©2008 Sponge-Jet Inc. All rights reserved. SPONGE JET BLASTING & CLEANING AT SUPERHEATED TUBING BOILER 1 Details of Project: Coverage Area: Approximately.

Slides:



Advertisements
Similar presentations
Antero Punttila Analyzing most typical energy saving measures Energy Efficiency of Steam and Condensate Systems Antero Punttila, Motiva Oy.
Advertisements

Mountings & Accessories
WHAT IS STEAM PRO? Thermoflow, Inc.
Boilers Dept. of Mech & Mfg. Engg..
SHOTCRETING K.V.SUBBA RAO.
M.D.Akole (President, MASMA). The total solar energy absorbed by Earth's atmosphere, oceans and land masses is approximately 3,850,000 exajoules (EJ)
Asphalt Materials.
SYNTHETIC RED OXIDE METAL PRIMER It has good anti-corrosive properties. It contains Zinc-chrome. Recommended for agricultural, steel structures & other.
Vector Technologies Ltd. Performance PROVEN VACUUM SOLUTIONS for over 30 years Vector Technologies Ltd. Milwaukee, Wisconsin USA.
RoboBlast USA Abrasive Blast And Vacuum System “ABAVS” Welcome to RoboBlast USA Abrasive blasting hasn't been very exciting...until now! Call Us at
GROUNDWATER CONTROL.
On-farm Bin Storage Sandra M. Frost UW Cooperative Extension Service.
Boiler Mountings.
Steam Power Plant.
Coal Burning System.
Vapor-compression refrigeration
Steam condensers Functions: Lowers back pr. of turbine exhaust Enables recovery and recirculation of feed water Enables the removal of air and non- condensable.
Busting The Myths of Wet Abrasive Blasting
PROJECT AND STUDY DRAWINGS & DIAGRAMS
Installing Quality Internal Tank Linings: A Perspective David Cushman West Virginia Paint LLC General Manager NACE Certified Coating Inspector #1591 Copyright.
STEAM PRO is a highly automated system design tool – a heat balance program specifically intended for design of steam power cycles.  Use STEAM PRO to.
Large equipment Safety: Before using any piece of equipment new staff should be fully trained to prevent accidents Always use guards for equipment Equipment.
STEAM CONDENSERS.
Refraction. 2 REFRACTION NOTE  the bending of light at the boundary of two transparent substances (or “media”)  occurs because different materials slow.
Lesson 7 Steam Power Plant.
Machining is processes in which we get a desired final shape and size from of raw material. 1.Conventional / Traditional Machining 2.Non Conventional.
 Single Component Products TT-P-1952E - Waterborne traffic paint TT-P-1952E - Waterborne traffic paint A-A-2886A - Solvent traffic paint A-A-2886A - Solvent.
Theory of Steam Generation P M V Subbarao Professor Mechanical Engineering Department Progressive Development of Power Generation through Steam Generation……
Illumination for Industrial Painting Projects Presented by: William Hansel, Caltrans.
9/30/ Module 3 Safe Work Practices. 9/30/ Video Segment: Safe Work Practices — Think about the following points as you view the video.
CHEMISTRY 2000 Topic #3: Thermochemistry and Electrochemistry – What Makes Reactions Go? Spring 2008 Dr. Susan Lait.
