXU - CuHXU - SCSXU - SC Photon Energy Range (eV)
LCLS-II Design and FEL R&D
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
LCLS-II: Accelerator Systems LCLS SAC Meeting P. Emma et al. April 23, 2010.
Lessons Learned From the First Operation of the LCLS for Users Presented by Josef Frisch For the LCLS March 14, 2010.
FEL Spectral Measurements at LCLS J. Welch FEL2011, Shanghai China, Aug. 25 THOB5.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
The Linac Coherent Light Source (LCLS) Free Electron Laser (FEL) Performance Program William S. Colocho, WAO, October 2014 With focus on Reproducibility.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
1 0.1-nm Hard X-ray XFEL  Project Period: 2011 ~ 2015  Total Budget: 400 M$  10-GeV Electron Linac (Normal Conducting S-band, 60 Hz)  Total Length:
LCLS-II options: CuRF → SXR, VPU, HXR harmonics G. Marcus 5/13/2015.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Operation and Upgrades of the LCLS J. Frisch 1,R. Akre 1, J. Arthur 1, R. Bionta 2, C. Bostedt 1, J. Bozek 1, A. Brachmann 1, P. Bucksbaum 1, R. Coffee.
LCLS-II: An upgrade for the LINAC Coherent Light Source
LCLS efforts: Self-seeding -- status report
Experimental Facilities Planning
Paul Scherrer Institut
LCLS Instrument Development
LCLS-II-HE FEL Facility Overview
Revised Commissioning Strategy
LCLS-II-HE FEL Facility Overview
Non-user time 2/7 of total
SLAC ARD Test Facilities
Multiplexing of LCLS II SXR beamlines using a canted undulator concept
TW FEL “Death-Ray“ Studies
WBS 5.0 LCLS Strategic Projects Division
John N. Galayda – Director of LCLS Construction March 30, 2009
Two-bunch self-seeding for narrow-bandwidth hard x-ray FELs
Optics John Arthur, SLAC & William W. Craig, LLNL April 24, 2002
Introduction to Free Electron Lasers Zhirong Huang
Presentation transcript:

Status of LCLS A. Brachmann, SLAC National Accelerator Laboratory

2 Introduction How do we operate Current Machine Performance Developments of the past year Future Outlook LCLS is operated by :  Accelerator Directorate  LCLS Directorate

3 Routine Operation 1.Currently we are in Run /7 Operation is (mostly) routine -5 days of experiment time -Typically 2 instruments of 6 share 5 day beam time (alternating 12 hour shifts) 2 Months of Run 7: CXI XPP XCS MEC AMO SXR

4 X-Ray Pulse Energies Records

5 Machine Development (MD) 1.MD time is shared between Accelerator and X-Ray instruments (60/40) 2.2 Days of Maintenance / Machine Development per week -Machine Development includes Accelerator and X-Ray instrument issues -Used to develop and implement new operational modes -May change schedule in the future to optimize available time for machine physics 3.Accelerator Uptime is 95 % (+) -Focus of MD work shifts more towards photon issues -Efficiency gain by optimizing X-ray Operation -For example beam sharing is part of this strategy

6 Accelerator Uptime Detailed tracking of accelerator performance is necessary to guide investment of very limited budget!

7 Recent Developments - HXRSS Hard X-Ray self seeding Successful demonstration of principle User operation has taken place Outstanding issues: Machine stability Diagnostics (mainly spectrometer for tune – up) 20 eV BW0.5 eV BW

8 Recent Developments – Low Energy Low Energy Operation 280 eV X-Rays (Previous limit ~ 580 eV) Enables science of Carbon and Nitrogen Main work is machine tuning for lower electron beam energy (2.2 GeV) Issues are -larger electron and photon beam sizes -Damage thresholds of X-Ray optics (B4C coated mirrors)  Machine apertures and Radiation Physics First user experiments have been conducted

9 What’s next … XTCAV XTCAV Transverse cavity downstream of the undulator Measurement of electron bunch length and pulse profile – correlate to X-ray bunch Ongoing project, commissioning in the spring/early summer of 2013

10 What’s next – DELTA Undulator DELTA undulator 3 meter delta undulator at the end of current undulator system Polarization control of X-ray beam Currently we are developing the prototype, mainly to ensure sound mechanical design and development of magnetic measurement technique Anticipated availability for users is about a year away Vacuum Chamber PROTOTYPE

11 What’s next … SXRSS SXRSS Soft X-ray seeding – similar to HXRSS but grating based Project just started …

12 Longer term ~ 2 year Additional undulators  towards TW Room for additional undulators Currently we have 5 additional undulators designated as spares Installed are 33 section (minus 1 for HXRSS, minus 1 for SXRSS) Several M$ project … Configuration choices have to be made (e.g. DELTA, SHAB’s, THz system) Need to include user community to arrive ata decision. Total possible undulator number of

13 What’s next … a lot more Accelerator energy jitter reduction Upgrade of 50 year old Accelerator Technology Improvement of pulse to pulse energy stability Benefits both SASE and seeded beams Many other smaller projects, e.g. Diagnostics – use THz radiation Updated RF controls and diagnostics - uTCA FEL tricks iSASE, multibunches, two color … Ryan Coffee

14 LCLS - II 1-km point Sectors of Linac (1 km) (with modifications) X-ray Transport Optics/Diagnos tics Bypass LCLS Linac In PEP Xport Line (extended) New Beam Transport Hall SXR, HXR Undulators s14

15 LCLS – II requires new facilities – construction is about to begin LCLS-1 beamline Extension of Beam Transport Hall (162m) Undulator Hall (302m) (302m) FrontEndEnclosure(92m) ExperimentHall 15m x 80 m UtilityPlant ServiceBuilding Access Road Main effort is anticipated for a significant duration mainly during 2014

16 LCLS – II Capabilities LCLS-II will provide expanded spectral range Up to 13 keV (above Selenium GeV Down to 250 eV (Carbon 7-10 GeV 302m undulator tunnel -Space to accommodate future enhancements: -Seeding -polarization control -TW peak power Tuning the X-Rays with both undulator gap and Electron Beam Energy

17 LCLS – II Immediacy LCLS II injector at Sector 10 – construction is underway Transition to operations in 2015 – 2016 time frame It will serve as an R&D facility befor LCLS – II linac and FEL commissioning Continuing resolution may delay progress … unknown still …

18 LCLS X-ray Facilities Far Experimental Hall Near Experimental Hall AMO SXR XPP XCS CXI MEC X-ray Transport Tunnel 200 m Start of operation Oct-09AMO November-11 XCS February-11CXI October-10XPP May-10SXR MEC May -12

19 Materials under Extreme Conditions (MEC) Instrument LCLS Science Update High Energy Density Science Shock Physics Warm Dense Matter

20 Proposal Statistics 177 proposals for beam time between July and March, 2014

21 LCLS Publication Statistics

22 Update on X-ray Beam Multiplexing XPP CXI MEC Double Crystal C*(111) First C*(111) crystal is 100µm thick (highly transmissive for X-rays outside Bragg reflection bandwidth) 71% beam transmission at 8.33 keV Wavefront distortion is minimal First simultaneous experiments test will occur in the near future The XPP Large-Offset Double-Crystal Monochromator now has a pair of diamond (111) crystals obtained through TISNCM (Moscow) and APS

LCLS Evolution – The Big Picture