E906 Changes Paul E. Reimer 8 December 2006 Spectrometer Location Spectrometer’s 2 nd magnet Hodoscopes –Scintillator for Station 1 and 2 –Photomultiplier.

Slides:



Advertisements
Similar presentations
Preparing the Big Bite Hadron Detector Package Gordon Lott, Virginia Tech Mentor: Douglas Higinbotham All the signals from the PMTs are sent via cable.
Advertisements

Introduction of trigger system: E906 as an example Shiuan-Hal,Shiu 05/02/
MTest Facility Low Energy Beam Erik Ramberg AEM 15 October, 2007.
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
A Muon Veto for the Ultra-Cold Neutron Asymmetry Experiment Vince Bagnulo LANL Symposium 2006 Outline ● UCNA Experiment ● Muon background ● Proposed Veto.
20 June 2008E906 Collaboration Meeting1 Tracking Chambers for FNAL E906 Edward R. Kinney University of Colorado, Boulder, USA Overview of Station 1 Status.
A Muon Veto for the Ultra Cold Neutron Asymmetry Experiment Vince Bagnulo with Dr. Jeff Martin Electrons Ultra Cold Neutrons Cosmic Ray Muons Protons Pions.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 17, 2011.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
KEK Beam Test Koji YOSHIMURA KEK MICE Collaboration Meeting Koji YOSHIMURA KEK MICE Collaboration Meeting
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
The Tagger Microscope Richard Jones, University of Connecticut Hall D Tagger - Photon Beamline ReviewJan , 2005, Newport News presented by GlueX.
CMPB Alain Blondel 14 April STATUS OF MICE.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
July 19, 2003 HEP03, Aachen P. Shanahan MINOS Collaboration 1 STATUS of the MINOS Experiment Argonne Athens Brookhaven Caltech Cambridge Campinas Dubna.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
Abilene Christian University Fermilab E906: Hodoscopes for Stations 3 and 4 Donald Isenhower Abilene Christian University Abilene, Texas U.S.A. Use in.
 A GEANT4-based simulation was performed of the production target, solenoid, selection channel, and spectrometer.  The acceptance was found to be 8.3x10.
Shashlik type calorimeter for SHIP experiment
E906/Drell-Yan: Monte Carlo, Data Acquisition and Data Analysis Paul E. Reimer Expected Rates and Monte Carlo (WBS 2.5.1) Data Acquisition (WBS 2.4) –CODA.
1 Charged Kaons at the Main-Injector Measuring |V td | with K +   + Peter Cooper, Fermilab March 26th, 2003 P5 Review. I.Experimental Technique. II.Activities.
E906 Spectrometer Upgrade Overview Paul E. Reimer Experimental Approach Impact on Fermilab Magnet Coil Fabrication Spectrometer Upgrades.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
MEG positron spectrometer Oleg Kiselev, PSI on behalf of MEG collaboration.
Fermilab E906/Drell-Yan: Kick-off Don Geesaman Argonne National Laboratory.
PV-DIS Toroid Detector: outline and costs Paul E. Reimer 12 GeV PV-DIS detector meeting August 1.Introduction to Toroid Concept (presenting work.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
Fermilab Test Beam Facility Aria Meyhoefer (soon to be Soha) May 10, 2010.
Opportunities with Drell-Yan Scattering at Fermilab Paul E. Reimer Physics Division Argonne National Laboratory 1.The Drell-Yan Process—A Laboratory for.
Extraction from the Delivery Ring November 19, 2013 J. Morgan.
Understanding the Origin of the Nucleon Spin Andi Klein, Melynda Brooks, Pat McGaughey and Matt Stettler Research Goals: Use Deeply Virtual Compton Scattering.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 22, 2011.
Improved Measurement of d/u Asymmetry in the Nucleon Sea
E906 Spectrometer Upgrade Overview Paul E. Reimer Magnet Concept Design Estimates (Money & Time)
APS April Meeting Detector Construction of the Forward Proton Detector at D0 Michael Strang University of Texas at Arlington Diffractive Events FPD.
Experimental Nuclear Physics Some Recent Activities 1.Development of a detector for low-energy neutrons a. Hardware -- A Novel Design Idea b. Measure the.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
Magnets Paul E. Reimer 21 June Paul E. Reimer Magnets First Magnet Dual magnet spectrometer Proposal:SM3 coils and SM12 iron to construct first.
Overview of the KEK Neutrino Beam Facility and its Operation Summary after December 2002 (Recovery of SK) K.H. Tanaka for the KEK-PS Beam Channel Group.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
Instrumentation and Simulations for Target Test MICE Collaboration Meeting 22 October Bill Murray 1, Paul Soler 1,2, Kenny Walaron 1,2 1 Rutherford.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, May 25, 2004 Purpose:  Provide pion – muon separation (muon veto)
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
11 December 2006DOE Review at ANL1 Tracking Chambers for FNAL E906 Edward R. Kinney University of Colorado, Boulder, USA Overview of Tracking Plan Station.
Dec. 1, 2005S. Sawada / J-PARC-HS051 Dimuon measurement at J-PARC (LoI-15: Physics of high-mass dimuon production at the 50-GeV Proton Synchrotron) Shin’ya.
HPS Summary Costs, Manpower, Schedule John Jaros Searching for a New Gauge Boson at JLab Jefferson Laboratory September 20, 2010.
Status of the AP2 Optics Keith Gollwitzer Antiproton Source Department November 19, 2004.
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
F ERMILAB T EST B EAM F ACILITY Aria Soha June 12, 2012.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
PROPOSAL FOR A MUON VETO SYSTEM BEHIND THE HADRONIC CALORIMETER (MUV-3) Problems and requirements:  Expected total rate for 9.25 < R < 120 cm: 12.1 MHz:
1/28 VISITS TO COMPASS / NA58 Seminar for guides 9 March 2005 Susanne Koblitz Gerhard Mallot.
Trigger Matrix Shiuan-Hal. Trigger (“times 4”) μ xhodoscopexhodoscope yhodoscopeyhodoscope discriminatorlevel shifter level 1 v1495 level 2 v1495 trigger.
Mott Electron Polarization Results Riad Suleiman July 10, 2013.
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
NA62 Collaboration Meeting – Anacapri 1 September 2009 Massimiliano Fiorini CERN.
MiniBooNE: Status and Plans Outline Physics motivation Beamline performance Detector performance First look at the data Conclusions Fernanda G. Garcia,
Page 1 WP10.2: TA DESY- II Test Beam Facility AIDA-2020 First Annual Meeting Norbert Meyners, Marcel Stanitzki, Natalia Potylitsina-Kube DESY.
FSC status and plans Pavel Semenov IHEP, Protvino
Luminosity Monitor Status
DESY Test Beam Facilities - Status and Plan
Why Consider a Toroid Spectrometer Built Around Existing Hardware?
of secondary light ion beams
M. Jones B. Wojtsekhowski
K. Tilley, ISIS, Rutherford Appleton Laboratory, UK Introduction
Particle ID Diagnostics in the MICE Beamline
Information Systems Server Funding Request
Presentation transcript:

