Collaboration to Meet Future T&E Needs ITEA 14 September 2010 1 Mr. Mike Crisp Deputy Director, Air Warfare Operational Test and Evaluation.

Slides:



Advertisements
Similar presentations
DoD Logistics Human Capital Strategy (HCS) Executive Overview 1 October 2008.
Advertisements

Consensus Building Infrastructure Developing Implementation Doing & Refining Guiding Principles of RtI Provide working knowledge & understanding of: -
CURRENT STATE OF ACQUISITION, TEST & EVALUATION ENTERPRISE NOVEMBER 2012 PRESENTATION TO INCOSE ENCHANTMENT CHAPTER Charles Pete Adolph.
Portfolio Management, according to Office of Management and Budget (OMB) Circular A-16 Supplemental Guidance, is the coordination of Federal geospatial.
12 August 2004 Strategic Alignment By Maria Rojas.
Bryan Roach Chairman Crime Stoppers Australia. Strategic Planning The process for defining strategy (direction) and decision making For Crime Stoppers,
Leverage MarkITS for agile solutions delivery that balances strategic thinking with tactical execution for “Business & Technology Convergence” MarkITS.
Optimize tomorrow today. TM Cost and Affordability approach at Development Planning stage 1.
© 2009 The MITRE Corporation. All rights Reserved. Evolutionary Strategies for the Development of a SOA-Enabled USMC Enterprise Mohamed Hussein, Ph.D.
Title I Schoolwide Providing the Tools for Change Presented by Education Service Center Region XI February 2008.
ERS Overview 5/15/12 | Page-1 Distribution Statement A – Cleared for public release by OSR, SR Case #s 12-S-0258, 0817, 1003, and 1854 apply. Affordable,
Design of Experiments Greenbrier Circle Suite 305 Chesapeake, VA Phone: Fax: Presenter: Chris Hauser.
Distribution Statement A: Approved for Public Release; Distribution is unlimited. 2 Crane of the Future: A VITAL ENTERPRISE 29 MAR 2011 Patricia Herndon.
Principles of Management Learning Session # 24 Dr. A. Rashid Kausar.
Role of RAS in the Agricultural Innovation System Rasheed Sulaiman V
Distribution Statement A: Approved for Public Release; Distribution is unlimited. 1 Electronic Warfare Information Operations 29 MAR 2011 Val O’Brien.
Measuring for Success NCHER Legislative Conference Sophie Walker September 26, 2013.
V i s i o n ACCOMPLISHED ™ Portfolio Management Breakthroughs Shelley Gaddie President Project Corps Pacific Northwest Portfolio Management Roundtable.
Systems Engineering in a System of Systems Context
Program Management Overview (An Introduction)
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
IT Governance and Management
SE 555 Software Requirements & Specification Beyond Requirements Based on Weigers Chapter17.
AFROSAI-E COOPERATION WITH WGITA African Organisation of English-speaking Supreme Audit Institutions.
The NIH Roadmap for Medical Research
8/27/20151NeST Controlled. 2 Communication Transportation Education Banking Home Applications.
Critical Role of ICT in Parliament Fulfill legislative, oversight, and representative responsibilities Achieve the goals of transparency, openness, accessibility,
DEFINITION OF MANAGEMENT
NDIA SE Division Meeting February 13, Developmental Test and Evaluation Committee Beth Wilson, Raytheon Steve Scukanec, Northrop Grumman Industry.
Software Development *Life-Cycle Phases* Compiled by: Dharya Dharya Daisy Daisy
Project Management: Still More Art Than Science Presented By Donald W. Larson AC Bronze, CL June 6, 2007.
CLEANROOM SOFTWARE ENGINEERING.
ATEC’s Support to GWOT James J. Streilein, Ph.D. 20 March 2009.
UNCLASSIFIED Joint and Coalition Warfighting Mr. John Vinett March 2012 Technical Baseline Capability.
Mr. Frank J. Anderson, Jr. President, Defense Acquisition University Acquisition Education Challenges and the Human Capital Strategic Plan.
Elementary & Middle School 2014 Mathematics MCAS Evaluation & Strategy.
NCAR Annual Budget Review October 8, 2007 Tim Killeen NCAR Director.
Mission The faculty and staff of Pittman Elementary School are committed to providing every student with adequate time, effective teaching, and a positive.
“Positive Beginnings” Michael White A/Executive Director, Office for Children Department of Education and Early Childhood Development Presentation to Best.
Chapter 2 Process: A Generic View
DEVELOPMENTAL TEST & EVALUATION DT&E – From Concept to Combat Integrated Test Process Darlene Mosser-Kerner Developmental Test & Evaluation OUSD(AT&L)/Systems.
“Thematic Priority 3” Draft Evaluation of IP + NoE.
STRATEGIC PLAN DEPUTY CHIEF OF STAFF FOR PERSONNEL, INFRASTRUCTURE AND LOGISTICS U.S. ARMY TRAINING AND DOCTRINE COMMAND OCTOBER 2005.
Technology Transfer Execution Framework. 2 © 2007 Electric Power Research Institute, Inc. All rights reserved. Relationship Between Your EPRI Value and.
Resourcing the Mission: The New Internal Financial Model.
Government Procurement Simulation (GPSim) Overview.
Software Product Line Material based on slides and chapter by Linda M. Northrop, SEI.
Lecture 4. IS Planning & Acquisition To be covered: To be covered: – IS planning and its importance Cost-benefit analysis Cost-benefit analysis Funding.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
Click to edit Master text styles Second level Third level Fourth level Fifth level 2 The Need TRANSFORMATION DEMANDS REFORM TRANSFORMATION DEMANDS REFORM.
Quality Assurance Project Makerere University Report on Activities of the No Cost Extension Dr Ddembe Williams Project Manager Dr Lillian Tibatemwa-Ekirikubinza.
UNCLASSIFIED DISTRIBUTION STATEMENT A – Cleared for public release by OSR on Sep – SR case number 10-S-3203 Developmental Test & Evaluation Presented.
Life Cycle Cost Savings by Improving Reliability Dr. Charles E. McQueary Director, Operational Test and Evaluation January 15, 2009.
Software Engineering (CSI 321) Software Process: A Generic View 1.
U.S. Department of Agriculture eGovernment Program Smart Choice Pre-Select Phase Transition September 2002.
LOG235/236 Performance Based Logistics Bruce Hatlem Logistics Functional IPT September 2007.
CAREER PATHWAYS THE NEW WAY OF DOING BUSINESS. Agenda for our Discussion Today we’ll discuss: Career Pathways Systems and Programs Where we’ve been and.
Leadership Guide for Strategic Information Management Leadership Guide for Strategic Information Management for State DOTs NCHRP Project Information.
UTPA 2012: A STRATEGIC PLAN FOR THE DIVISION OF BUSINESS AFFAIRS Approved by the Vice President for Business Affairs: December 2,  Provide students.
Supporting measurement & improvement of primary health care (PHC) at the facility and community levels Dr. Jennifer Adams, Deputy Assistant Administrator,
Job Titles Examples Used for HISD Nonexempt Jobs
Updating the Value Proposition:
Cumulative IOT&E Results Through FY 2008
Transforming The Way We Think and Work
Institutionalizing a Culture of Statistical Thinking in DoD Testing
13 November 2018.
Operational Test & Evaluation
Engineering Autonomy Mr. Robert Gold Director, Engineering Enterprise
OPERATIONAL TEST & EVALUATION PERSPECTIVE
Perspectives on Transforming DT and OT Industry-Government Roundtable
Presentation transcript:

Collaboration to Meet Future T&E Needs ITEA 14 September Mr. Mike Crisp Deputy Director, Air Warfare Operational Test and Evaluation

Need vs. Speed vs. Cost: A Balancing Act in Acquisition Requirements Process stressed in Meeting Today’s Needs DoD Budgets Under Pressure Warfighter Demand Cycle inside Acquisition OODA Loop Concurrent Development, Production, Operations, and Support –Program Managers doing it all Configuration Control –How many one or two of a kind can we manage? DoD Acquisition Life Cycle Framework –Complex Systems Integration in Fluid Operational Environments –Adaptive and Flexible enough to support rapid fielding? JUONS, Rapid Block upgrades, Milestones, Increments Innovative and Adaptive Approaches Required

3 Challenges for Building Effective Integrated Test Partnership Limited Test Resources: Range Capabilities, Size, Forces (Manpower & Materiel) Limited Test Time: Fielding & Production Schedules, Range Availability Limited Test Articles: Unit Cost, Production Time Requirements Validation: Do requirements satisfy mission requirements? Are they unambiguous, testable and technically realistic? Test Planning: Integrated test approach or serial? Active Participation in T&E WIPT? Early Identification of Operational Test Requirements? Test Execution: Operationally Representative Test Environments? Integrated Test Approach and Partnering Can be Improved

DOT&E Initiatives 4 Integrated Testing Developmental Operational Live Fire Improve Suitability Reliability Growth Testers Engage Early Requirements are Unambiguous Testable Relevant to mission accomplishment Technically Realistic Field New Capabilities Rapidly Accelerated Testing

