9/10/2015 IENG 471 Facilities Planning 1 IENG 471 - Lecture 04 - 2 Schedule Design: The Sequel.

Slides:



Advertisements
Similar presentations
Airbus Production System
Advertisements

6/3/2014 IENG 471 Facilities Planning 1 IENG Lecture Schedule Design: The Sequels Sequel.
By Anastasia Lidya Maukar
Unit 2 Manufacturing Operations Sections: 1.Manufacturing Industries and Products 2.Manufacturing Operations 3.Production Facilities 4.Product/Production.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
CAPACITY LOAD OUTPUT.
4/27/2015 IENG 471 Facilities Planning 1 IENG Lecture 04 Schedule Design.
Process Selection and Facility Layout
WEEK 04C – PROCESSES AND TECHNOLOGY (CH 6) Process types and selection, automation, line balancing SJSU Bus David Bentley1.
Overall Equipment Effectiveness (OEE) 1 OVERALL EQUIPMENT EFFECTIVENESS (OEE) Factory Pulse Logix Automation Systems Pvt. Ltd.
Overall Equipment Effectiveness (OEE)
- Overall Equipment Effectiveness -
Introduction to Transfer Lines Active Learning – Module 1
Sources of Information for Manufacturing Facilities Design
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
Inventory Systems in Practice Or “How I got out of doing the last two questions on the final exam”
Environmentally Conscious Design & Manufacturing (ME592) Date: May 8, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 26: Data Dependent.
Rev. 09/06/01SJSU Bus David Bentley1 Chapter 6 – Process Selection and Facility Layout Process types and selection, automation, layout types, line.
Ch 3 Manufacturing Models and Metrics
Operations Management
Industrial Engineering
IE 368: FACILITY DESIGN AND OPERATIONS MANAGEMENT
Maintenance and Reliability
Dr. Cesar Malave Texas A & M University
I/O – Chapter 8 Introduction Disk Storage and Dependability – 8.2 Buses and other connectors – 8.4 I/O performance measures – 8.6.
1 Maintenance Performance Measures Management needs information of maintenance performance for planning and controlling the maintenance process. The information.
Chapter 4 Process Design.
Chapter 16 Selling the Layout. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Develop an appropriate.
11DSCI4743 Capacity Management Capacity management is planning & controlling resources needed to meet production objectives –Planning: determining resources.
10/25/2015 IENG 471 Facilities Planning 1 IENG Lecture Schedule Design: The Sequel.
Assembly Lines – Reliable Serial Systems
“Without the Cost of Waste …”
Mba Facility Layout u Basic layouts u Some layout techniques u Assembly line balancing u Service Layout.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
Maintenance and Reliability Decisions MGMT3057 © 2011 Pearson Education.
Maintenance McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
INTEGRATING RELIABILITY, AVAILABILITY, MAINTAINABILITY (RAM) AND SUPPORTABILITY IN REQUIREMENTS Bernard Price Certified Professional Logistician ACHIEVING.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
Chapter 6 Facilities Layout.
Maintenance Management [14]
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
KANZEN INSTITUTE ASIA PACIFIC 1 What is OEE ? OEE Overall Equipment Effectiveness Why is a high OEE important for the department ? OEE Calculation How.
Mean Time To Repair
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
5-1Capacity Planning William J. Stevenson Operations Management 8 th edition.
Logistics Engineering and Management Hank Okraski 26 October 2013 Refer Unit 11, M&S Curriculum.
Managing Product & Production Planning Reading: pp. 250 – 275.
MAINTENANCE ENGINEERING
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Hardware & Software Reliability
36.1 Introduction Objective of Quality Engineering:
IENG 451 / 452 Stability: Total Productive Maintenance
Professor Arne Thesen, University of Wisconsin-Madison
FACILITY LAYOUT Facility layout means:
Problem 6.15: A manufacturer wishes to maintain a process average of 0.5% nonconforming product or less less. 1,500 units are produced per day, and 2 days’
Capacity Planning For Products and Services
Capacity Planning For Products and Services
IENG 471 Facilities Planning Schedule Design
Scheduling Scheduling is an important tool for manufacturing and service industries, where it can have a major impact on the productivity of a process.
Facilities Planning and Design Course code:
Manufacturing Operations
Capacity Planning For Products and Services
Production and Operations Management
Operations Management
AVAILABILITY PERFORMANCE
Capacity Planning For Products and Services
Capacity Management Capacity management is planning & controlling resources needed to meet production objectives Planning: determining resources needed.
Presentation transcript:

