Der John Deere Produktentwicklungsprozess als Werkzeug von der Qualitätsplanung bis zur Kundenzufriedenheit.

Slides:



Advertisements
Similar presentations
THAI TOKO ENGINEERING CO.,LTD.
Advertisements

11 Branded Replacement Cartridge Program Presented By.
Six Sigma Overview.
George Spyrou, Financial Manager Navigo Shipmanagers, Limassol, Cyprus
Slide 1 Insert your own content. Slide 2 Insert your own content.
Chapter 24 Quality Management.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 3.1 Chapter 3.
International Organization International Organization
Information Services Directions at PennDOT Richard H. Harris, Jr.. Director Center for Performance Excellence (717) Pennsylvania Department of.
International Organization
1 Practical Work and Experience With Performance Management ICAO Performance Management Symposium John Crichton, President and CEO NAV CANADA March 28,
0 - 0.
Company Code of Conduct. 1.Commercial sustainability by caring for our stakeholders Profits for Sustainable Growth Our Stakeholders: –Customers, trade.
Insert image here © SPEC-Soft SAVINGS AND EXPERTISE FOR YOUR PLANT PFS-Suite Life-cycle Tools For Process Automation PFS-Suite TM.
1 What is Supply Chain Management (SCM)? The Council of SCM Professionals (CSCMP) definition: SCM encompasses the planning & management of all activities.
COST OF POOR QUALITY Calculating the cost of poor quality allows an organization to determine the extent to which organizational resources are used for.
Medical Device Software Development
Abstract To provide efficient and effective access to enterprise information that meets stakeholder needs and supports mission success, NASA is implementing.
Professional Services Overview
Strategic Capacity Planning for Products and Services McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1 INCOSE Chesapeake Chapter Enterprise SE Panel Discussion L. Mark Walker/LMC 21 March 2007.
Checking & Corrective Action
Figures-Chapter 2.
Environmental Management Systems Refresher
Software Processes.
FRPA Resource Evaluation Program and Resource Stewardship Monitoring Quality Assurance 2005/06 Quality Assurance update March 1, 2006.
Security metrics in SCADA system Master of Computer and Information Science Student: Nguyen Duc Nam Supervisor: Elena Sitnikova.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 27 Slide 1 Quality Management.
Quality Management Awards and Framework
The Quality Professional Vincent Desmond Director Development WQD 2009.
[Organisation’s Title] Environmental Management System
OHT 5.1 © Marketing Insights Limited 2004 Chapter 5 E-business Strategy.
Gap Analysis Gap Analysis Slide Presentation
Side 1 / JO 3 Quality Managment System JAR-OPS 3.035/037 Possible needs for revisions before EASA?
1 Important Changes to the Victorian Electricity Industry for Electrical Infrastructure Civil Works 1 July 2009.
©Ian Sommerville 1995/2000 (Modified by Spiros Mancoridis 1999) Software Engineering, 6th edition. Chapters 1,3 Slide 1 Software Engineering Software Engineering.
Copyright © 2011 Pearson Education, Inc. Publishing as Prentice Hall Ch Chapter 10 Business Ethics/ Social Responsibility/ Environmental Sustainability.
Quality Auditing Dr Alan G Rowley
Eaton Business System Overview
Chapter 11: Systems Development and Procurement Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall Chapter
Massachusetts Digital Government Summit October 19, 2009 IT Management Frameworks An Overview of ISO 27001:2005.
Presentation audit workandfamily Staatliches Gütezeichen  Awarded by the Federal Minister for Families and Youth  Valid for 3 years after bestowal.
Copyright © 2004 Pearson Education Canada Inc Personal Selling Today Introduction and Overview CHAPTER.
1 © 2006 Superfactory™. All Rights Reserved. Design for Lean and Six Sigma Superfactory Excellence Program™
 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Chapter 15 Implementing and Validating the Quality System.
SIX SIGMA. What is six sigma? Sigma is a measure of “goodness: the capability of a process to produce perfect work. A “defect” is any mistake that results.
Product Lifecycle Management Cost of Quality Pasi Kaipainen, Mika Huhta.
Basic Concepts of Quality Philosophy
Using Six Sigma to Achieve CMMI Levels 4 and 5
1 Industrial Design of Experiments STAT 321 Winona State University.
How get your project management or professional services organization ISO 9001 certified.
CMS 00_ Copyright 2002 Raytheon Company All Rights Reserved CMMI – What a Difference a Sponsor Makes! Ann Turner Raytheon Company
By: Nick Blank March 1, Six Sigma Definitions Goals History Methods Roles Benefits Criticism Software Development.
CSI - Introduction General Understanding. What is ITSM and what is its Value? ITSM is a set of specialized organizational capabilities for providing value.
NDIA Systems Engineering Supportability & Interoperability Conference October 2003 Using Six Sigma to Improve Systems Engineering Rick Hefner, Ph.D.
Project proposal for ISO :2011 implementation Subtitle or presenter.
SEI CMM Robert Johnson Bobby Kolski Rafi Seddiqi Kumeel Alsmail.
© 2007 Pearson Education Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 16 Implementing and Validating the Quality System.
Phase 3: DEVELOPMENT & VALIDATION
10 TOTAL PRODUCTIVE MAINTENANCE (TPM) Zulfa Fitri Ikatrinasari, Dr.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
 The concept of Quality is very broad and can be defined in various way:  From the customer point of view: (Specification Quality) › Quality is the.
Product Lifecycle Management
BIL 424 NETWORK ARCHITECTURE AND SERVICE PROVIDING.
Six Sigma Approach.
EOB Methodology Overview
APQP Quality Planning in ISO 9000/ QS-9000 or ISO/ TS or .....
APQP PROCESS FLOW Prepare for APQP Plan and Define Program
PRODUCT QUALITY PLANNING CYCLE
Presentation transcript:

Der John Deere Produktentwicklungsprozess als Werkzeug von der Qualitätsplanung bis zur Kundenzufriedenheit

Gliederung: Das Unternehmen – Deere & Company Der Produktentwicklungsprozess Der „Total Quality Process“

John Deere „Ich werde niemals meinen Namen auf ein Produkt setzen in dem nicht das Beste steckt, das ich zu geben vermag“

JOHN DEERE - Produkte Traktoren, 39 – 331 kW

Product Delivery Process Time Line 1999 2000 2001 2002 2003 Strategic Business Plan Program Definition Concept Selection Product Development Implementation & Verification Continuous Improvement

Der „Total Quality Process“

Total Quality Process Customer Support Process Customer Acquisition Employee Training & Planning Quality Goals Setting & Review Metrics and Data Analysis PIP Fix As Fails Quality Initatives DQ 10 & WWCA FMEA DPAR Control Plan PPAP Supplier Certification Early Supplier Involvement Supplier Strategy AE Specification Reviews Drawing Audit PV&V ISO 9001/14001 Product Audit Pre Delivery Check First Time Yield Internal Process Audit Internal Module External Module Six Sigma Way (Technology) Test Stand Customer Support Process Customer Acquisition Process Order Fulfillment Process Enterprise Product Delivery Process

Product Delivery Process Time Line 1999 2000 2001 2002 2003 Strategic Business Plan Program Definition Concept Selection Product Development Implementation & Verification Continuous Improvement Customer Focus Group Meetings

Product Delivery Process Time Line 1999 2000 2001 2002 2003 Strategic Business Plan Program Definition Concept Selection Product Development Implementation & Verification Continuous Improvement Customer Focus Group

Total Quality Process - Phase I Quality Goals Setting & Review Metrics and Data Analysis Employee Training & Planning Quality Goals Setting & Review Metrics and Data Analysis PIP Fix As Fails Quality Initatives DQ 10 & WWCA FMEA DPAR Control Plan PPAP Supplier Certification Early Supplier Involvement Supplier Strategy AE Specification Reviews Drawing Audit PV&V ISO 9001/14001 Product Audit Pre Delivery Check First Time Yield Internal Process Audit Internal Module External Module Six Sigma Way (Technology) Test Stand Customer Support Process Customer Acquisition Process Order Fulfillment Process Enterprise Product Delivery Process

Product Delivery Process Time Line 1999 2000 2001 2002 2003 Strategic Business Plan Program Definition Concept Selection Product Development Implementation & Verification Continuous Improvement Customer Focus Group Durability & Pilot Builds Tractor Builds

Product Verification & Validation (PV&V) Process PV&V Plan Risk Assessment Optimization Design Analysis Simulation Components / System Build Lab Test Verification Ensures adequacy of design per product performance and functionality specifications Validation Ensures that design meets or exceeds customer expectations Durability / Prototype Build Field Test

Verification Plan

Product Delivery Process Time Line 1999 2000 2001 2002 2003 Strategic Business Plan Program Definition Concept Selection Product Development Implementation & Verification Continuous Improvement Customer Focus Group Durability & Pilot Builds SOP Start of Production Start of Production