K. Long, 2 December 2014 Spokesman’s update 1. Contents: Update Step IV – Installation and commissioning – Preparations for data taking Shift tool; CHEESE.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
K. Long, 13 June, 2015  Target K. Long, Friday, 24 th April 2009.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
Project Managers Report Video Conference 172 Roy Preece 11 th December 2014.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
MICE - UK Project Progress Roy Preece 30 th April 2013.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Project manager report paul drumm CM16 October 2006.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
1 MICE CMPB Contents: Progress to date Project management things Plans for the May shutdown Steps towards Phase Two Problems and open issues summary Andy.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
Executive Board Meeting Roy Preece 23rd May 2014
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
1 MICE CM28 Schedule & Risk Comment Schedule reconstruction and management The ‘straight to Step IV’ discussion How a schedule meeting can work Risks (and.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Spectrometer solenoid 2. Magnetic shielding 3. Next Collaboration meeting.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
SPOKESMAN’S UPDATE K. Long Imperial College London/STFC.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
MICE CM32 25 th February 2012 Magnet Group Report Vicky Bayliss Victoria Blackmore John Cobb Mike Courthold Roy Preece Mike Zisman 1.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
Communication Tools Used For Commissioning the 12 GeV CEBAF Accelerator Brian Freeman WAO (Mainz, Germany) October 2014.
MICE CM41 – CB summary Alain Blondel 1 Collaboration Board at CM41 Summary Alain Blondel.
S A Griffiths CM42 June 2015 Electrical & Control.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Step IV Step IV extended through 2016 QP/QD – in progress at FNAL Target dates SSU ECE for Feb now only 20% probability – no-field Feb Remainder for April/March.
Muon Ionisation Cooling Experiment Overview
K. Long Imperial College London/STFC
MICE CM28 Engineering Session Summary (On behalf of Wing)
Step IV PRY Preparation - Contents
MICE CM31 Schedule summary
19th meeting of the WG GES 22/03/2018
Presentation transcript:

K. Long, 2 December 2014 Spokesman’s update 1

Contents: Update Step IV – Installation and commissioning – Preparations for data taking Shift tool; CHEESE MICE run 08Mar15 – In coincidence with activation study requested by ISIS – Mock data run Papers CM41 2

UPDATE: Spokesman’s update 3

Update: MICE Hall: – Floor plates etc. installed: Ready for delivery of PRY legs – Rack Room 2: Spectrometer and focus-coil racks delivered from DL … – … and installed Cabling and other preparation work now underway PRY: – First set of legs packed and ready to go in NY: Expecting delivery at RAL very soon – Machining of magnetic-shielding plates underway: Parallelisation of manufacture to expedite completion Services etc.: – Many “small” items: Particular examples include: – Flushing water for West Wall compressors; rerouting cables, … 4

STEP IV: Spokesman’s update 5

Installation and commissioning: Concerted effort in preparation for the mock data-run … – … and of course yesterday too! … highlights the challenge ahead: – Scheduling: Installation; Maintenance and repair; Commissioning and operations John Govans (Hall Manager) now operating a “job-card” system: – Week’s work discussed and agreed with the Project Manager (Roy Preece), Project Engineer (Andy Nichols) and Spoke each Friday: Point is to protect technical staff from urgent requests which will “just take a few minutes” but displace tasks essential for the completion of the experiment; Your route into the system: – Programmes of work are coordinated: For the construction project: – By the Proj. Eng. (Andy Nichols) and the work-package mangers; For the operations: – By the Operations Coordinator (Steve Boyd) and the system coordinators; The MICE Integration Scientist (Pierrick Hanlet) and the Beamline Integration Scientist (Jaroslaw Pasternak) have the responsibility of bringing issues of coordination to the MIPO and MEMO so that the activities can be dove-tailed. Please be part of the solution: – Plan your work early and send in the request … … minimise your stress by passing on your requirements before they become issues! 6

Preparation for for data taking: Shifts: – Data taking time reduced by a factor of two if we have to run 16/5 rather than 24/7 – Shift tool CHEESE released to Group Leaders (CB): Please complete the shift personnel for your group: – By CM41 we need to be sure we can run a safe operation » This is a hard deadline for a hard decision! Next MICE data run: – 08Mar15 in coincidence with the ISIS activation run: Identified that closing the Hall for the day does not conflict with the PRY installation; So, have agreed with Roy Preece that 08Mar15 will be reserved for MICE operation/data taking: – This is the next major operations/commissioning milestone; » Need to prepare and be ready to take good data! 7

Mock data-run: Debrief from protagonists to follow, so only a word from me … – Congratulations! Most of our systems brought up and operated; – A very important step! A list of issues to be addressed gathered: – Need to discuss, prioritise and address: » Of course, as many as possible by 08Mar15 8

Papers: Progress/drafts will be presented at CM41 Work organised; focus on getting experiment off the ground 18Dec14; lattice freeze (milestone, complete) (final tweaks now underway); JBL editor. Updated draft to be presented at CM41 Draft being assembled. 9

CM41 Spokesman’s update 10

Please register! – Agenda is going live now … Reminder: – No EU passport holders require a letter of invitation: All you have to do is ask Debbie or Rose: – 11