9/10/2015 IENG 471 Facilities Planning 1 IENG Lecture Schedule Design: The Sequel

9/10/2015IENG 471 Facilities Planning 2 Agenda Assignments Schedule Design – Part 2: Estimating Equipment Needs (Equip. Frac.) Facilities Project Management Tools Questions & Issues

9/10/2015IENG 471 Facilities Planning 3 Assignments Assignment (Due Today - Now): HW:(HW 2) Product BOM Product Operation Process Chart Product Precedence Diagram Next Assignment: HW:(HW 3) See Assignment Link required input for each of the workstations equipment necessary for each machine steady state cycle time for each machine ideal machine assignment for each machine compute the idle time unit cost at each workstation total cost per good unit square footage for each workstation and the total space required

9/10/2015IENG 471 Facilities Planning 4 Equipment Requirements Equipment Fractions are the number of machines of one type required to produce the required volume of product(s) Some machines can be used to perform multiple operations… So, if idle time on the machine exists, and there are multiple products scheduled, then fewer total machines may be required! Some machines may not be able to perform the required operation(s) fast enough to reach the required volume with only one machine… So, more copies of the machine may be required!

9/10/2015IENG 471 Facilities Planning 5 Estimating Equipment Fractions The equipment fraction for each req’d machine is based on all of the operations the machine will perform Good thing we got those Operations Process Charts! To find the number of machines of a type for the facility: The number of workstations for a shift ( F ) is: where: S is the standard time to perform the operation, per unit Q is the quota of output units per shift E is the efficiency of production on the machine, expressed as a percentage of the standard operation time H is the hours available for production on the machine during the shift (or whatever unit of time matches parameter S ) R is the availability (reliability*) of the machine, expressed as % of the “up time” that the machine is available to work (% H )

9/10/2015IENG 471 Facilities Planning 6 Reliability Reliability is a measure of how often a system fails: How long (on average) you can run it until it stops working right How do you know that it’s not working right? MTTF (Mean Time To Failure) or MTBF (Mean Time Between Failures)

9/10/2015IENG 471 Facilities Planning 7 Maintainability Maintainability (serviceability) is a measure of how long it takes to return the system to proper operation: Sum of the times required to: diagnose the problem obtain repair parts / tools repair the failed components return the unit to operating conditions MTTR (Mean Time To Repair)

9/10/2015IENG 471 Facilities Planning 8 % Availability = MTTF MTTF + MTTR Availability Availability is a function of Reliability and Maintainability: It is the percentage of time that you can count on using it for production

9/10/2015IENG 471 Facilities Planning 9 Since the number of machines is an integer The lower bound on the number of machines required is 4 – the sum of the equipment fractions The upper bound on the number of machines required is 6 – the sum of the ceiling values for each operation… But … Equipment Fractions - continued Op. No. Equip. Fraction Integer Ceiling Total Req’d 46

9/10/2015IENG 471 Facilities Planning 10 Equipment Fractions - continued We should adjust the required number of machines to also account for: Frequency of changeover (flexibility) Set-up times Preventative maintenance Manufacturing policies… Therefore, the four machines estimate might not really be feasible … it assumed that everything was best case scenario!

9/10/2015IENG 471 Facilities Planning 11 Ex: Injection Mold Rubber Feet Process for juicer is: Mold & trim feet – 2% scrap rate Transport trimmed feet to line – 1% scrap rate Assemble juicer – 0.5% scrap rate 3 grams of rubber needed per foot Find the number of feet to be processed at each workstation! Find the raw rubber needed for this process!

9/10/2015IENG 471 Facilities Planning 12 Ex: Injection Mold Rubber Feet Shift is 8 hr, but reduced by two 15 min breaks, and 35 min machine warm-up (to heat the mold and material). Production schedule requires 2450 sets of feet daily MTTF is 38 hours MTTR comprises 5 min to diagnose, 55 min to obtain spare parts, 7 min to fix, 18 min to re-warm Run one shift per day Obtain one set of four feet per cycle Cycle time is 40 s (steady state) Find the equipment fraction for this process!

9/10/2015IENG 471 Facilities Planning 13 Questions What is the machine fraction if, instead: A Manufacturing Engineer suggests using a four unit mold instead of a single unit mold? An Industrial Engineer suggests running three shifts, eliminating daily warm-up time? An improved facility design reduces the time to get spare parts to 2 min, and the re-warm time to 1 min?