Engineering Controls for Silica Art Wickman, CIH Georgia Tech Safety & Health Consultation Program.
ABRASIVE JET MACHINE.
How to make “Touch Free” washing clean better. RYKO Manufacturing Company.
Duct Coating Technology
Manufacturing processes
CXS490 Carbon Dioxide Systems
© 2011 Pearson Education, Inc. All Rights Reserved Automotive Technology, Fifth Edition James Halderman ENGINE CLEANING AND CRACK DETECTION 29.
Hungarian green and clean technological innovations Science vs. Practice ROUND TABLE „ Mitigation of agricultural emissions with partial change of nitrogen.
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
Design of Food Freezing Equipments Presented by: madhu.
©2008 Sponge-Jet Inc. All rights reserved. 1 Removing Fire Damaged Coatings in Power Plant Mill fire damaged paint on pulverized fuel line Blast area covered.
©2008 Sponge-Jet Inc. All rights reserved. 1 Preparing Gas Pipeline Weld Seams on Po River Major river, spanning east to west Italy Sensitive residential.
Paint Removal from CMU and Brick Kenneth A. Trimber KTA-Tator, Inc.
ENERGY EFFICIENCY IN THERMAL UTILITIES AND SYSTEM
Changes in State Chapter 2 Section 2. Energy How does the ice go from being a solid back to being a liquid? Energy is the ability to do work Energy.
An Ice Blaster is a Portable Machine which Uses CO 2 Pellets to Clean Energized Equipment Power Source is a 120V Generator and Diesel Powered Air Compressor.
BILBOND H 4545 Formerly Bhavi International Ltd.
©2008 Sponge-Jet Inc. All rights reserved. 1 “Whitewater” Tank Preparation in Paper Mill Corrosion in whitewater tank of slushing area.
©2008 Sponge-Jet Inc. All rights reserved. 1 Tank Preparation Chevron Water Softener and Treatment Plant Chevron water softener and treatment tanks that.
Prepared by : Nishant .A. Raval
IOQ & CIHT Joint Meeting February 13 th Mel Taylor & Paul Davis Mobile Aggregate Washing Plant Presentation.
Why replace? When you can restore!. The MicroStrip System Low pressure, abrasive cleaning system Compressed air only / air & water Range of fine precision.
Automotive Engines Theory and Servicing
How to Select and Optimize Abrasive Blasting Equipment
Tray Drier Bernal Kim, Geo Dela Cruz, Patrick Dolot, Max
Interior of steel tank; 56sqm (600sqft) 50micron (2mil) profile
Automotive Industry Catalogue
NEW PLASTIC MEDIA BLASTING FACILITY FOR AIRCRAFT FIGHTERS AND HELICOPTERS ADAPTIVE TO THE MOST STRINGENT SPECIFICATIONS FOR ENVIRONMENTAL PROTECTION WORLDWIDE.
Automated Surface preparation
Applied Thermal Engineering
Chapter 5 The First Law of Thermodynamics for Opened Systems
Vapor-compression refrigeration
Air Blasting with Steel Abrasives
PLATE HEAT EXCHANGERS Gasketed plate heat exchangers
Chapter 5 Cleaning the Engine.
Footwear Industry Catalogue
Large Air Systems – Sales Training
William Corbett, Carly McGee and Jason Coley KTA-Tator, Inc.
Presentation transcript:

©2008 Sponge-Jet Inc. All rights reserved. SPONGE JET BLASTING & CLEANING AT SUPERHEATED TUBING BOILER 1 Details of Project: Coverage Area: Approximately total area round 600sq.mtr for 2 units 70 Tonne Boiler Superheater Tubing Mitsuibishi MY-N100 Duration: 13 th – 19 th September 2012 (2 units Boiler) Standard Surface Preparation: <6 microns Abrasive: 80/60 White Glass Bead Scope of Work: To blast & clean-up to SA2.5 averagely, and target to achieve ∆T from 4 0 to 10 0 using Sponge Jet Blasting System for 2 units boiler which the total area is calculated around 600sq.mtr.

©2008 Sponge-Jet Inc. All rights reserved. SPONGE JET BLASTING & CLEANING AT SUPERHEATED TUBING BOILER 2 General Arrangement of Mitsuibishi MY-N100 Boiler

©2008 Sponge-Jet Inc. All rights reserved. SPONGE JET BLASTING & CLEANING AT SUPERHEATED TUBING BOILER 3 Condition of superheated tubing before blasting & cleaning

©2008 Sponge-Jet Inc. All rights reserved. SPONGE JET BLASTING & CLEANING AT SUPERHEATED TUBING BOILER 4 Dry Ice CleaningSponge Jet Cleaning Considered as wet system and leaves watermark and need to be blow with dry air for complete cleaning. Not suitable for usage in confine space as the system could increase CO2 level in-situ (hazardous to blaster). Media need special storage facility otherwise it could easily evaporate (thus caused extra cost for storage). Slow in productivity and suitable only for small area. Dry cleaning system. Non-poisonous and Non-hazardous system for confine space. Normal storage facility for the media.  Higher productivity. Advantages of Sponge Jet Blasting compare to conventional blasting

©2008 Sponge-Jet Inc. All rights reserved. SPONGE JET BLASTING & CLEANING AT SUPERHEATED TUBING BOILER 5 Dry Ice CleaningSponge Jet Cleaning Complicated system - media need to be produce using special machine from raw CO2 and need to be use immediately after being produce (thus caused extra cost for the equipment). Inspection only comes after blasting completed - due to watermark effect and safety due to high CO2 level in confine space.  User friendly system.  Allow inspection during blasting

©2008 Sponge-Jet Inc. All rights reserved. SPONGE JET BLASTING & CLEANING AT SUPERHEATED TUBING BOILER 6 White Sponge Media TypeProfileCleaning Agent White Glass Bead Sponge Media <6 micron (<.25 mil)60/80 Mesh, Glass Bead Sponge Jet ® Media used: Table 1: White Glass Bead Sponge Media Properties Figure 1: White Glass Bead Sponge Media 60/80 Mesh

©2008 Sponge-Jet Inc. All rights reserved. SPONGE JET BLASTING & CLEANING AT SUPERHEATED TUBING BOILER 7 DescriptionSponge Jet Quantity of Media (kg)200 kg (1 st boiler) 200 kg (2 nd boiler) Recycle Factor6 Times Number of days4 Days (1 st boiler) 3 Days (2 nd boiler) * No Hiccups ManpowerSupervisor = 1 pax Blaster = 4 Pax Equipment Blasting Port / SJ Feed unit2 units Recycler2 units Compressor1 unit of 375 cfm Continuous Vacuum Recycler 1 unit Dust EmissionVery low, allow other trade e.g. welder, painter and etc to work nearby

©2008 Sponge-Jet Inc. All rights reserved. SPONGE JET BLASTING & CLEANING AT SUPERHEATED TUBING BOILER 8 Plan vs Actual Progress at Boiler A

©2008 Sponge-Jet Inc. All rights reserved. SPONGE JET BLASTING & CLEANING AT SUPERHEATED TUBING BOILER 9 Plan vs Actual Progress at Boiler B

©2008 Sponge-Jet Inc. All rights reserved. SPONGE JET BLASTING & CLEANING AT SUPERHEATED TUBING BOILER 10 Special design of extension nozzle used for blasting & cleaning

©2008 Sponge-Jet Inc. All rights reserved. SPONGE JET BLASTING & CLEANING AT SUPERHEATED TUBING BOILER 11 Special design of extension nozzle used for blasting & cleaning

©2008 Sponge-Jet Inc. All rights reserved. SPONGE JET BLASTING & CLEANING AT SUPERHEATED TUBING BOILER 12 Before After

©2008 Sponge-Jet Inc. All rights reserved. SPONGE JET BLASTING & CLEANING AT SUPERHEATED TUBING BOILER 13 Before After

©2008 Sponge-Jet Inc. All rights reserved. SPONGE JET BLASTING & CLEANING AT SUPERHEATED TUBING BOILER 14 Before After

©2008 Sponge-Jet Inc. All rights reserved. SPONGE JET BLASTING & CLEANING AT SUPERHEATED TUBING BOILER 15 Before After

©2008 Sponge-Jet Inc. All rights reserved. SPONGE JET BLASTING & CLEANING AT SUPERHEATED TUBING BOILER Design Temperature : 530 DegC Operating Temperature Before Cleaning : 420 DegC Operating Temperature After Cleaning : 500 DegC 16 Achievement: The Boiler ∆T achieve above target which is ∆T=50 0