Mu2e WGM 9/15/2010 R. Ray Mu2e Project manager. L2 Systems and Managers R. Ray - Mu2e WGM2 1.2 Accelerator S. Werkema FNAL 1.3 Conventional Construction.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
Advertisements

Mu2e WGM 2/22/2011 R. Ray Mu2e Project manager. CD-1 Our sole focus is on CD-1 and in particular, the Director’s Review scheduled for April 3-5. To be.
Mu2e WGM 4/21/2010 R. Ray Mu2e Project manager. Project Team We have a L2 manager for the tracker!  Aseet Mukherjee has assumed this role  Experience.
Mu2e Project Overview Mu2e WGM R. Ray 3/17/ /17/ Mu2e WGM.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Status of Mu2e Solenoids Michael Lamm for the Mu2e Project Working Group Meeting March 17, 2010 Organization Technical Progress Cost and Schedule.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Mu2e WGM 7/27/2011 R. Ray Mu2e Project manager. Director’s Review We have settled on date for the Director’s CD-1 Review; Oct Focus of review will.
Fermilab Implementation of DOE Critical Decision Process FRA Project Management System Presentation by L Edward Temple Jr Head, Office of Project Management.
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
Mu2e Mu2e Status Andy Hocker, Technical Division All-Experimenters Meeting 8-JUN-2015.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Mu2e WGM 6/16/2010 R. Ray Mu2e Project manager. L2 Systems and Managers R. Ray - Mu2e WGM2 1.2 Accelerator M. Syphers FNAL 1.3 Conventional Construction.
Fermilab, Proton Driver, Muon Beams, Recycler David Neuffer Fermilab NufACT05.
NOvA Project Status April 3, 2007 John Cooper Ron Ray Nancy Grossman.
NuMI Lessons Learned DOE Perspective Who am I? Steve Webster – a DOE Federal Project Director at the Fermi Site Office Role during NuMI – was the Deputy.
7/26/2006 Wyatt Merritt 1 DECam Preparations for Critical Decision 2/3a Preparations for CD2 Preparations for CD3a DECam MOUs.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Mu2e Experiment and Issues Rick Coleman, Fermilab RESMM’12, February 2012.
Mu2e WBS 2 Accelerator Progress Report Mu2e WGM 6/15/2011 Steve Werkema L2 Manager for the Accelerator Systems.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
Project Overview Ron Ray Mu2e Project Manager Fermilab Sept. 26, 2008 Preliminary Director’s Review of mu2e Fermilab.
Mu2e WGM 10/20/2010 R. Ray Mu2e Project manager. Why does the building have to go in the middle of a road? R. Ray - Mu2e WGM2.
Mu2e WGM R. Ray Mu2e Project Manager Sept. 14, 2012.
Executive Session Director’s CD-1 Review of the Mu2e Project April 3, 2012 Elaine McCluskey.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
Mu2e Cost and Schedule Ron Ray Mu2e Project manager Fermilab PAC Meeting November 3-4, 2008.
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Mu2e WGM 11/16/2011 R. Ray Mu2e Project manager. Review of the past few months In September it became apparent that the cost of Mu2e was well in excess.
University of Minnesota Internal\External Sales “The Internal Sales Review Process” An Overview of What Happens During the Review.
June 17, 2004 / Collab Meeting Strategy to reduce uncertainty on a  to < 0.25 ppm David Hertzog University of Illinois at Urbana-Champaign n Present data.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
TD Designs for mu2e Solenoid Magnets Michael Lamm for the Mu2e Collaboration and TD/Magnet Systems Dept. All Experimenters’ Meeting January 25, 2010.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
LHC CMS Upgrade Project CD-1 Alternative Selection and Cost Range Steve Webster Federal Project Director August 26, 2013 CD-1 Executive Session.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
DUSEL Beamline Working Group Meeting March 09, :00 AM – Snake Pit (WH2NE) By Dean Hoffer - OPMO.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
COMET. μ-e conversion search from muonic aluminium J-PARC pulsed proton beam to produce pulsed muon beam Forbidden in the Standard Model  clue to the.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Project X Working Group Meeting January 15, :00 PM Snake Pit.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
KA11 Contributions to Mu2e R. Ray Mu2e Project Manager 8/16/2010 1R. Ray.
Mu2e Ron Ray Mu2e Project Manager Fermilab Institutional Review June 6-9, 2011.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
1 Target Introduction Chris Densham STFC/RAL Mu2e Target, Remote Handling, and Heat & Radiation Shield Review Nov
Mu2e Ron Ray Mu2e Project Manager Jan. 11, Scope of Mu2e Project R. Ray - Mu2e Overview 2 Design, construct, and install the Mu2e detector, modify.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
Camera PDR/CD1 Planning 19 September 2008
Head, Office of Project Management Oversight (OPMO)
News and brief overview of Beamline plans for the next few months
Preparations for a Lehman Review
A High Intensity Neutrino Oscillation Facility in Europe
Test Beamline System Requirements and Charge to PDR Committee
CF Scope, Management & Organization
Presentation transcript:

Mu2e WGM 9/15/2010 R. Ray Mu2e Project manager

L2 Systems and Managers R. Ray - Mu2e WGM2 1.2 Accelerator S. Werkema FNAL 1.3 Conventional Construction T. Lackowski FNAL 1.4 Solenoids M. Lamm FNAL 1.5 Muon Channel S. Feher FNAL 1.6 Tracker A.Mukherjee FNAL 1.7 Calorimeter Stefano Miscetti Frascati 1.8 Cosmic Ray Veto C. Dukes UVa. 1.9 Trigger and DAQ M. Bowden FNAL 1.1 Project Management R. Ray FNAL Stefano Miscetti from Frascati has agreed to serve as the L2 Manager for the Calorimeter. We have some catching up to do…

ES&H Completed draft of Preliminary HA (required for CD-1) based on input from L2 Managers  32 pages of text.  96 pages of Hazard analysis sheets  Received a number of useful comments from PPD ES&H. Will send to ES&H for comment, but I think that for CD-1 this is good enough. R. Ray - Mu2e WGM3

QA Plan Draft Quality Assurance Plan written. Sent to Keith Schuh, PPD QA Representative. Comments incorporated. Meeting with Keith and new Lab QA Engineer to talk about how they can help us. Document probably good enough for CD-1. R. Ray - Mu2e WGM4

Acquisition Strategy First draft completed and sent to FSO. Performance parameters defined Alternative and Risk Analysis Recommended Alternative Business and Acquisition Approach – FRA acts as the prime contractor  Major contracts  Special Acquisition Procedures  Performance incentives  Small business approach  Competition Management Structure – IPT Interdependencies and Interfaces R. Ray - Mu2e WGM5

AS - Location Alternatives Fermilab High duty factor beam (90%) Least costly of the fully evaluated alternatives Fermilab staff is the most significant stakeholder BNL Lower duty factor (50%) but potentially higher beam power AGS upgrades more expensive than modifications to Fermilab Accelerator complex Integration issues with RICH program funded out of NP. Los Alamos 800 MeV proton beam ideal for producing low energy muon beam with no antiproton contamination. Low duty factor beam (10%) Detector hall, beam modification costs unknown. R. Ray - Mu2e WGM6

AS - Life Cycle Costs Similar cost to build detector at any US location. Operating costs similar Fermilab requires construction of detector hall. Accelerator modifications at Fermilab less than AGS upgrade. R. Ray - Mu2e WGM7

AS - Technical Alternatives Alternatives for providing proton beam Booster to Recycler to Accumulator to Debuncher to Mu2e Booster to Accumulator to Debuncher to Mu2e  Requires a new transfer line from Booster to Accumulator New dedicated accelerator facility  Non starter. Too expensive. Wait for Project X  Unacceptable delay  Inconsistent with Mission Need Statement Alternatives for Producing a Muon Beam S-shape vs C-shape Transport Solenoid. R. Ray - Mu2e WGM8

