Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Slides:



Advertisements
Similar presentations
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Advertisements

Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
ThemeGallery PowerTemplate
Fill in missing numbers or operations
A special large aperture BPM at FLASH Nicoleta Baboi for Kirsten Hacker BPM Workshop, Lüneburg, Nov. 30, 2006.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Chapter 5: Workforce. Chartbook 2003 Physician Workforce After dropping slightly in 1999, the number of active physicians per thousand population rose.
Prospect Management In a Capital Campaign Tuesday October 28, :15 – 2:05 pm Sharon L. Upton, Director of Development Research.
AS. 02/03 Finding fractions of a quantity AS. 02/03.
Science Jeopardy >>>> Topic 1 Topic 2 Topic 4 Topic Topic 5.
Who Wants To Be A Millionaire?
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Friday 2/11 HW: NONE 1.Get out last nights HW 2.While I am checking, log onto the computer. 3.While waiting to log in, complete 6-2 B #1-8 in your packet!
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
Break Time Remaining 10:00.
The basics for simulations
ESLS 04 Daresbury Laboratory
FEL Beam Dynami cs FEL Beam Dynamics T. Limberg Short Bunches at FLASH.
Status and Future of BESSY RF BESSY II operating since 1999 Willy Wien Laboratory groundbreaking 9/2004 HoBiCaT Testfacility for sc cavities Commissioning.
17 Sample Markup Problems
We are learning how to read the 24 hour clock
Marks out of 100 Mrs Smith’s Class Median Lower Quartile Upper Quartile Minimum Maximum.
First Results from the ERL Prototype (ALICE) at Daresbury David Holder, on behalf of the ALICE team. LINAC'08 Victoria, BC.
CF Winter Questions 1. What cash flows should I consider? 2. How does the market set r ? 3. How should I set r ?
1 J-PARC and T2K 1.Accelerator construction status and commissioning 2.Accelerator upgrade plan in first 5 years 3.Experiments with slow extracted beam.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Wolfgang Anders, Helmholtz-Zentrum Berlin for materials and energy (HZB) ESLS-RF Meeting ESRF Status of RF at HZB and SRF at BERLinPro.
FEL and linac plans at MAX IV laboratory
Plasma Wakefield Acceleration at CLARA G. Xia Cockcroft Institute University of Manchester 113/01/2014IoP CLARA Community Meeting.
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Fundamentals of Cost Analysis for Decision Making
Partial Products. Category 1 1 x 3-digit problems.
Select a time to count down from the clock above
Multi-user, High Repetition-Rate, Soft X-ray FEL User Facility (based on a Collinear Dielectric Wakefield Accelerator) Euclid Techlabs LLC: C.Jing, A.Kanareykin,
20 pt 30 pt 40 pt 50 pt 10 pt 20 pt 30 pt 40 pt 50 pt 10 pt 20 pt 30 pt 40 pt 50 pt 10 pt 20 pt 30 pt 40 pt 50 pt 10 pt 20 pt 30 pt 40 pt 50 pt 10 pt.
Beam dynamics meeting, 2007/05/14Lars Fröhlich, MPY Dark Current Transport at FLASH Start-to-end tracking simulation analysis of beam and dark current.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
© 2006, François Brouard Case Real Group François Brouard, DBA, CA January 6, 2006.
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
TTF1/TTF2/XFEL/LC stability/reliability Stability: FEL requests beyond specs. What was measured? What needs to be measured What needs to be compared to.
The BESSY Soft X-Ray SASE FEL (Free Electron Laser)
Linear Collider Machine Protection Issues M. Palmer Injection System Injector Damping Rings Bunch Compressor and Transfer Sections Main LINAC Beam Delivery.
Low Emittance RF Gun Developments for PAL-XFEL
TTF-II Status & Prospectives Nick Walker DESY 5 th ITRP Meeting – CALTECH.
TTF2 Start-to-End Simulations Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Zeuthen, 22 Jan 2004.
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
DESY / Hans Weise TTF / VUV-FEL Status and Some Words of Fast Kickers Hans Weise / DESY DESY meeting with KEK ILC Delegation (March 7th 2005)
1 R.M. Jones, Overview of SRF HOM Diagnostic Task, CEA, Saclay, April 16 th 2014 Nicoleta Baboi, Ursula van Rienen Roger M. Jones DESY, Univ. of Rostock,
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
TESLA Linear Collider project overview and linac technology R. Brinkmann, DESY ITRP Meeting, RAL Jan. 28, 2004.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
 Understand why schools ask students to give presentations.  Understand what makes a good presentation.  Learn about structuring a presentation. 
Contribution of Ankara University Accelerator Technology Institute
E-XFEL Status and First Beam Results
Accelerator Layout and Parameters
XFEL Project (accelerator) Overview and recent developments
Electron Source Configuration
Hans Weise, DESY February 5th, 2019
Presentation transcript:

Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise

Status 4/ kV thermionic gun 4 accelerator modules beam dump

Hans Weise First discussions about the TTF FEL Spring 1994 First 250 keV beam on

Hans Weise

Hans Weise TESLA Test Facility Linac Common effort of almost all laboratories using s.c. accelerating cavities, e.g. (CERN), Cornell, DESY, INFN, (KEK), Saclay, TJNL 40 partners from 11 countries More than 75 cavities with gradients up to 35 MV/m

Hans Weise

First lasing of the TTF FEL

Hans Weise TESLA Test Facility - Operation week 3 / 2002 FEL User Operation week 7 / 2002 Accelerator Studies 100% 80% 60% 40% 20% Beam uptime and operational uptime (users or acc.studies) The TTF Linac was operated 7 days per week, 24 hours. Approx. 50% of the time was allocated to FEL operation including a large percentage of user time. The FEL requires very stable beam conditions. In its different set-ups, approx. 13,000 hours beamtime were achieved since Based on the TTF experience several FELs using superconducting accelerator technology are proposed week

Hans Weise ACC6 BYPASS UNDULATOR DUMP COLLIMATOR ACC7 SEED ACC1ACC2ACC3ACC4ACC5RF-GUN BC2BC3e - beam a new RF Gun a new injector conceptInjector 3 three new accelerator modulesACC3 to ACC5 (3*, 4, 5) and later this year another twoACC1 and ACC2 (2*, 1*) another bunch compressorBC3 new beamlinesmore than 150 m a new collimator concepttransv. and energy collim. a long undulator6 modules, 30 m a long bypass and a spectrometer line

Hans Weise ACC6 BYPASS UNDULATOR DUMP COLLIMATOR ACC7 SEED ACC1ACC2ACC3ACC4ACC5RF-GUN BC2BC3e - beam Common effort of almost all laboratories using s.c. accelerating cavities, e.g. (CERN), Cornell, DESY, INFN, (KEK), Saclay, TJNL 40 partners from 11 countries And again... Finally well have 48 s.c. cavities at TTF2. This is a great test facility for both the X-FEL and the TESLA LC.

Hans Weise

Speakers of the next session are... Mr. X Mrs. Y Chair Person to introduce the topics to prepare the disussion to collect the distributions

Hans Weise Whats your experience with... Have you ever used... What are your plans concerning... Informal Discussions should be used for the exchange of knowledge / info preparation of discussions reviews and planning

Hans Weise Topic 1 Topic 2 other stuff Flipchart to collect topics for the Open Plenary Discussion

Hans Weise

Welcome My talk is about the most.. Some young and unexperienced speaker need your help! Thanks... un- interesting section of TTF2. Therefore I dont like to talk at all! And my English is so bad. I dont know how to say this. There are so many faces... I dont like to see them! OK! Lets enjoy the TTF2 Meeting.