E906 Changes Paul E. Reimer 8 December 2006 Spectrometer Location Spectrometer’s 2 nd magnet Hodoscopes –Scintillator for Station 1 and 2 –Photomultiplier tubes DAQ/Trigger

2 8 December 2006 E906 Changes since Inception Location Fermilab Original Meson East is now not Available Superconducting Cryo- Module Test Facility (SCMTF)

3 8 December 2006 E906 Changes since Inception Meson West NM4 (KTeV) Location Fermilab (cont)

4 8 December 2006 E906 Changes since Inception Location Fermilab NM4 (KTeV) –Beam lime below grade allows for a horizontal bending spectrometer—bends  + and  - into earth. Easier assembly for magnets. –Possibility to use KTeV Magnet –Nicer facility for physicists Meson West –Vertical bend spectro.—bends  + into earth. –2 nd magnet (SM3) must be assembled (but is available)

5 8 December 2006 E906 Changes since Inception Beam Request and Structure Old Plan was for 1 £ protons/s and accumulate 5.3 £ protons on target in 1 year –Unacceptable impact on other Fermilab proton users New Plan –Cut impact on other proton users by ¼ –2 £ protons/s –5 s long slow extraction spill –Total of 5.3 £ protons in 2 years (with some allowance for normal Fermilab maintenance shutdowns, etc

6 8 December 2006 E906 Changes since Inception M1 Magnet New coils Reuse whole pieces of SM12 magnet yoke (SM12 was the 14.4 m dipole used by E866)

7 8 December 2006 E906 Changes since Inception 2 nd Spectrometer Magnet Originally proposed Jolly Green Giant, 1.65 T-m (500 MeV p T ) 80 £ 50 in. –In use by E907/MIPP (although their future is uncertain) –Possibly in need of repairs Other magnets have become available: –SM3 (BTeV is no longer with us) 3 T-m, (900 MeV p T ) 60 £ 60 £ 210 inches –KTeV Magnet (CKM and KAMI are no longer with us) ¼ 2 T-m, (600 MeV p T ) 2m £ 2m £ 200 inches Impact on measurements (Monte Carlo from ACU students): –Momentum (and hence M and x F ) resolution dominated by multiple scattering and energy loss in absorber until p T kick < 200 MeV –Acceptance also approximately the same for p T kick of 900 to 400 MeV Plan: –MWest—Fermilab reassembles SM3 –NM4 (KTeV) relocate KTeV magnet to appropriate position

8 8 December 2006 E906 Changes since Inception Scintillator for Hodoscopes: Station 1 and 2 Original plan was to purchase new material for all stations Current plan: –Purchase new material for Stations 3Y, 4Xa, 4Xb, 4Y (Abilene) –Recover material for Stations 1X, 1Y, 2X, 2Y from HERMES muon hodoscopes which will have to be refashioned and polished in one dimension. (Naomi Makins, Illinois) –Purchase new light guide material for all stations.

9 8 December 2006 E906 Changes since Inception Photomultiplier Tubes for Double Ended Readout Original plan was to purchase ¼ 220 new 2” PMT’s to add double ended readout to Station 3 and 4 Hodoscopes, in addition to reusing E866 PMT’s Current plan: –Recover ” PMT’s/bases/shields from ZEUS at DESY (Argonne’s HEP) rather than new purchase (more could be available) –Cockroft Walton PMT bases with power supply –Need to test PMT’s, both ZEUS and old E866

10 8 December 2006 E906 Changes since Inception DAQ Old plan was to borrow Fermilab E871 DAQ running Fermilab DART system –Still available to us (I verified this in November) –Do we really want the DAQ running on 10 yr old hardware? –DART is no longer supported at Fermilab; although, there is no operational, Fermilab-supported system appropriate for E906 Solution: –JLab CODA system –Need to implement Nevis bus readout –Need to implement FERA readout Either solution will need local (collaboration) expert(s)

11 8 December 2006 E906 Changes since Inception Trigger Old Plan was to Implement in copies of LeCroy Logic Units –Units no longer available –Expensive to duplicate units –Technology has evolved New plan (Rutgers, Ron Gilman) –Implement in FPGA –Much cheaper, more flexible logic

12 8 December 2006 E906 Changes since Inception Bottom Line E906 has changed in terms of implementation Physics goals have not changed and will be reached with new configuration Hope to start construction in 2007 and start taking data in summer 2009