Rapid Fielding Number One Priority of SECDEF Examples: –Extended Range Multi-Purpose UAS Early Fielding Report based on Customer Test –Project ODIN ATEC Observations Led to Improved Effectiveness –MRAP DoD 5000 Process Adapted for Rapid Development 55 ERMP UAS Counter IED OPS MRAP Live Fire Test Field New Capabilities Rapidly Accelerated Testing

Engage Early DOT&E Action Officer as a Team Member –Requirements Validation Do requirements satisfy mission requirements? Are they unambiguous, testable and technically realistic –Test Planning Active Participation in T&E WIPT Early Identification of Operational Test Requirements –Test Execution Operationally Representative Test Environments 6 Testers Engage Early Requirements are …

Integrated Testing Weapon System Acquisition Reform Act –Established Director of Developmental Test –Formally Implemented Integrated Testing Test Process as a Continuum –Developmental Testing –Live-fire Testing –Operational Testing Optimize Testing for Program Execution –Design of Experiments –Operational Test Evaluation Utilizes All Data 7 Integrated Testing Developmental Operational Live Fire

Improve Suitability After System Effectiveness... Suitability is the Key Concern 8 Improve Suitability Reliability Growth Systems frequently judged Un-Suitable Reliability and Maintainability account for 80% of Not Suitable ratings

Implementation (Continued) Integrated Testing –Test Process as a Continuum Developmental Testing Live-fire Testing Operational Testing –Use Statistical Analysis Data Collected over Long Period & Multiple Tests Design of Experiments Normalization of Data 9

10 Common Activities Replicating the “real world” environment as closely as practical Need for a distributive live/virtual/constructive (LVC) representation of the Joint Operational Environment Development and use of validated Tactics, Techniques, and Procedures (TTPs) Development of COCOM/JS approved Joint Mission Threads Data collection, management, archiving, and retrieval processes The Test and Training Communities are Missing Opportunities for Cost-effective, Relevant Partnerships

11 Common Activities Replicating the “real world” environment as closely as practical Need for a distributive live/virtual/constructive (LVC) representation of the Joint Operational Environment Development and use of validated Tactics, Techniques, and Procedures (TTPs) Development of COCOM/JS approved Joint Mission Threads Data collection, management, archiving, and retrieval processes The Test and Training Communities are Missing Opportunities for Cost-effective, Relevant Partnerships

12 Bottom Line on What’s Needed Strong partnership between the COCOMS, Test, and Training communities Committed leadership for strategic institutional funding, co- investment, and cross-community management of joint test and training resources and infrastructure –Need to overcome preference for OPM (Other People’s Money) –Need to continue to work towards implementation of joint test and training roadmaps It Takes Time and Effort – but Potential for Increased Efficiencies and Effectiveness Justifies Both

Design of Experiments (DOE) Test planning is a science! DOE is a scientific tool for developing robust test plans. DOE equips us to determine: –Power –Confidence –Breadth of coverage The iterative nature of DOE facilitates Integrated Test design DOE Manage Plan Test Design Analyze

Design of Experiments Integrated Test – DOE Approach –Inform each stage of testing from previous tests. –Span the battlespace through a compilation of tests. –Use screening experiments in DT to ensure a rigorous OT. DOE Provides: –Most powerful allocation of test resources for a given number of tests. –A scientific, structured, objective way to plan tests. –An approach to integrated test. –A structured, mathematical analysis for summarizing test results. Developmental Test DT/OT Testing Operational Test 14

Design of Experiments:JASSM-ER Binomial Distribution was Primary Method to Establish JASSM-ER Integrated Test Design Resulted in 21-shot Design Assumes ≤ 2 failures, to Demonstrate 0.80 Reliability with 80% Confidence 24 Factors Considered; Refined Design by Reducing Factors Previously Evaluated in Baseline JASSM OT Primary Factors: Range, Release Mach, Release Altitude, & Target Type Ensures Key Performance Differences between Baseline JASSM & JASSM-ER are Evaluated 21-event Test Design Created Using ¾–fractional Design to Estimate Main Effects & Interactions with Range Uses 5 Combined DT/OT Shots 15

Conclusion Our Goals –Greater Rigor and Effectiveness in Testing –Introduce New Statistical Developments Results –Better Confidence, Power & Breadth in Tests Our Products –More Effective and Suitable Systems Rigor is Key to Constructing & Executing Efficient Tests Only Efficient Testing can be Defended in the Current and Future Budget Environment 16

Questions 17