AS - Technical Alternatives Detector Alternatives Tracking detectors and calorimeters Cosmic ray veto technologies R. Ray - Mu2e WGM9

Risk Analysis Scope and definition of project - Low Functional performance – Moderate ES&H – Very low Cost and Schedule – Moderate Workforce issues – High Funding and Budget – Low Interfaces and Integration – Low Safeguards and Security – Low Location and Site Conditions – Very low Stakeholder Issues – Very low R. Ray - Mu2e WGM10

CDR Format defined. Preliminary chapters being written. Will meet with L2 mangers next week and provide them with a format and tell them to get started on their chapters.  X.1Introduction  X.2Requirements  X.3Recommended Alternative (includes performance of design, shows how design meets requirements and discusses optimization of design)  X.4Alternatives Considered  X.5Risks  X.6ES&H  X.7Quality Assurance  X.8Value Management  X.9References R. Ray - Mu2e WGM11

Accelerator Progress S. Werkema now fully in charge Progress on external beamline design – impacts building location  We think we are now good for CD-1 Requirement on width of proton pulse (in time) revisited  Went from calamity to small problem that we can deal with.  Narrower pulse is better. Tradeoff with momentum aperture of Accumulator.  Possible technical solutions to make the pulse narrower but we have to understand the cost. Won’t do this for CD-1. Progress on understanding shielding requirements for 25 kW operation.  Skyshine  Electronic berm  Service building floor loading for possible additional shielding.  Cost estimates for supplemental shielding, eberm and fences. R. Ray - Mu2e WGM12

Locations R. Ray - Mu2e WGM13

Solenoid Progress DS in better shape now that we have settled on field requirements. PS and TS continue on good course.  PS – TS interface completed. PS length increased by 67.5 mm to better match fields.  Working to understand mechanical forces in all on-off power scenarios. Working toward magnet CDR that would be sent to vendors as part of an RFI to continue/expand dialogue with industry. Meeting with representative of Babcock Noell next week who will be in the area. R. Ray - Mu2e WGM14

Muon Channel Sandor has a large and diverse system that he is managing well. Weekly meetings Most L3 managers in place Recent progress on  external shielding,  vacuum system,  muon beam stop  TS3 collimator  … R. Ray - Mu2e WGM15

Conventional Construction Good progress on requirements.  Mature draft of requirements document now available. Meetings with stakeholders Beam line length fixed Building location fixed.  Requires road diversion that will have to be costed. Preparing to bring in A&E firm to help with Conceptual Design. R. Ray - Mu2e WGM16

Staffing L2 Managers are doing a good job of identifying L3 managers. For CD-1 I still need  Deputy o Increasing need. I can’t keep up with everything.  Project EE – should have someone on board from PPD soon. o Mu2e, LBNE, CMS all need a Project EE and 3 highly qualified candidates have been identified. o After discussions with the candidates a decision will be made about the best match for each project.  Project Risk Manager o 25% of an FTE at this point. R. Ray - Mu2e WGM17

CD-1 R. Ray - Mu2e WGM18 Lehman CD-1 ReviewMarch 1, 2011 Director’s ReviewFeb. 1, 2011 CDR completeJan. 15, 2011 Final cost & schedule and associated documentation. Jan. 15, 2011 L2 CDR contributions submittedDec. 1, 2010 Pre CD-1 Cost and Schedule ReviewNov 15, 2010 Director’s Design ReviewNov. 1, 2010 L2 Design ReviewsOctober, 2010 Time

Schedule R. Ray - Mu2e WGM19 CD-1CD-2/ 3a CD-3b

Requirements R. Ray - Mu2e WGM20

Action Items Get L2 Manager for calorimeter in place – R. Ray  Done. Have to play catch up now. Get moving on Electronics – Ron Ray  Project EE in place soon. Complete set of requirements documents – Miller/Bernstein  Light at the end of the tunnel, but not there yet. Start scheduling L2 design reviews Develop a plan for Directors Design Review and Pre-CD-1 Review R. Ray - Mu2e WGM21